ND-71548 (E) ISSUE 2 Installation Manual AUGUST 2002 NEC Corporation To view the latest issue of this document go to NEC Knowledgebase @ http://www.kbase.
LIABILITY DISCLAIMER NEC Corporation re serves the right to change the specificati ons, functions, or features, at any time, withou t notice. NEC Corpora tion has pr epared this document for use by its employ- ees and customers.
ND-71548 (E) PRODUCT LIABILITY PL- 1 Issue 2 PRODUCT LIABILITY BEFORE THE USE OF THIS MANUAL 1. FOR SAFETY USE Here explains the safety use for the customer, which prev ents danger to the life and damage to the property ac- cidentally. The following are symbols and their meanings.
PRODUCT LIABI LITY ND-715 48 (E) PL- 2 Issue 2 PRODUCT LIABI LITY 2. NOTICE WHEN USED 2.1 Consideration of PBX, Power-rela ted Equipme nt and Peripheral Equipment This item describes the consideration before using PBX, the power-related eq uipment, and the peripheral equip- ment (such as console, MDF, DAU, telephone, PC, printer, etc).
ND-71548 (E) PRODUCT LIABILITY PL- 3 Issue 2 PRODUCT LIABILITY DANGER Do not damage, rem ake, forcefully bend, for cefully extract, nor for cefully twist an elec- tric code and a wiring to/from PBX, Main Power and peripheral equip ment. It might cause a fire, an electric shock, or a failure.
PRODUCT LIABI LITY ND-715 48 (E) PL- 4 Issue 2 PRODUCT LIABI LITY WARNING Fix the equipment. Do not put any obj ect on PBX and Main Power; it m ight be danger- ous if the object sho uld fall down. When plugging off a plug, be sure to grip the plug and extract it.
ND-71548 (E) PRODUCT LIABILITY PL- 5 Issue 2 PRODUCT LIABILITY WARNING Be careful of using a battery as following: Rechargeable lead battery is used as the emergency battery of PBX. Check the back- up for an electricity failure. Battery electrolyte is harmful to human body.
PRODUCT LIABI LITY ND-715 48 (E) PL- 6 Issue 2 PRODUCT LIABI LITY ATTENTION Do not use benzine, thinner, and alcohol for cleaning. When it is di fficult to clean dust and dirt, put weaken neutral detergent onto a cloth, and give the cloth a wiring . Clean dust and dirt w ith the cloth, and rub them with a dry cloth.
ND-71548 (E) PRODUCT LIABILITY PL- 7 Issue 2 PRODUCT LIABILITY 2.2 Inst allation Environment These items describe the consid eration before the installation. Preserve the following: 2.2.1 Oscill ation 2.2.2 Floor , Wa ll and Ceiling 2.2.3 Window s 2.2.
PRODUCT LIABI LITY ND-715 48 (E) PL- 8 Issue 2 2.2.5 Saf ety Environment 2.2.6 T emperature and Humidity 2.2.7 Air Conditioning Facilities 2.3 Notice Regarding Lightenning Strik es WARNING Consider countermeasures for di sasters (such as firing, flood, and earthquake) and safety for the operator .
ND-71548 (E) PRODUCT LIABILITY PL- 9 Issue 2 PRODUCT LIABILITY 2.4 Period ic Repair Part s and Disp osables ATTENTION Replace the periodic repair parts such as fan, batt ery , backup battery , HD, fuse, and display . If not change the parts and past the period ic term, sudd en traffic fault might lead t o the whole system fail ure and damaging.
PRODUCT LIABI LITY ND-715 48 (E) PL- 10 Issue 2 PRODUCT LIABI LITY This page is for your notes..
ND-71548 (E) ISSUE 2 AUGUST, 2002 NEAX2400 IPX Internet Protocol eXc h ange Inst allation Manual T ABLE OF CONTENTS Page ND-71548 (E) T ABLE OF CONTENTS Page i Issue 2 CHAPTER 1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
T ABLE OF CONTENTS ND-71548 (E) Page ii Issue 2 T ABLE OF CO NTENTS (CONTINUED) Page CHAPTER 3 INSTALLATION PROCEDU RE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 1. GENERAL . . . . . . . . . . . . .
ND-71548 (E) T ABLE OF CONTENTS Page iii Issue 2 T ABLE OF CO NTENTS (CONTINUED) Page NAP-200-015 Cable Ter mination and Cross Connectio ns from MDF to Peripheral Equipment, C. O. Lines, and Tie Lines . . . . . . . . . . . . . . . . . . . . . . . . . .
T ABLE OF CONTENTS ND-71548 (E) Page iv Issue 2 T ABLE OF CO NTENTS (CONTINUED) Page NAP-200-020 Program Install and Load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 297 NAP-200-021 Assignment of Office Data .
ND-71548 (E) T ABLE OF CONTENTS Page v Issue 2 T ABLE OF CO NTENTS (CONTINUED) Page 6.1 Outline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 362 6.2 IP Connection T est Procedure .
T ABLE O F CONTEN TS ND-71 548 (E) Page vi Issue 2 This page is for your notes..
ND-71548 (E) CHAPTER 1 Page 1 Issue 2 INTRODUCTIO N CHAPTER 1 INTRODUCTION 1. GENERAL The figure below shows the o uter view of the NEAX2400 IPX-r eferred to in the remainder of this manual as “the system.
CHAPTER 1 ND- 71548 (E) Page 2 Issue 2 INTRODUCTION The figure below shows an example of the system configuration of NEAX2400 IPX. PHA : Handles control sign als sent to/fr om an analog terminal connected to Analog Media Con- verter . PHD : Handles control signals sent to/from IP terminals such as D term IP INASET and D term SP20 .
ND-71548 (E) CHAPTER 1 Page 3 Issue 2 INTRODUCTIO N 2. HOW TO FOLLOW THE MANUAL 2.1 Outline The requiring work is divided into the following chapters. Basica lly, the work is performed in the order of.
CHAPTER 1 ND- 71548 (E) Page 4 Issue 2 INTRODUCTION Figure 1- 3 Exampl e of NAP NAP- 200-004 Sheet 3/3 Installation of the Base Unit 1. INSTALLING THE BASE UN IT USING A SPECIAL STAND ST AR T Securing the Base Unit Secure the Base Un it onto the special stand as per Figure 004-4.
ND-71548 (E) CHAPTER 1 Page 5 Issue 2 INTRODUCTIO N 2.3 How T o Follow T rees This manual explains performance of a predetermined procedure (work contents covered in each NAP) in a “Tree” format as shown in Fig ure 1-4. Before engagi ng in the intended work, be su re to understand the work contents by tracing the given tree.
CHAPTER 1 ND- 71548 (E) Page 6 Issue 2 INTRODUCTION Figure 1-5 S t atic Caution Indication This manual provides “Static Caution” in dicators (see Figure 1-5) on pages where work involving static-sensi- tive components is described.
ND-71548 (E) CHAPTER 1 Page 7 Issue 2 INTRODUCTIO N 2.4 Figure an d T able Numbers Each Figure and Table within this manual are numbered as shown below. 1. Figure and table in NAP Figure XXX-X Serial number of Figures in each NAP Serial number (000-999) of the NAP in which the Figure exists.
CHAPTER 2 ND- 71548 (E) Page 8 Issue 2 INST ALLA TI ON DESIGN CHAPTER 2 INST ALLA TION DESIGN 1. GENERAL This chapter provides informa tion pertaining to installation design and preparation of the required installation materials.
ND-71548 (E) CHAPTER 2 Page 9 Issue 2 INST ALLA TION DESIGN Note: A short period means a period not exceeding thr ee cons ecutive days (72 hours) or 15 days (360 hours) in a year . 2.2 Heat Genera tion From Switching Equipment Figure 2-1 shows heat generation from the switching equipment with respect to current consumption.
CHAPTER 2 ND- 71548 (E) Page 10 Issue 2 INST ALLA TI ON DESIGN 3. FLOOR SP ACE 1. The PBX requires floor space for the following system equipment: • Switching Equipment (Mo d ule Group) • Maintenance Administration T ermina l (MA T) •M D F •R e c t i f i e r • Batteries • Attendant Console 2.
ND-71548 (E) CHAPTER 2 Page 11 Issue 2 INST ALLA TION DESIGN 5.2 Wall Switching Equipment Room • A concrete wall is necessary so that cable ra cks can be installed (unless a free-access floor is used). • It is recommended that the walls be painted so that the wall mate rials do not generate dust, etc.
CHAPTER 2 ND- 71548 (E) Page 12 Issue 2 INST ALLA TI ON DESIGN Note 1: When the rectifier is in the equalize state (char ging the batteries), the output DC voltage should be 1.5 to 2 volts higher than the float voltage. Examples of th e voltages for floating and equalizing ar e listed below: Float: 50.
ND-71548 (E) CHAPTER 2 Page 13 Issue 2 INST ALLA TION DESIGN 6.3 Power Distribution Box Requirement s The Power Distribution Box (PDB) should be installed with the follo wing considerations: 1.
CHAPTER 2 ND- 71548 (E) Page 14 Issue 2 INST ALLA TI ON DESIGN 8. INST ALLA TION TOOLS T able 2-2 shows the tools used in a typical NEAX2400 IPX installation.
ND-71548 (E) CHAPTER 2 Page 15 Issue 2 INST ALLA TION DESIGN 9. SYSTEM ACCOMMODA TION 9.1 System Accommodation Module Group Configuration a nd Conditions for Configuration The module group configuration of the PBX is shown in Figure 2-3, and the cond itions for configuration are shown in T able 2-3.
CHAPTER 2 ND- 71548 (E) Page 16 Issue 2 INST ALLA TI ON DESIGN Note: A NFILU is mounted in BASEU. T able 2-3 Conditions for Configurat ion UNIT NAME NUMBER OF MODUL ES CONDITIONS REMARKS FANU (Fan Uni.
ND-71548 (E) CHAPTER 2 Page 17 Issue 2 INST ALLA TION DESIGN Figure 2-4 T ime Slot, Group Number Assignme nt Note 1: Extended Group No. can be used by FCH (P A-FCHA) car d.
CHAPTER 2 ND- 71548 (E) Page 18 Issue 2 INST ALLA TI ON DESIGN Figure 2-5 Face Layout (Single IMG Co nfiguration) 01 03 04 05 06 07 08 PWR #0 (PX-PW01) PWR #1 (PX-PW01) EMA (PX-PC00-A) IOC (PX-IO00) MISC MISC MISC SYSTEM SELECT 0 SYSTEM SELECT 1 SYSTEM SELECT 2 CPURST POWER SENSEMBR STATUS IMG 13 2 LOAD SLOT NO.
ND-71548 (E) CHAPTER 2 Page 19 Issue 2 INST ALLA TION DESIGN Figure 2-6 Face Layout of Multiple IMG System (IMG0) 01 03 04 05 06 07 08 PWR #0 (PX-PW01) PWR #1 (PX-PW01) EMA (PX-PC00-A) IOC (PX-IO00) MISC/IOC MISC MISC SYSTEM SELECT 0 SYSTEM SELECT 1 SYSTEM SELECT 2 CPURST POWER SENSE MBR STATUS IMG 13 2 LOAD SLOT NO.
CHAPTER 2 ND- 71548 (E) Page 20 Issue 2 INST ALLA TI ON DESIGN Figure 2-7 Face Layout of Multiple IMG System (IMG1) 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 P A-PW55-B (.
ND-71548 (E) CHAPTER 2 Page 21 Issue 2 INST ALLA TION DESIGN Figure 2-8 Face Layout of Multi ple IMG Syst em (IMG2/3) 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 P A-PW55-B.
CHAPTER 2 ND- 71548 (E) Page 22 Issue 2 INST ALLA TI ON DESIGN 9.2 Circuit Card Locations This section explains the main functio n of controlling circuit cards on a modu le basis. For more detai led infor- mation on each card, please refer to the NEAX2400 IPX Circuit Card Manua l.
ND-71548 (E) CHAPTER 2 Page 23 Issue 2 INST ALLA TION DESIGN Figure 2-10 Controlling Circuit Cards in PIM 0 (Single IMG C onfiguration Only) T able 2-5 Controlling Circuit Card s in PIM 0 (Single IMG Configuration Only) Slot No.
CHAPTER 2 ND- 71548 (E) Page 24 Issue 2 INST ALLA TI ON DESIGN Figure 2-1 1 Controlling Circuit Cards in PIM T able 2-6 Controlling Circuit Cards in PIM Slot No. Circuit Card Symbol Functions, Mounting Conditions 01 PA-PW55-B PWR This circuit card supplies oper ating power to circuit cards accommodate d in the PIM.
ND-71548 (E) CHAPTER 2 Page 25 Issue 2 INST ALLA TION DESIGN Figure 2-12 Controlling Circuit Ca rds in TSWM (Multiple IMG Configur ation) T able 2-7 Controlling Circuit Ca rds in TSWM (Multiple IMG Configuration) Slot No.
CHAPTER 2 ND- 71548 (E) Page 26 Issue 2 INST ALLA TI ON DESIGN 9.3 Prep aration of T runking Diagram Prepare the trunking diagram for the customer’s specifi cation. Sinc e there are different types of switching of- fices (such as a single office, network offices, etc.
ND-71548 (E) CHAPTER 2 Page 27 Issue 2 INST ALLA TION DESIGN 10.1 AC Input, DC Power , And Ground Cables 1. For AC input cable, VCT (Polyvinyl Chloride Cabtyre Ca ble) is to be used. Howe ver, if shielding is nec- essary , as is the case when the AC input cable is to be installe d in parallel with a low -voltage power ca ble, etc.
CHAPTER 2 ND- 71548 (E) Page 28 Issue 2 INST ALLA TI ON DESIGN Figure 2-14 DC Main Power Cable and Ma in Ground Cable (3 - or 4-PIM System) (Sin gle IMG Configuration) BA TTERY AC POWER DISTRIBUTION B.
ND-71548 (E) CHAPTER 2 Page 29 Issue 2 INST ALLA TION DESIGN Figure 2-15 DC Main Power Cable and Ma in Ground Cable (Multiple IMG Configuration ) BA TTERY AC POWER DISTRIBUTION BOARD VCT BA TTERY CABLES RECTIFIER POWER AND GROUND CABLES Earth Bar AC SERVICE OUTLET MA T MDF GROUND TERMINAL G IV (G) (ex.
CHAPTER 2 ND- 71548 (E) Page 30 Issue 2 INST ALLA TI ON DESIGN T able 2-8 Clamp T erminal Shape and Purpose TYPE SHAPE PURPOSE REMARKS A End terminal T Branch or extend power cable.
ND-71548 (E) CHAPTER 2 Page 31 Issue 2 INST ALLA TION DESIGN Note: Selection of T -T ype Clamp T erminal The asterisk (*) in T able 2-9 indicates that an aux iliary conductor is necessary when using a main power wire and a branch po wer wire of a thinner diameter, an d the clamp terminal of the type indicated in the selected co lumns.
CHAPTER 2 ND- 71548 (E) Page 32 Issue 2 INST ALLA TI ON DESIGN Figure 2-16 Calculation Method for Sectional Area T able 2-10 Clamping T ool *TOOL TYPE APPLICABLE CROSS SECTION OF WIRE (mm 2 ) ACCESSORIES REMARKS No. 1 0.25 ~ 6.64 Manual type for A and C type terminal No.
ND-71548 (E) CHAPTER 2 Page 33 Issue 2 INST ALLA TION DESIGN 10.2 Cables Between The PBX And MDF Regarding lines, trunks, and NCU (P FT), 25P shielded the PBX and the MDF are connected by using cables with a CHAMP (Amphenol) connector at one end. T able 2-1 1 show s the procedure for calculating the required number of cables.
CHAPTER 2 ND- 71548 (E) Page 34 Issue 2 INST ALLA TI ON DESIGN Figure 2-17 Outline of Cable s from Module Group to the Out side CONNECTOR DESIGNA TION LEAD DESIGNA TION CONNECTOR DESIGNA TIION LEAD DESIGNA TION MDF INST . CABLE CABLE CABLE INST . INST .
ND-71548 (E) CHAPTER 3 Page 35 Issue 2 INST ALLA TION PROCEDURE CHAPTER 3 INST A LLA TION PROCEDURE 1. GENERAL This chapter explains the procedures for installing the PBX, the Mainte nance Administration Terminal (MAT), Desk Consoles, and vario us types of term inal equipment (single line telephones, D term s, Data Modules, etc.
CHAPTER 3 ND- 71548 (E) Page 36 Issue 2 INST ALLA TION PROCEDURE 2. PRECAUTIONS BEFORE BEG INNING INST ALLA TION 2.1 Outline 1. Before beginning the installation, check to see if the installation requ irements (grounding, the quantity and kind of installation cables, etc.
ND-71548 (E) CHAPTER 3 Page 37 Issue 2 INST ALLA TION PROCEDURE 4. As the cable to be run between the PBX and the Rec tifier, use a CV cable (600 V Crosslinked Polyethylene Insulated PVC Sheathed Cable) as the circumstance pe rmits.
CHAPTER 3 ND- 71548 (E) Page 38 Issue 2 INST ALLA TION PROCEDURE 3. INST ALLA TION PROCEDURE The flowchart in Figure 3-2 shows th e installation procedure. Each step is assigned a NAP number. NAPs NAP- 200-001 through NAP-200-018 follow Figu re 3-2. These NAPs should be followed sequen tially when perform- ing the installation.
ND-71548 (E) CHAPTER 3 Page 39 Issue 2 INST ALLA TION PROCEDURE This NAP explains the following work items: • Confirmation of Equip m ent Locations • Confirmation of Floor Layout • Confirmation .
CHAPTER 3 ND- 71548 (E) Page 40 Issue 2 INST ALLA TION PROCEDURE NAP-200-001 Sheet 2/2 Installation Preparation Proper Locations: • A dry and clean place. • A place that is well ventilated. • A sufficiently illuminated room. (200 lux at floor level).
ND-71548 (E) CHAPTER 3 Page 41 Issue 2 INST ALLA TION PROCEDURE This NAP explains the procedures for marking, drilling and other necessary work when the PBX is to be installed on a free-access floor by either on e of the following three methods.
CHAPTER 3 ND- 71548 (E) Page 42 Issue 2 INST ALLA TION PROCEDURE 1. WHEN SECURING THE PBX DIRECTL Y ONTO THE FLOOR NAP-200-002 Sheet 2/8 Marking, Leveling, and Drilling START Marking Referring to Figure 002-1, mark the holes for the anchor bolts of the base unit.
ND-71548 (E) CHAPTER 3 Page 43 Issue 2 INST ALLA TION PROCEDURE Figure 002-1 Locatio ns of Base Unit Securing Holes NAP-200-002 Sheet 3/8 Marking, Leveling, and Drilling Multiple IMG Configuration Single IMG Configuration 85(3.35") 55(2.17") 410(1'4.
CHAPTER 3 ND- 71548 (E) Page 44 Issue 2 INST ALLA TION PROCEDURE Figure 002-2 Cable Hole on a Free-Access or Computer Floor NAP-200-002 Sheet 4/8 Marking, Leveling, and Drilling REAR FRONT PBX CABLE HOLE FREE-ACCESS FLOOR Unit: mm(inch) 100(3.94") 1 1 5(4.
ND-71548 (E) CHAPTER 3 Page 45 Issue 2 INST ALLA TION PROCEDURE 2. WHEN SECURING THE PBX WITH THE SPECIAL S T AND NAP-200-002 Sheet 5/8 Marking, Leveling, and Drilling START Marking and Drilling of Special Stand Drill the Special Stand for securing the PBX.
CHAPTER 3 ND- 71548 (E) Page 46 Issue 2 INST ALLA TION PROCEDURE Figure 002-3 Example of S pecial St and Figure 00 2-4 Special St and Installation Method NAP-200-002 Sheet 6/8 Marking, Leveling, and Drilling 410 (1'4.14") 85 (3.35") 40 (1.
ND-71548 (E) CHAPTER 3 Page 47 Issue 2 INST ALLA TION PROCEDURE 3. WHEN SECURING PBX WITH FLOOR ELEV A T IONS Figure 002- 5 Example of Elev ation NAP-200-002 Sheet 7/8 Marking, Leveling, and Drilling ST AR T Installing the Floor Elevation Secure the Fl oor Elevation on the concrete floor.
CHAPTER 3 ND- 71548 (E) Page 48 Issue 2 INST ALLA TION PROCEDURE 4. MARKING , LEVELING AND DRILLING FOR MDF , PO WER EQUIPMENT , AND PERIPHERAL EQUIPMENT NAP-200-002 Sheet 8/8 Marking, Leveling, and Drilling ST AR T Leveling Measure the level of floor surface and determine the reference level.
ND-71548 (E) CHAPTER 3 Page 49 Issue 2 INST ALLA TION PROCEDURE This NAP explains the p rocedur e for unpacking and inspection. Note 1: If any equipment is missing or damaged, r eport it to the supplier immediately . Note 2: Save all packing materials and boxes so that they can be used to r eturn damage d equipment to the supplier .
CHAPTER 3 ND- 71548 (E) Page 50 Issue 2 INST ALLA TION PROCEDURE 2. INSPECTION NAP-200-003 Sheet 2/2 Unpacking and Inspection ST AR T Visually Inspect Modules and Units Overall distortion. Scratches or dents on the surface. Distortion of shelves. Cracks to connectors on the backplane.
ND-71548 (E) CHAPTER 3 Page 51 Issue 2 INST ALLA TION PROCEDURE This NAP explains the procedure for securing the Base Unit onto the floor directly or using special stand.
CHAPTER 3 ND- 71548 (E) Page 52 Issue 2 INST ALLA TION PROCEDURE Figure 004-2 Mountin g the Base Unit on a Free-Access or Computer Floor Figure 004-3 Mounting the Base Unit on a F ree-Access or Comput.
ND-71548 (E) CHAPTER 3 Page 53 Issue 2 INST ALLA TION PROCEDURE 2. INST ALLING THE BASE UNIT USING A SPECIAL S T AND Figure 004-4 Setting the BASEU via Specia l St and NAP-200-004 Sheet 3/3 Installation of the Base Unit ST AR T Securing the Base Unit Secure the Base Unit on to the special stand as per Figure 004-4.
CHAPTER 3 ND- 71548 (E) Page 54 Issue 2 INST ALLA TION PROCEDURE 1. MOUNTING OF UNITS AND MODULES Figure 005-1 Procedure f or Mounting Units and Modules NAP-200-005 Sheet 1/18 Mounting of Units and Modules ST AR T END Mounting of Modules, FAN BOX and TOPU Mount modules, FAN BOX and TOPU for each cab inet, by referring to the Figure 005-1.
ND-71548 (E) CHAPTER 3 Page 55 Issue 2 INST ALLA TION PROCEDURE 2. INST ALLA TION OF F ANU Location of F ANU (PZ-M369 and three electronic F ANs) is shown in Figure 005-2. Depending on you r system con- figuration, mount the F ANU in the proper position.
CHAPTER 3 ND- 71548 (E) Page 56 Issue 2 INST ALLA TION PROCEDURE 3. PROCEDURE FOR F ANU ON THE TOPU When any IMG is configured by two PIMs or less, the F ANU is mounted as shown in Figure 005-3.
ND-71548 (E) CHAPTER 3 Page 57 Issue 2 INST ALLA TION PROCEDURE STEP 4: Fix a FAN fuse (5.0A) onto the PZ-M369. Figure 005-4 Att achment of F AN Fuse (PZ-M369) STEP 5: Connect the FAN cables as shown in Figure 005-5 and Figure 005-6. STEP 6: Lastly, attach the Top Cover on to the TOPU of the cabinet.
CHAPTER 3 ND- 71548 (E) Page 58 Issue 2 INST ALLA TION PROCEDURE Figure 005-5 Cable Connections for F ANU on TOPU NAP-200-005 Sheet 5/18 Mounting of Units and Modules PBX NEC NEC .
ND-71548 (E) CHAPTER 3 Page 59 Issue 2 INST ALLA TION PROCEDURE Figure 005-6 Connection of “F AN” Connector Cable (T OPU-PIM) NAP-200-005 Sheet 6/18 Mounting of Units and Modules PBX TOPU PIM (FAN.
CHAPTER 3 ND- 71548 (E) Page 60 Issue 2 INST ALLA TION PROCEDURE Figure 005-7 Att achment of the T op Cover NAP-200-005 Sheet 7/18 Mounting of Units and Modules NEC Top Cove r TOPU PIM Mount the T op Cover onto the TOPU. Then, fasten the four screws by using the Phillips screwdriver .
ND-71548 (E) CHAPTER 3 Page 61 Issue 2 INST ALLA TION PROCEDURE 4. PROCEDURE FOR F ANU IN THE F AN BOX When any IMG is configured by 3 or 4 PIMs, the F ANU mu st be accommodated within the F AN BOX in the center of the cabinet.
CHAPTER 3 ND- 71548 (E) Page 62 Issue 2 INST ALLA TION PROCEDURE Figure 005-8 Relocation of F ANU and Insertion into F AN BOX NAP-200-005 Sheet 9/18 Mounting of Units and Modules Screws for F AN Mount.
ND-71548 (E) CHAPTER 3 Page 63 Issue 2 INST ALLA TION PROCEDURE Figure 005-9 F AN Cable Connecti ons for FC0/FC1/FC2 Conne ctors NAP-200-005 Sheet 10/18 Mounting of Units and Modules FC0 FC1 FC2 ATTEN.
CHAPTER 3 ND- 71548 (E) Page 64 Issue 2 INST ALLA TION PROCEDURE STEP 5: Fix a FAN fuse (5.0A) onto the PZ-M369 by referring to Figure 005-4. STEP 6: Connect the remaining FAN cables as per Figure 005-1 0 and Figure 005-1 1. STEP 7: Lastly, attach the Top Cover on to the TOPU of the cabinet.
ND-71548 (E) CHAPTER 3 Page 65 Issue 2 INST ALLA TION PROCEDURE Figure 005-10 Cable Conne ctions for F ANU in F AN BOX NAP-200-005 Sheet 12/18 Mounting of Units and Modules FAN BOX PZ-M369 TH0TH1 TH2F AN T ALM0 Note 2 T ALM THM TOPU (T op View) Note 1 PZ-M369 (Front View) NEC NEAX 2400 IMS PBX TOPU NEC .
CHAPTER 3 ND- 71548 (E) Page 66 Issue 2 INST ALLA TION PROCEDURE Figure 005-1 1 Connection of “F AN” Connector Cable (F AN BOX-PIM) NAP-200-005 Sheet 13/18 Mounting of Units and Modules ATTENTION .
ND-71548 (E) CHAPTER 3 Page 67 Issue 2 INST ALLA TION PROCEDURE 5. A TT ACHING THE ADDITIONAL NOIS E FIL TER UNIT (NFILU) TO THE BASEU The following flowchart shows the procedure for attach ing the Additional Noise Filte r Unit (NFILU) to the BASEU of the PBX.
CHAPTER 3 ND- 71548 (E) Page 68 Issue 2 INST ALLA TION PROCEDURE Figure 005-12 Inser tion of NFILU Figure 005-13 Att aching of NFILU NAP-200-005 Sheet 15/18 Mounting of Units and Modules NOISE FIL TER.
ND-71548 (E) CHAPTER 3 Page 69 Issue 2 INST ALLA TION PROCEDURE Figure 005-14 Cablin g Diagram of NFILU NAP-200-005 Sheet 16/18 Mounting of Units and Modules (-48VB) (GB0) (G) (-48V) (PZ-M371) Additio.
CHAPTER 3 ND- 71548 (E) Page 70 Issue 2 INST ALLA TION PROCEDURE This NAP explains the procedures for installing the power equipment. Note: The Cir cuit Br eaker (NFB) for the Rec tifier's DC output must r emain OFF .
ND-71548 (E) CHAPTER 3 Page 71 Issue 2 INST ALLA TION PROCEDURE This NAP explains the procedures for installing the MDF . NAP-200-007 Sheet 1/1 Installation of the MDF ST AR T Install the MDF at the predetermined locat ion on th e floor or wall. Be sure to check the quantity of accessory items such as arrest ers, block terminals, etc.
CHAPTER 3 ND- 71548 (E) Page 72 Issue 2 INST ALLA TION PROCEDURE This NAP explains the following work items. • Connection of Power and Ground Cables • Connection of DC-DC Converter for T elephon e sets equipped with Message W aiting Lamps • End Jointing of Power and Ground Cables • Branching of Power Cables 1.
ND-71548 (E) CHAPTER 3 Page 73 Issue 2 INST ALLA TION PROCEDURE Figure 008-1 Det ail of Cable Running (Single IM G Configuration) NAP-200-008 Sheet 2/13 Connection of Power and Ground Cables from the .
CHAPTER 3 ND- 71548 (E) Page 74 Issue 2 INST ALLA TION PROCEDURE Figure 008-2 Detail of Cable Running (Multip le IMG Configuration) NAP-200-008 Sheet 3/13 Connection of Power and Ground Cables from th.
ND-71548 (E) CHAPTER 3 Page 75 Issue 2 INST ALLA TION PROCEDURE Figure 008-3 Connection of Power and Gr ound Cables to Power Receiving T erminal NAP-200-008 Sheet 4/13 Connection of Power and Ground C.
CHAPTER 3 ND- 71548 (E) Page 76 Issue 2 INST ALLA TION PROCEDURE 2. CONNECTION OF DC-DC CONVERTER FOR TELEPH ONE SETS EQUIPPED WITH MESSAGE W AITING LAMPS NAP-200-008 Sheet 5/13 Connection of Power and Ground Cables from the Power Equipment ST AR T Cable Running Referring to Figur e 008-4, run the power and ground cables.
ND-71548 (E) CHAPTER 3 Page 77 Issue 2 INST ALLA TION PROCEDURE Figure 008-4 Example Connec tion Diagram-DC-DC Converter for Message W aiting Lamp s NAP-200-008 Sheet 6/13 Connection of Power and Grou.
CHAPTER 3 ND- 71548 (E) Page 78 Issue 2 INST ALLA TION PROCEDURE Figure 008-5 Removal of Shorting Piece an d Cable Connection NAP-200-008 Sheet 7/13 Connection of Power and Ground Cables from the Powe.
ND-71548 (E) CHAPTER 3 Page 79 Issue 2 INST ALLA TION PROCEDURE 3. END JOINTING OF POWER AN D GROUND CABLES NAP-200-008 Sheet 8/13 Connection of Power and Ground Cables from the Power Equipment ST AR T Stripping of Insulation Sh eath Strip the wire to exceed the length of the terminal body by 1 - 2 mm (1/8 inch).
CHAPTER 3 ND- 71548 (E) Page 80 Issue 2 INST ALLA TION PROCEDURE Figure 008-6 Placing the Clamp T erminal on the Die Figure 008-7 Clamping Method NAP-200-008 Sheet 9/13 Connection of Power and Ground .
ND-71548 (E) CHAPTER 3 Page 81 Issue 2 INST ALLA TION PROCEDURE 4. BRANCHING OF POWER CABLES NAP-200-008 Sheet 10/13 Connection of Power and Ground Cables from the Power Equipment ST AR T Stripping Main and Branch Cable Referring to Figure 008-8, st rip insulation coating with an electrician’s knife.
CHAPTER 3 ND- 71548 (E) Page 82 Issue 2 INST ALLA TION PROCEDURE Figure 008-8 S tripped Length of Main and Branch Ca ble NAP-200-008 Sheet 1 1/ 13 Connection of Power and Ground Cables from the Power .
ND-71548 (E) CHAPTER 3 Page 83 Issue 2 INST ALLA TION PROCEDURE Figure 008-9 Inserting of Cables into T erminal Figure 008-10 Clamping for Branch Joint i ng NAP-200-008 Sheet 12/13 Connection of Power.
CHAPTER 3 ND- 71548 (E) Page 84 Issue 2 INST ALLA TION PROCEDURE Figure 008-1 1 T aping Figure 008-12 Co vering NAP-200-008 Sheet 13/13 Connection of Power and Ground Cables from the Power Equipment Note: T aping s hould be done in two rounds with the tape overlapping half the tape width.
ND-71548 (E) CHAPTER 3 Page 85 Issue 2 INST ALLA TION PROCEDURE This NAP explains the following work items: • Extraction of Moun ted Circuit Cards • Mounting of Circuit Cards • Setting of Switch Positions on Circuit Cards • Installation of CPR 1.
CHAPTER 3 ND- 71548 (E) Page 86 Issue 2 INST ALLA TION PROCEDURE 2. EXTRACTION OF MO UNTED CIRCUIT CARDS NAP-200-009 Sheet 2/13 Setting of Switch Positions and Mounting of Circuit Card s ST AR T Removing the Card Stoppe r Referring to F igure 009-1, remove the card stopp er from the module.
ND-71548 (E) CHAPTER 3 Page 87 Issue 2 INST ALLA TION PROCEDURE Figure 009-1 Removal of Card S topper NAP-200-009 Sheet 3/13 Setting of Switch Positions and Mounting of Circuit Card s A TTENTION Contents S tatic Sensitive Handling Precautions Requir e d CARD STOPPER P AN HEAD SCR EW (M3, 8mm (.
CHAPTER 3 ND- 71548 (E) Page 88 Issue 2 INST ALLA TION PROCEDURE 3. MOUNTING OF CIRCUIT CARD S NAP-200-009 Sheet 4/13 Setting of Switch Positions and Mounting of Circuit Card s ST AR T Unpacking the Circuit Cards Unpack each circuit card and remove it from its polyethylene bag.
ND-71548 (E) CHAPTER 3 Page 89 Issue 2 INST ALLA TION PROCEDURE 4. SETTING OF SWITCH POSITIONS ON CIRCUIT CARDS NAP-200-009 Sheet 5/13 Setting of Switch Positions and Mounting of Circuit Card s ST AR T Extracting the Circuit Cards from the Module Extract one circuit card requiring switch setting from the module.
CHAPTER 3 ND- 71548 (E) Page 90 Issue 2 INST ALLA TION PROCEDURE NAP-200-009 Sheet 6/13 Setting of Switch Positions and Mounting of Circuit Card s A TTENTION Contents S tatic Sensitive Handling Precau.
ND-71548 (E) CHAPTER 3 Page 91 Issue 2 INST ALLA TION PROCEDURE 5. INST ALLA TION OF CPR This section explains how to insta ll the CPR into the LPM (M GC). Perform the following procedure for each CPR. STEP 1: Remove the eight screws from the top cover a nd the two screws from the front panel, then lift away the top cover.
CHAPTER 3 ND- 71548 (E) Page 92 Issue 2 INST ALLA TION PROCEDURE STEP 4: Insert the ISAGT (PZ-GT25/26) card into slot 6 as shown below. Figure 009-6 Insertion of the ISAG T card (in slot 6) STEP 5: Connect the following cables to the connectors on the inserted ISAGT car d.
ND-71548 (E) CHAPTER 3 Page 93 Issue 2 INST ALLA TION PROCEDURE STEP 6: Insert the optional LANI card (s) when FCCS is used via LAN. Note: FCCS stands for Fusion Call Contr ol Signaling. Figure 009-8 Insertion of the LANI car d (in slot 0/3) STEP 7: Remove the blind covers of the slots in which ISAGT/LANI card to b e used.
CHAPTER 3 ND- 71548 (E) Page 94 Issue 2 INST ALLA TION PROCEDURE STEP 8: Attach the Front Pa nel again by fast ening the removed two screws at the lower side of the front panel. STEP 9: Connect SW PWR CA-A cable again. STEP 10: Connect 50AL FLT CA-A to KEYA and KEYB conn ectors on PZ-DK237.
ND-71548 (E) CHAPTER 3 Page 95 Issue 2 INST ALLA TION PROCEDURE STEP 12: Turn ON the MBR key on the DSP of the CPR. Figure 009-12 T urning ON the MBR key STEP 13: Insert the CPR into the LPM so that three connectors may be fi rmly plugged into the connectors on the backplan e.
CHAPTER 3 ND- 71548 (E) Page 96 Issue 2 INST ALLA TION PROCEDURE Note 1: PZ-GT25 is for Single IMG , PZ-GT26 is for Multiple IMG . Note 2: FCCS stands for Fusion Call Contr o l Signaling.
ND-71548 (E) CHAPTER 3 Page 97 Issue 2 INST ALLA TION PROCEDURE Figure 009-15 Cable Connection Diagram fo r CPR NAP-200-009 Sheet 13/13 Setting of Switch Positions and Mounting of Circuit Card s AT T .
CHAPTER 3 ND- 71548 (E) Page 98 Issue 2 INST ALLA TION PROCEDURE This NAP explains how to run the fol l owing internal cables between Modules. NAP-200-010 Sheet 1/64 Internal Cable Connections ST AR T.
ND-71548 (E) CHAPTER 3 Page 99 Issue 2 INST ALLA TION PROCEDURE Since cable connections vary depending on the system configuration, which in cludes how many Port Interface Mod- ules (PIMs) are accommodated in the system or whe ther redundancy is take n into account as to the CPU.
CHAPTER 3 ND- 71548 (E) Page 100 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 3/64 Internal Cable Connection s T able 010-1 Quick Reference T able (Continued) SYSTEM TYPE KIND OF CABL E FRAME NA.
ND-71548 (E) CHAPTER 3 Page 101 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 4/64 Internal Cable Connections T able 010-1 Quick Reference T able (Continued) SYSTEM TYPE KIND OF CABL E FRAME NAME.
CHAPTER 3 ND- 71548 (E) Page 102 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 5/64 Internal Cable Connections T able 010-1 Quick Ref erence T ab le ( C o n t i n u e d ) SYSTEM TYPE KIND OF CABL.
ND-71548 (E) CHAPTER 3 Page 103 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 6/64 Internal Cable Connections T able 010-1 Quick Ref erence T ab le ( C o n t i n u e d ) SYSTEM TYPE KIND OF CABL .
CHAPTER 3 ND- 71548 (E) Page 104 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 7/64 Internal Cable Connections T able 010-1 Quick Reference T able (Continued) SYSTEM TYPE KIND OF CABL E FRAME NAM.
ND-71548 (E) CHAPTER 3 Page 105 Issue 2 INST ALLA TION PROCEDURE Figure 010-1 Locations of Connectors on the PIM Backplane NAP-200-010 Sheet 8/64 Internal Cable Connections 26 LT 7 AT I 0 1 2 3 1 2 3 .
CHAPTER 3 ND- 71548 (E) Page 106 Issue 2 INST ALLA TION PROCEDURE Figure 010-2 Locatio ns of Connectors on the LPM (MGC) Backplane ( BZ-C24) NAP-200-010 Sheet 9/64 Internal Cable Connections [Front] F.
ND-71548 (E) CHAPTER 3 Page 107 Issue 2 INST ALLA TION PROCEDURE Figure 010-3 Location of Conn ectors on the TSWM Backplane (Multip le IMG Configuration) NAP-200-010 Sheet 10/64 Internal Cable Connect.
CHAPTER 3 ND- 71548 (E) Page 108 Issue 2 INST ALLA TION PROCEDURE Figure 010-4 Locations of Connect ors on the Power Distribution T erminal Board (PZ-M371) NAP-200-010 Sheet 1 1/ 64 Internal Cable Con.
ND-71548 (E) CHAPTER 3 Page 109 Issue 2 INST ALLA TION PROCEDURE Run the power cables, referring to Figure 010-6. Then, fasten the cables to the cabinet, referring to the figure below .
CHAPTER 3 ND- 71548 (E) Page 110 Issue 2 INST ALLA TION PROCEDURE Figure 010-6 Det ails on Power Cable Connections (for 1-PIM System) NAP-200-010 Sheet 13/64 Internal Cable Connection s Single IMG Con.
ND-71548 (E) CHAPTER 3 Page 111 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 14/64 Internal Cable Connections Single IMG Configuration T able 010-2 Det ails on Power Cable Connections (for 1-PIM System) No.
CHAPTER 3 ND- 71548 (E) Page 112 Issue 2 INST ALLA TION PROCEDURE Run the power cables, referring to Figure 010-8. Then, fasten the cables to the cabinet, referring to the figure below .
ND-71548 (E) CHAPTER 3 Page 113 Issue 2 INST ALLA TION PROCEDURE Figure 010-8 Det ails on Power Cable Connections (for 2-PIM System) NAP-200-010 Sheet 16/64 Internal Cable Connections Single IMG Confi.
CHAPTER 3 ND- 71548 (E) Page 114 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 17/64 Internal Cable Connections Single IMG Configuration T able 010-3 Det ails on Power Cable Connections (for 2-PIM System) No.
ND-71548 (E) CHAPTER 3 Page 115 Issue 2 INST ALLA TION PROCEDURE Run the power cables, referring to Figure 010-10. Then, fasten the cables to the cabinet, referring to the figure below .
CHAPTER 3 ND- 71548 (E) Page 116 Issue 2 INST ALLA TION PROCEDURE Figure 010-10 Det ails on Power Cable Connections (for 3- PIM System) NAP-200-010 Sheet 19/64 Internal Cable Connection s Single IMG C.
ND-71548 (E) CHAPTER 3 Page 117 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 20/64 Internal Cable Connections Single IMG Configuration T able 010-4 Det ails on Power Cable Connections (for 3-PIM System) No.
CHAPTER 3 ND- 71548 (E) Page 118 Issue 2 INST ALLA TION PROCEDURE Run the power cables, referring to Figure 010-12. Then, fasten the cables to the cabinet, referring to the figure below .
ND-71548 (E) CHAPTER 3 Page 119 Issue 2 INST ALLA TION PROCEDURE Figure 010-12 Det ails on Power Cable Connections (for 4- PIM System) NAP-200-010 Sheet 22/64 Internal Cable Connections Single IMG Con.
CHAPTER 3 ND- 71548 (E) Page 120 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 23/64 Internal Cable Connections Single IMG Configuration T able 010-5 Det ails on Power Cable Connections (for 4-PIM System) No.
ND-71548 (E) CHAPTER 3 Page 121 Issue 2 INST ALLA TION PROCEDURE Run the internal power cables, referring to Figure 010-13 throug h Figure 010-21. Figure 010-13 Power Cable Connections for IMG0 (M ult.
CHAPTER 3 ND- 71548 (E) Page 122 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 25/64 Internal Cable Connections Multiple IMG Configuration T able 010-6 Power Cable Connec tions for IMG0 (Multiple IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 123 Issue 2 INST ALLA TION PROCEDURE Figure 010-1 4 Power Cable Connections for IMG1 (1-PIM Syste m) (Multiple IMG Con figuration) NAP-200-010 Sheet 26/64 Internal Cable Co.
CHAPTER 3 ND- 71548 (E) Page 124 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 27/64 Internal Cable Connections Multiple IMG Configuration T able 010-7 Power Cable Co nnections for IMG1 (1-PIM Syst em) (Multiple IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 125 Issue 2 INST ALLA TION PROCEDURE Figure 010-1 5 Power Cable Connections for IMG1 (2-PIM Syste m) (Multiple IMG Con figuration) NAP-200-010 Sheet 28/64 Internal Cable Co.
CHAPTER 3 ND- 71548 (E) Page 126 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 29/64 Internal Cable Connections Multiple IMG Configuration T able 010-8 Power Cable Co nnections for IMG1 (2-PIM Syst em) (Multiple IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 127 Issue 2 INST ALLA TION PROCEDURE Figure 010-1 6 Power Cable Connections for IMG1 (3-PIM Syste m) (Multiple IMG Con figuration) NAP-200-010 Sheet 30/64 Internal Cable Co.
CHAPTER 3 ND- 71548 (E) Page 128 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 31/64 Internal Cable Connections Multiple IMG Configuration T able 010-9 Power Cable Connec tions for IMG1 (3-PIM System) (Multiple IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 129 Issue 2 INST ALLA TION PROCEDURE Figure 010-1 7 Power Cable Connections for IMG1 (4-PIM Syste m) (Multiple IMG Con figuration) NAP-200-010 Sheet 32/64 Internal Cable Co.
CHAPTER 3 ND- 71548 (E) Page 130 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 33/64 Internal Cable Connections Multiple IMG Configuration T able 010-10 Power Cable Connect ions for IMG1 (4-PIM Sys tem) (Multipl e IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 131 Issue 2 INST ALLA TION PROCEDURE Figure 010-18 Power Cable Conne ctions for IMG2 /3 (1-PIM System) (Multiple IMG Configuration) NAP-200-010 Sheet 34/64 Internal Cable C.
CHAPTER 3 ND- 71548 (E) Page 132 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 35/64 Internal Cable Connections Multiple IMG Configuration T able 010-1 1 Power Cable Connection s for IMG2/3 (1-PIM System) (Multi ple IMG Configurat ion) No.
ND-71548 (E) CHAPTER 3 Page 133 Issue 2 INST ALLA TION PROCEDURE Figure 010-19 Power Cable Conne ctions for IMG2 /3 (2-PIM System) (Multiple IMG Configuration) NAP-200-010 Sheet 36/64 Internal Cable C.
CHAPTER 3 ND- 71548 (E) Page 134 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 37/64 Internal Cable Connections Multiple IMG Configuration T able 010-12 Power Cable Connections for IMG2 /3 (2-PIM System) ( Multiple IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 135 Issue 2 INST ALLA TION PROCEDURE Figure 010-20 Power Cable Conne ctions for IMG2 /3 (3-PIM System) (Multiple IMG Configuration) NAP-200-010 Sheet 38/64 Internal Cable C.
CHAPTER 3 ND- 71548 (E) Page 136 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 39/64 Internal Cable Connections Multiple IMG Configuration T able 010-13 Power Cable Connections for IMG2 /3 (3-PIM System) ( Multiple IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 137 Issue 2 INST ALLA TION PROCEDURE Figure 010-21 Power Cable Conne ctions for IMG2 /3 (4-PIM System) (Multiple IMG Configuration) NAP-200-010 Sheet 40/64 Internal Cable C.
CHAPTER 3 ND- 71548 (E) Page 138 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 41/64 Internal Cable Connections Multiple IMG Configuration T able 010-14 Power Cable Connections for IMG2 /3 (4-PIM System) ( Multiple IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 139 Issue 2 INST ALLA TION PROCEDURE Run the bus cables, referring to Figure 0 1 0-23. Then, fasten th e bus cables to the cabinet, referring to the figure be- low .
CHAPTER 3 ND- 71548 (E) Page 140 Issue 2 INST ALLA TION PROCEDURE Figure 010-23 Det ails on Bus Cable Connections (for 1-PIM System) Note: Cable in bracket is for a dual-system. NAP-200-010 Sheet 43/64 Internal Cable Connections Single IMG Configuration T able 010-15 Bus Cable Connections (for 1-PIM System) No.
ND-71548 (E) CHAPTER 3 Page 141 Issue 2 INST ALLA TION PROCEDURE Run the bus cables, referring to Figure 0 1 0-25. Then, fasten th e bus cables to the cabinet, referring to the figure be- low .
CHAPTER 3 ND- 71548 (E) Page 142 Issue 2 INST ALLA TION PROCEDURE Figure 010-25 Det ails on Bus Cable Connections (for 2-PIM System) NAP-200-010 Sheet 45/64 Internal Cable Connections Single IMG Confi.
ND-71548 (E) CHAPTER 3 Page 143 Issue 2 INST ALLA TION PROCEDURE Note: Cable in bracket is for a dual-system. NAP-200-010 Sheet 46/64 Internal Cable Connections Single IMG Configuration T able 010-16 Bus Cable Connections (for 2-PIM System) No.
CHAPTER 3 ND- 71548 (E) Page 144 Issue 2 INST ALLA TION PROCEDURE Run the bus cables, referring to Figure 0 1 0-27. Then, fasten th e bus cables to the cabinet, referring to the figure be- low .
ND-71548 (E) CHAPTER 3 Page 145 Issue 2 INST ALLA TION PROCEDURE Figure 010-27 Det ails on Bus Cable Connections (for 3-PIM System) NAP-200-010 Sheet 48/64 Internal Cable Connections Single IMG Config.
CHAPTER 3 ND- 71548 (E) Page 146 Issue 2 INST ALLA TION PROCEDURE Note: Cable in bracket is for a dual-system. NAP-200-010 Sheet 49/64 Internal Cable Connections Single IMG Configuratio n T able 010-17 Bus Cable Connections (for 3-PIM System) No.
ND-71548 (E) CHAPTER 3 Page 147 Issue 2 INST ALLA TION PROCEDURE Run the power cables, referring to Figure 010-29. Then, fasten the cables to the cabinet, referring to the figure below .
CHAPTER 3 ND- 71548 (E) Page 148 Issue 2 INST ALLA TION PROCEDURE Figure 010-29 Det ails on Bus Cable Connections (for 4-PIM System) NAP-200-010 Sheet 51/64 Internal Cable Connections Single IMG Confi.
ND-71548 (E) CHAPTER 3 Page 149 Issue 2 INST ALLA TION PROCEDURE Note: Cable in bracket is for a dual-system. NAP-200-010 Sheet 52/64 Internal Cable Connections Single IMG Configuratio n T able 010-18 Bus Cable Connections (for 4-PIM System) No.
CHAPTER 3 ND- 71548 (E) Page 150 Issue 2 INST ALLA TION PROCEDURE Figure 010-30 Internal Bus Cable Connecti ons for IMG0 (Multiple IMG Confi guration) NAP-200-010 Sheet 53/64 Internal Cable Connection.
ND-71548 (E) CHAPTER 3 Page 151 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 54/64 Internal Cable Connections Multiple IMG Configuration T able 010-19 Internal Bus Ca ble Connections for IMG0 (Multiple IMG Configuration ) No.
CHAPTER 3 ND- 71548 (E) Page 152 Issue 2 INST ALLA TION PROCEDURE Figure 010-31 Inte rnal Bus Cable Connections for IMG1 (1-PIM System) (Mult iple IMG Configuration) NAP-200-010 Sheet 55/64 Internal Cable Connections Multiple IMG Configuration T able 010-20 Internal Bus Cable Connections for IMG1 (1-PIM System) (Multiple IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 153 Issue 2 INST ALLA TION PROCEDURE Figure 010-32 Inte rnal Bus Cable Connections for IMG1 (2-PIM System) (Mult iple IMG Configuration) NAP-200-010 Sheet 56/64 Internal Ca.
CHAPTER 3 ND- 71548 (E) Page 154 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 57/64 Internal Cable Connections Multiple IMG Configuration T able 010-21 Internal Bus Cable Connections for IMG1 (2-PIM System) (Multiple IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 155 Issue 2 INST ALLA TION PROCEDURE Figure 010-33 Inte rnal Bus Cable Connections for IMG1 (3-PIM System) (Mult iple IMG Configuration) NAP-200-010 Sheet 58/64 Internal Ca.
CHAPTER 3 ND- 71548 (E) Page 156 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 59/64 Internal Cable Connections Multiple IMG Configuration T able 010-22 Internal Bus Cable Connections fo r IMG1 (3-PIM System) (Multiple IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 157 Issue 2 INST ALLA TION PROCEDURE Figure 010-34 Inte rnal Bus Cable Connections for IMG1 (4-PIM System) (Mult iple IMG Configuration) NAP-200-010 Sheet 60/64 Internal Ca.
CHAPTER 3 ND- 71548 (E) Page 158 Issue 2 INST ALLA TION PROCEDURE NAP-200-010 Sheet 61/64 Internal Cable Connections Multiple IMG Configuration T able 010-23 Internal Bus Cable Connections fo r IMG1 (4-PIM System) (Multiple IMG Configuration) No.
ND-71548 (E) CHAPTER 3 Page 159 Issue 2 INST ALLA TION PROCEDURE Figuers 010-35 through 0 1 0-37 show the con figuration of the internal bus cables for IMG2/3. Because bus cables for the 1-PIM system all adopt inter -fra me connections with othe r cabinets (IMG0 and 1), explanations are given here about the 2-PIM configuratio n or more.
CHAPTER 3 ND- 71548 (E) Page 160 Issue 2 INST ALLA TION PROCEDURE Figure 010-36 Internal Bus Cable Connections f or IMG2/3 (3-PIM Sys tem) (Multiple IMG Confi guration) NAP-200-010 Sheet 63/64 Interna.
ND-71548 (E) CHAPTER 3 Page 161 Issue 2 INST ALLA TION PROCEDURE Figure 010-37 Internal Bus Cable Connections f or IMG2/3 (4-PIM Sys tem) (Multiple IMG Confi guration) NAP-200-010 Sheet 64/64 Internal.
CHAPTER 3 ND- 71548 (E) Page 162 Issue 2 INST ALLA TION PROCEDURE This NAP explains how to run the frame-to-frame cabl es for 2/3/4-IMG System. NAP-200-01 1 Sheet 1/24 Inter-Frame Cable C onnections Multiple IMG Config uration ST AR T Connection of Inter-frame ISA Bus Cables Refer to Figure 01 1-1.
ND-71548 (E) CHAPTER 3 Page 163 Issue 2 INST ALLA TION PROCEDURE Figure 01 1- 1 Inter-Frame ISA Bus Cab le Connect i ons for IMG0-IMG 1 (Multiple IMG Configuration) NAP-200-01 1 Sheet 2/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 01 1-1 Inter-Frame ISA Bus Cable Connecti ons for IMG0-IMG1 (Multiple IMG Configuration) No.
CHAPTER 3 ND- 71548 (E) Page 164 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-2 Inter-Frame Bus Cable Connections for IMG0-IMG1 (Mult iple IMG Confi guration) NAP-200-01 1 Sheet 3/24 Inter-Frame Cable.
ND-71548 (E) CHAPTER 3 Page 165 Issue 2 INST ALLA TION PROCEDURE NAP-200-01 1 Sheet 4/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 01 1-2 Inter-Frame Bu s Cable Connections for IMG0-IMG1 No.
CHAPTER 3 ND- 71548 (E) Page 166 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-3 Inter-Frame Bus Cable Connections for IMG1-IMG2 (1-PIM Sys tem) NAP-200-01 1 Sheet 5/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 01 1-3 Inter-Frame Bus Cable Conne ctions for IMG1-IMG2 (1-PIM System) No.
ND-71548 (E) CHAPTER 3 Page 167 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-4 Inter-Frame Bus Cable Connections for IMG1-IMG2 (2-PIM Sys tem) NAP-200-01 1 Sheet 6/24 Inter-Frame Cable C onnections Mu.
CHAPTER 3 ND- 71548 (E) Page 168 Issue 2 INST ALLA TION PROCEDURE NAP-200-01 1 Sheet 7/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 01 1-4 Inter-Frame Bus Cable Conne ctions for IMG1-IMG2 (2-PIM System) No.
ND-71548 (E) CHAPTER 3 Page 169 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-5 Inter-Frame Bus Cable Connections for IMG1-IMG2 (3-PIM Sys tem) NAP-200-01 1 Sheet 8/24 Inter-Frame Cable C onnections Mu.
CHAPTER 3 ND- 71548 (E) Page 170 Issue 2 INST ALLA TION PROCEDURE NAP-200-01 1 Sheet 9/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 01 1-5 Inter-Frame Bus Cable Conne ctions for IMG1-IMG2 (3-PIM System) No.
ND-71548 (E) CHAPTER 3 Page 171 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-6 Inter-Frame Bus Cable Connections for IMG1-IMG2 (4-PIM Sys tem) NAP-200-01 1 Sheet 10/24 Inter-Frame Cable C onnections M.
CHAPTER 3 ND- 71548 (E) Page 172 Issue 2 INST ALLA TION PROCEDURE NAP-200-01 1 Sheet 1 1/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 01 1-6 Inter-Frame Bus Cable Conne ctions for IMG1-IMG2 (4-PIM System) No.
ND-71548 (E) CHAPTER 3 Page 173 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-7 Inter-Frame Bus Cable Connections for IMG1-IMG3 (1-PIM Sys tem) NAP-200-01 1 Sheet 12/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 01 1-7 Inter-Frame ISA Bus Ca ble Connections for IMG1-IMG3 (1-PIM System) No.
CHAPTER 3 ND- 71548 (E) Page 174 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-8 Inter-Frame Bus Cable Connections for IMG1-IMG3 (2-PIM Sys tem) NAP-200-01 1 Sheet 13/24 Inter-Frame Cable C onnections .
ND-71548 (E) CHAPTER 3 Page 175 Issue 2 INST ALLA TION PROCEDURE NAP-200-01 1 Sheet 14/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 01 1-8 Inter-Frame Bus Cable Conne ctions for IMG1-IMG3 (2-PIM System) No.
CHAPTER 3 ND- 71548 (E) Page 176 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-9 Inter-Frame Bus Cable Connections for IMG1-IMG3 (3-PIM Sys tem) NAP-200-01 1 Sheet 15/24 Inter-Frame Cable C onnections .
ND-71548 (E) CHAPTER 3 Page 177 Issue 2 INST ALLA TION PROCEDURE NAP-200-01 1 Sheet 16/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 01 1-9 Inter-Frame Bus Cable Conne ctions for IMG1-IMG3 (3-PIM System) No.
CHAPTER 3 ND- 71548 (E) Page 178 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-10 Inter-Frame Bus Cable Connections for IMG1 -IMG3 (4-PIM System) NAP-200-01 1 Sheet 17/24 Inter-Frame Cable C onnections.
ND-71548 (E) CHAPTER 3 Page 179 Issue 2 INST ALLA TION PROCEDURE NAP-200-01 1 Sheet 18/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 01 1-10 Inte r-Frame Bu s Cable C onnection s for IMG1- IMG3 (4-PIM System) No.
CHAPTER 3 ND- 71548 (E) Page 180 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-1 1 Inter-Frame Alarm Bus Cable Co nnections for IMG0-IMG1 NAP-200-01 1 Sheet 19/24 Inter-Frame Cable C onnections Mu ltip.
ND-71548 (E) CHAPTER 3 Page 181 Issue 2 INST ALLA TION PROCEDURE NAP-200-01 1 Sheet 20/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 01 1-1 1 Inter-Frame Alarm Bus Cable Connections for IMG0-IMG1 No.
CHAPTER 3 ND- 71548 (E) Page 182 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-12 Inter-Frame Alarm Bus Cable Connections for IMG0-I MG2 NAP-200-01 1 Sheet 21/24 Inter-Frame Cable C onnections Mu ltipl.
ND-71548 (E) CHAPTER 3 Page 183 Issue 2 INST ALLA TION PROCEDURE NAP-200-01 1 Sheet 22/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 011-12 Inter-Frame A larm Bus Ca ble Connec tions for I MG0-IMG2 No.
CHAPTER 3 ND- 71548 (E) Page 184 Issue 2 INST ALLA TION PROCEDURE Figure 01 1-13 Inter-Frame Alarm Bus Cable Connections for IMG0-I MG3 NAP-200-01 1 Sheet 23/24 Inter-Frame Cable C onnections Mu ltipl.
ND-71548 (E) CHAPTER 3 Page 185 Issue 2 INST ALLA TION PROCEDURE NAP-200-01 1 Sheet 24/24 Inter-Frame Cable C onnections Mu ltiple IMG Configuration T able 011-13 Inter-Frame A larm Bus Ca ble Connec tions for I MG0-IMG3 No.
CHAPTER 3 ND- 71548 (E) Page 186 Issue 2 INST ALLA TION PROCEDURE This NAP describes front cable connections be tween circuit cards. Note: Pr otection against static electricity: A Portable Field Service Gr ounding Kit must be used to pr otect system components fr om static dischar ge.
ND-71548 (E) CHAPTER 3 Page 187 Issue 2 INST ALLA TION PROCEDURE This NAP explains the following work items: • Cable Running from the PB X to the MDF and A TTCON (Desk Console) • Cable Running fro.
CHAPTER 3 ND- 71548 (E) Page 188 Issue 2 INST ALLA TION PROCEDURE 1. CABLE RUNNING FROM THE PBX TO THE MD F AND A TTC ON NAP-200-013 Sheet 2/13 Cable Running from the PBX to MDF , A TTCON, MA T , and .
ND-71548 (E) CHAPTER 3 Page 189 Issue 2 INST ALLA TION PROCEDURE NAP-200-013 Sheet 3/13 Cable Running from the PBX to MDF , A TTCON, MA T , and SMDR Cables for ODT Connectors Referring to description of 8TLT card in the Circuit Card Manual, connect each 2400 ODT CABLE/2400 ODT CABLE-A and the corresponding installation cables.
CHAPTER 3 ND- 71548 (E) Page 190 Issue 2 INST ALLA TION PROCEDURE Figure 013-1 L T Cable Routing NAP-200-013 Sheet 4/13 Cable Running from the PBX to MDF , A TTCON, MA T , and SMDR (PIM3) (TOPU) (PIM2.
ND-71548 (E) CHAPTER 3 Page 191 Issue 2 INST ALLA TION PROCEDURE Figure 013-2 Cable Routing of Circuit Card Front Ca ble NAP-200-013 Sheet 5/13 Cable Running from the PBX to MDF , A TTCON, MA T , and .
CHAPTER 3 ND- 71548 (E) Page 192 Issue 2 INST ALLA TION PROCEDURE 2. CABLE RUNNING FROM THE PBX TO THE MA T AND SMDR NAP-200-013 Sheet 6/13 Cable Running from the PBX to MDF , A TTCON, MA T , and SMDR ST AR T MAT (Refer to NAP-200 -017) Referring to NAP-20 0-017, connect IPX 2PORT CA- A and the installation cable (25P).
ND-71548 (E) CHAPTER 3 Page 193 Issue 2 INST ALLA TION PROCEDURE 3. CONNECTIONS A T THE PBX SIDE 4. CABLE TYING A T THE PBX NAP-200-013 Sheet 7/13 Cable Running from the PBX to MDF , A TTCON, MA T , and SMDR ST AR T LT Connectors Confirm each connector name on the backpla ne and the corresponding LT connector, then connect the two.
CHAPTER 3 ND- 71548 (E) Page 194 Issue 2 INST ALLA TION PROCEDURE Figure 013-3 Example of Cable T ying Using Tie-W rap NAP-200-013 Sheet 8/13 Cable Running from the PBX to MDF , A TTCON, MA T , and SM.
ND-71548 (E) CHAPTER 3 Page 195 Issue 2 INST ALLA TION PROCEDURE 5. TERMINA TION OF THE CABLE S BETWEEN THE PBX AND THE MDF OR A TTCON ONTO THE CABLE SUPPORT ASSEMBL Y NAP-200-013 Sheet 9/13 Cable Running from the PBX to MDF , A TTCON, MA T , and SMDR ST AR T Removing the Cable Supp ort Assembly .
CHAPTER 3 ND- 71548 (E) Page 196 Issue 2 INST ALLA TION PROCEDURE Figure 013-4 Cable Support Assembly NAP-200-013 Sheet 10/13 Cable Running from the PBX to MDF , A TTCON, MA T , and SMDR AB C D (LPM (.
ND-71548 (E) CHAPTER 3 Page 197 Issue 2 INST ALLA TION PROCEDURE NAP-200-013 Sheet 1 1/13 Cable Running from the PBX to MDF , A TTCON, MA T , and SMDR T able 013-1 Cable Support Assembly BACKPLANE CABLE SUPPORT No. USE REMARKS MODULE CONNECT OR NAME LPM (MGC) CONN0, CONN1 Not Used For I/O Equipment (MA T , Printer, etc.
CHAPTER 3 ND- 71548 (E) Page 198 Issue 2 INST ALLA TION PROCEDURE Figure 013-5 Clamp Wi nding NAP-200-013 Sheet 12/13 Cable Running from the PBX to MDF , A TTCON, MA T , and SMDR Shield cable Approx. 18 mm (0.72 inch) CLAMP (M-398902) There are 2 kinds of clamp (M-398902 and E0809A), this fig ure shows an example where M-39890 2 clamp is used.
ND-71548 (E) CHAPTER 3 Page 199 Issue 2 INST ALLA TION PROCEDURE Figure 013-6 T ermination of Inst allation Cables NAP-200-013 Sheet 13/13 Cable Running from the PBX to MDF , A TTCON, MA T , and SMDR .
CHAPTER 3 ND- 71548 (E) Page 200 Issue 2 INST ALLA TION PROCEDURE This NAP explains the procedures fo r terminating cables at the MDF . CAUTION: When terminating Cables to the MDF, the line/trunk circuit card should extend about 50 mm (2 inches) from the module an d must not contact the backpla ne connector.
ND-71548 (E) CHAPTER 3 Page 201 Issue 2 INST ALLA TION PROCEDURE This NAP explains the following work items: NAP-200-015 Sheet 1/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C. O. Lines, and T ie Lines MDF C.O. Line/ Tie Line Cross Connection of Stations Cross Connection of Trunks (C.
CHAPTER 3 ND- 71548 (E) Page 202 Issue 2 INST ALLA TION PROCEDURE 1. CROSS CONNECTION OF ST A TIONS Note 1: Provid e the necessary cr oss connections at the MDF by using copper wir es of 0.5 mm diameter (24 A WG). 2-cor e twisted wir e is used for spe ech path, and single-cor e wire is used for contr ol wire.
ND-71548 (E) CHAPTER 3 Page 203 Issue 2 INST ALLA TION PROCEDURE 2. CROSS CONNECTION OF TRUNKS (C.O. LINES AND TIE LINES) Note 1: Provid e the necessary cr oss connections at the MDF by using copper wir es of 0.5 mm diameter (24 A WG). 2-cor e twisted wir e is used for spe ech path, and single-cor e wire is used for contr ol wire.
CHAPTER 3 ND- 71548 (E) Page 204 Issue 2 INST ALLA TION PROCEDURE Figure 015-2 Cross Connection of T runks (C.O. Lines and Tie Lines) NAP-200-015 Sheet 4/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C. O. Lines, and T ie Lines AX BX 16COT CARD C.
ND-71548 (E) CHAPTER 3 Page 205 Issue 2 INST ALLA TION PROCEDURE 3. CROSS CONNECTIONS FOR PFT Note 1: The COT must be accommodated in a universal slot of the same Unit (U) in whic h the cross-connected PFT is mounted. See the figur e be low . Note 2: Provid e the necessary cr oss connections at the MDF by using copper wir es of 0.
CHAPTER 3 ND- 71548 (E) Page 206 Issue 2 INST ALLA TION PROCEDURE NAP-200-015 Sheet 6/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C. O. Lines, and T ie Lines ST AR T Checking the terminal locations on the Module Group sid e of the MDF Referring to Section 1 .
ND-71548 (E) CHAPTER 3 Page 207 Issue 2 INST ALLA TION PROCEDURE Figure 015-4 Cross Connec t ion for PFT NAP-200-015 Sheet 7/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
CHAPTER 3 ND- 71548 (E) Page 208 Issue 2 INST ALLA TION PROCEDURE 4. CROSS CONNECTION OF ALARM INDICA TIN G P ANEL AND MUSIC ON HOLD Note: Pr ovide the necessary cr oss connections at the MDF by u sing copper wir es of 0.5 mm diameter (24 A WG). 2-cor e twisted wire is used for speec h path, and s ingle-cor e wir e is used for con tr ol wire.
ND-71548 (E) CHAPTER 3 Page 209 Issue 2 INST ALLA TION PROCEDURE Figure 015-5 IPX EXALM CA-A Cabling Diagram NAP-200-015 Sheet 9/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
CHAPTER 3 ND- 71548 (E) Page 210 Issue 2 INST ALLA TION PROCEDURE Figure 015-6 Conne ction of Alarm Indicating Pa nel and Music on Hold (Single IMG Configur ation) NAP-200-015 Sheet 10/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
ND-71548 (E) CHAPTER 3 Page 211 Issue 2 INST ALLA TION PROCEDURE Figure 015-7 Connection of Ala rm Indicating Panel (Multiple IMG Configuration) Figure 015-8 Connection of Mu sic on Hold (Multiple IMG Configura tion) NAP-200-015 Sheet 1 1/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
CHAPTER 3 ND- 71548 (E) Page 212 Issue 2 INST ALLA TION PROCEDURE <Cable Specification> Figure 015-9 IPX EXALM CA-A Cable NAP-200-015 Sheet 12/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
ND-71548 (E) CHAPTER 3 Page 213 Issue 2 INST ALLA TION PROCEDURE 5. CROSS CONNECTIONS FOR T AS INDICA TOR Note: Pr ovide the necessary cr oss connections at the MDF by u sing copper wir es of 0.5 mm diameter (24 A WG). 2-cor e twisted wir e is used for spe ech path, and single-cor e wire is used for contr ol wire.
CHAPTER 3 ND- 71548 (E) Page 214 Issue 2 INST ALLA TION PROCEDURE Figure 015-10 Cable Connectio n Diagram for T AS NAP-200-015 Sheet 14/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C. O. Lines, and T ie Lines AT T E N T I O N Contents S tatic Sensitive Handling Precautions Re quired PIN No.
ND-71548 (E) CHAPTER 3 Page 215 Issue 2 INST ALLA TION PROCEDURE • Cable Connection Diagram Provide the following connections at the MDF . Figure 015-10 Cable Connection Dia gram for T AS (Continued) NAP-200-015 Sheet 15/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
CHAPTER 3 ND- 71548 (E) Page 216 Issue 2 INST ALLA TION PROCEDURE 6. CROSS CONNECTIONS FO R EXTERNAL SWITCHES Note: Pr ovide the necessary cr oss connections at the MDF by u sing copper wir es of 0.5 mm diameter (24 A WG). 2-cor e twisted wir e is used for spe ech path, and single-cor e wire is used for contr ol wire.
ND-71548 (E) CHAPTER 3 Page 217 Issue 2 INST ALLA TION PROCEDURE Figure 015-12 Connec tion of External Switches NAP-200-015 Sheet 17/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
CHAPTER 3 ND- 71548 (E) Page 218 Issue 2 INST ALLA TION PROCEDURE 7. CONNECTION OF ANNOUNCEMENT MACHINE Note: Pr ovide the necessary cr oss connections at the MDF by u sing copper wir es of 0.5 mm diameter (24 A WG). 2-cor e twisted wir e is used for speech path, an d single-cor e wir e is used for contr ol wire.
ND-71548 (E) CHAPTER 3 Page 219 Issue 2 INST ALLA TION PROCEDURE Figure 015-13 Connection of Announcement Machine NAP-200-015 Sheet 19/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
CHAPTER 3 ND- 71548 (E) Page 220 Issue 2 INST ALLA TION PROCEDURE 8. CONNECTION OF P AGING EQUIPMENT Note: Pr ovide the necessary cr oss connections at the MDF by u sing copper wir es of 0.5 mm diameter (24 A WG). 2-cor e twisted wir e is used for speech path, an d single-cor e wir e is used for contr ol wire.
ND-71548 (E) CHAPTER 3 Page 221 Issue 2 INST ALLA TION PROCEDURE Figure 015-14 Connection o f Paging Equipment NAP-200-015 Sheet 21/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
CHAPTER 3 ND- 71548 (E) Page 222 Issue 2 INST ALLA TION PROCEDURE 9. CROSS CONNECTIONS 9.1 When Using D term Series E/D term 75 Note 1: A vailable distance between Module Gr oup and D term is a maximum of 850 mete rs (2459 feet). The instal- lation cable must be 24 AW G (0.
ND-71548 (E) CHAPTER 3 Page 223 Issue 2 INST ALLA TION PROCEDURE Figure 015-16 Cab le Connection for D term Series E/D term 75 NAP-200-015 Sheet 23/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
CHAPTER 3 ND- 71548 (E) Page 224 Issue 2 INST ALLA TION PROCEDURE 9.2 When using IP T erminals (IP Enabled D term and D term IP INASET) Figure 015-17 Rear Connector Loc ations of IP terminal NAP-200-015 Sheet 24/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
ND-71548 (E) CHAPTER 3 Page 225 Issue 2 INST ALLA TION PROCEDURE Figure 015-18 Connecting IP T e rminals to Network 9.3 When using D term SP20 D term SP20 is a software which is installed in PC and ha s the same function a s IP terminals. The following shows an example of connecting D term SP20 to LAN.
CHAPTER 3 ND- 71548 (E) Page 226 Issue 2 INST ALLA TION PROCEDURE 10. CROSS CONNECTIONS FOR DIGIT AL INTERF A CES Perform the cross connec tions for digital interfaces as shown below: Note 1: When your sy stem is single IMG configuration, T ime Division Switch (TSW) car d is equipped with Phase Lock Oscillator (PLO).
ND-71548 (E) CHAPTER 3 Page 227 Issue 2 INST ALLA TION PROCEDURE Figure 015-20 PLO Pin Assignment s for Receiving Clock (Single IMG Configuration) NAP-200-015 Sheet 27/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C. O.
CHAPTER 3 ND- 71548 (E) Page 228 Issue 2 INST ALLA TION PROCEDURE Figure 015-21 PLO Pin Assignment s for R eceiving Clock (Mult iple IMG Configurat ion) NAP-200-015 Sheet 28/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
ND-71548 (E) CHAPTER 3 Page 229 Issue 2 INST ALLA TION PROCEDURE Figure 015-22 Cable Co nnection Diagram for Accepting Synchroniza tion Clocks from an External High-St ability Os cillator (Single IMG Configuration) NAP-200-015 Sheet 29/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
CHAPTER 3 ND- 71548 (E) Page 230 Issue 2 INST ALLA TION PROCEDURE Figure 015-23 Cable Co nnection Diagram for Accepting Synchroniza tion Clocks from an External High-S tability Oscillator (Multiple IM G Configuration) NAP-200-015 Sheet 30/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
ND-71548 (E) CHAPTER 3 Page 231 Issue 2 INST ALLA TION PROCEDURE Figure 015-24 Cable Co nnection Diagram for Distri buting Clo ck from a Digital Interfa ce (Single IMG Configuratio n) NAP-200-015 Sheet 31/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
CHAPTER 3 ND- 71548 (E) Page 232 Issue 2 INST ALLA TION PROCEDURE Figure 015-25 Cab l e Connection Dia gram for Distribut ing Clock from a Digital In terface (Multiple IMG Co nfiguration) NAP-200-015 Sheet 32/32 Cable T ermination and Cross Connections from MDF to Periphe ral Equipment, C.
ND-71548 (E) CHAPTER 3 Page 233 Issue 2 INST ALLA TION PROCEDURE This NAP explains the installation of the DESK CONS OLE and Cab le Connection. Figure 016-1 shows th e outer view of the DESK CONSOLE. Use the P A-CS33 (A TI) card as an interface card between the system and the DESK CONSOLE.
CHAPTER 3 ND- 71548 (E) Page 234 Issue 2 INST ALLA TION PROCEDURE Figure 016-2 Cable Connection Diagram for Desk Console NAP-200-016 Sheet 2/44 Installation of the DESK CONSOLE and Cable Connectio n AT T E N T I O N Contents S tatic Sensitive Handling Precautions Re quired To connect DESK CONSOLE(s), the PA -CS33 card is used as the interface card.
ND-71548 (E) CHAPTER 3 Page 235 Issue 2 INST ALLA TION PROCEDURE Figure 016-2 Cable Connection Di agram for Desk Console (Continued) NAP-200-016 Sheet 3/44 Installation of the DESK CONSOLE and Cable C.
CHAPTER 3 ND- 71548 (E) Page 236 Issue 2 INST ALLA TION PROCEDURE Note: When r eplacing Attendant Console with DE SK CONSOLE, follow the pr ocedure below: 1 Turn OFF the PWR card in the PIM. 2 Remove installation cables connected to ATT0, ATT1 and LT connectors on the ATT TERM.
ND-71548 (E) CHAPTER 3 Page 237 Issue 2 INST ALLA TION PROCEDURE 1. CABLE CONNECTION DIA GRAM (a) When the power is supplied from the PBX Figure 016-3 Cable Connection Dia gram (When the Power Is Supplied from the PBX) The maximum distance between the A TI circuit card and DESK CONSOLE is as shown below .
CHAPTER 3 ND- 71548 (E) Page 238 Issue 2 INST ALLA TION PROCEDURE 2. CALCULA TION OF THE DIST ANCE BE TWEEN THE A TI CIRCUIT CARD AND MODULAR ROSETTE The distance M in Figure 016-3 is dete rmined by the Direct-Current resistan ce of powe r supply cables (–48V and GND).
ND-71548 (E) CHAPTER 3 Page 239 Issue 2 INST ALLA TION PROCEDURE (b) When using Local Po wer Supply Note Note: When using local power supply , DESK CONSO LE cannot be used in case of power failur e.
CHAPTER 3 ND- 71548 (E) Page 240 Issue 2 INST ALLA TION PROCEDURE Figure 016-5 Cable Connection Dia g ram for DESK CONSOLE Modular Block NAP-200-016 Sheet 8/44 Installation of the DESK CONSOLE and Cable Connection Wire the cables to th e Modular Block as shown below.
ND-71548 (E) CHAPTER 3 Page 241 Issue 2 INST ALLA TION PROCEDURE 3. MOUNTING OF HE ADSET (OPTIONAL) The Headset cable connects to one of the modular jacks (HAND H/S 0 or H/S 1) on the bottom o f DESK CONSOLE.
CHAPTER 3 ND- 71548 (E) Page 242 Issue 2 INST ALLA TION PROCEDURE 4. MOUNTING OF HANDSET (OPTIONAL) The Handset cable connects to the modular jack (HAND H/S 0) on the bottom of DESK CONSOLE.
ND-71548 (E) CHAPTER 3 Page 243 Issue 2 INST ALLA TION PROCEDURE Figure 016-7 Mounting of Handset (Lef t Side of DESK CONSOLE) (Continued) NAP-200-016 Sheet 1 1/ 44 Installation of the DESK CONSOLE and Cable Connection 2. Connect the Handset code to HAND H/S0 connector as shown below (H /S1 is not used for the Handset).
CHAPTER 3 ND- 71548 (E) Page 244 Issue 2 INST ALLA TION PROCEDURE Figure 016-7 Mounting of Handset (Lef t Side of DESK CONSOLE) (Continued) NAP-200-016 Sheet 12/44 Installation of the DESK CONSOLE and Cable Connection Mount the Handset Support to DESK CO NSOLE with 3 screws as shown below .
ND-71548 (E) CHAPTER 3 Page 245 Issue 2 INST ALLA TION PROCEDURE (b) When mounting at the right side of DESK CONSOLE Figure 016-8 Mounting of Handset (Right Side of DESK CONSOLE) NAP-200-016 Sheet 13/.
CHAPTER 3 ND- 71548 (E) Page 246 Issue 2 INST ALLA TION PROCEDURE Figure 016-8 Mounting of Handse t (Ri ght Side of DESK CONSOLE) (Continued) NAP-200-016 Sheet 14/44 Installation of the DESK CONSOLE and Cable Connection 3. Connect the Handset code to HAND H /S0 connector as shown below (H/S1 is not used for the Ha ndset).
ND-71548 (E) CHAPTER 3 Page 247 Issue 2 INST ALLA TION PROCEDURE Figure 016-8 Mounting of Handse t (Ri ght Side of DESK CONSOLE) (Continued) NAP-200-016 Sheet 15/44 Installation of the DESK CONSOLE and Cable Connection Mount the Handset Support to DESK C ONSOLE with 3 screws as shown below .
CHAPTER 3 ND- 71548 (E) Page 248 Issue 2 INST ALLA TION PROCEDURE 5. CONNECTION OF RE CORDING EQUIPMENT The following are required for using recording function: • T he RECC circuit card • Recordin.
ND-71548 (E) CHAPTER 3 Page 249 Issue 2 INST ALLA TION PROCEDURE (a) When using three DESK CONSOLEs and one recorder Note 1 Note 1: Switch settings of SW10, SW12 and SW13 on the P A-M87 card ar e r equir ed. For switch setting and con- nector lead accommod ation, r efe r to the NEAX2400 IPX Cir cuit Ca r d Manual.
CHAPTER 3 ND- 71548 (E) Page 250 Issue 2 INST ALLA TION PROCEDURE (b) When using six DESK CONSOLEs and one recording equipment Note 1 Note 1: Switch settings of SW10, SW12 and SW13 on the P A-M87 card ar e r equir ed. For switch setting and con- nector lead accommod ation, r efe r to the NEAX2400 IPX Cir cuit Ca r d Manual.
ND-71548 (E) CHAPTER 3 Page 251 Issue 2 INST ALLA TION PROCEDURE 6. 8-CORE LINE CABLE (INST ALLA TION CABLE) Figure 016-12 8-core Line Cable NAP-200-016 Sheet 19/44 Installation of the DESK CONSOLE and Cable Connection Note 1: Cut the cable in pr oper length.
CHAPTER 3 ND- 71548 (E) Page 252 Issue 2 INST ALLA TION PROCEDURE 7. CONNECTION OF AC-DC ADAPTER (OPTIONAL) The AC-DC adapter is required when the power supply from the distant PBX is not available.
ND-71548 (E) CHAPTER 3 Page 253 Issue 2 INST ALLA TION PROCEDURE 8. MOUNTING OF ADD-ON CONS OLE (FOR HOTEL S YSTEM) ADD-ON CONSOLE is used in the Hotel System.
CHAPTER 3 ND- 71548 (E) Page 254 Issue 2 INST ALLA TION PROCEDURE (b) Cable Connection Diagram of Add-On Co nsole (When using Local Power Supply ) Note Note: When using local power supply , DESK CONSO LE cannot be used in case of power failur e.
ND-71548 (E) CHAPTER 3 Page 255 Issue 2 INST ALLA TION PROCEDURE Figure 016-16 Cable Conne ction Diagra m for Add-On Console Modular Block NAP-200-016 Sheet 23/44 Installation of the DESK CONSOLE and Cable Connection W ire the cables to the Modular Block as shown below .
CHAPTER 3 ND- 71548 (E) Page 256 Issue 2 INST ALLA TION PROCEDURE 9. MOUNTING OF ADD-ON CONSOLE (a) When mounting at the rig ht side of DESK CONSOLE Figure 016-17 Mountin g of Add-On Cons ole (Right S.
ND-71548 (E) CHAPTER 3 Page 257 Issue 2 INST ALLA TION PROCEDURE Figure 016-17 Mounting of Add-On Console (Right Side of DESK CONSOLE) (Continued) NAP-200-016 Sheet 25/44 Installation of the DESK CONSOLE and Cable Connection Mount the ADD-ON CONSOLE to DESK CONSOLE with 3 screws as shown below .
CHAPTER 3 ND- 71548 (E) Page 258 Issue 2 INST ALLA TION PROCEDURE (b) When mounting at the left side of DESK CON SOLE Figure 016-18 Mounting of Add-On Console (Left Side of DESK CONSOLE) NAP-200-016 S.
ND-71548 (E) CHAPTER 3 Page 259 Issue 2 INST ALLA TION PROCEDURE Figure 016-18 Mounting of Add-On Cons ole (Lef t Side of DESK CONSOLE) (Continued) NAP-200-016 Sheet 27/44 Installation of the DESK CON.
CHAPTER 3 ND- 71548 (E) Page 260 Issue 2 INST ALLA TION PROCEDURE 10. CONNECTION OF AC-DC ADAPTER FOR ADD-ON CONSOLE (OPTIONAL) The AC-DC adapter is required when the power supply from the distant PBX is not available.
ND-71548 (E) CHAPTER 3 Page 261 Issue 2 INST ALLA TION PROCEDURE 1 1. CONFIGURA TION MENU 1 1 .1 General Configuration Menu is used for as signing configura tion data for DESK CONSOLE. The menu has the fol- lowing items: 1. HEADSET/HANDSET 2. HEADSET TYPE 3.
CHAPTER 3 ND- 71548 (E) Page 262 Issue 2 INST ALLA TION PROCEDURE (a) T urn on the Position Busy lamp. When the Position Busy lamp is of f, press the Position Busy ke y to turn on the Position Busy lamp (red). (b) Press the L2, L4, and SRC keys simultaneously .
ND-71548 (E) CHAPTER 3 Page 263 Issue 2 INST ALLA TION PROCEDURE The first page of Configuration Menu ap pears on the LCD. Configu ration Menu has a total of four page s. •1 s t P a g e • 2nd Page Note: Do not change this data. •3 r d P a g e •4 t h P a g e (c) When pressing the DEST key , the display changes to the next page.
CHAPTER 3 ND- 71548 (E) Page 264 Issue 2 INST ALLA TION PROCEDURE 12. SELECTION OF CONFIGURA TION ITEM By using a numeric key, press the desired number in Configuration Menu. A menu for assigning configuration data appears. Assign configura tion data referring to “Assignment of Configuration Data” on the next page.
ND-71548 (E) CHAPTER 3 Page 265 Issue 2 INST ALLA TION PROCEDURE 13. ASSIGNMENT OF CONFIGU RA TION DA T A This section explains how to assign each config uration data.
CHAPTER 3 ND- 71548 (E) Page 266 Issue 2 INST ALLA TION PROCEDURE 14. HEADSET/HANDSET This item specifies an optional device connected to the HA ND H/S0 connector. Note: W ith regar d to the H/S1 connector , only the Headset is connected. Accor dingly , data assignment for H/S1 connector is not r equir ed.
ND-71548 (E) CHAPTER 3 Page 267 Issue 2 INST ALLA TION PROCEDURE 15. HEADSET TYPE This item specifies the type of Head set connected to the H/S1 connector. (a) Press the desired number . An ast erisk shows the selected number . 1. The type of Headset is “SUPRA” 2.
CHAPTER 3 ND- 71548 (E) Page 268 Issue 2 INST ALLA TION PROCEDURE 16. MUTE This item specifies On/Off setting of the mute function for the HAND H/S0 or H/S1 connector. While the mute function is set to On, if the Mute key is pressed, the vo ice at the DESK CONSOLE side is not sent to the other party.
ND-71548 (E) CHAPTER 3 Page 269 Issue 2 INST ALLA TION PROCEDURE 17. REC CONTROL This item specifies the operation mode of a recordin g device. The followi ng two types of modes are available: Manual mode Manual mode is available when the REC circuit ca rd is mounted in the sy stem.
CHAPTER 3 ND- 71548 (E) Page 270 Issue 2 INST ALLA TION PROCEDURE 18. SUP CONNECTION This item specifies whether the superv isory console is connected or not. (a) Press the desired number . An asterisk (*) shows the selected number . 1. Supervisory Console is not connected 2.
ND-71548 (E) CHAPTER 3 Page 271 Issue 2 INST ALLA TION PROCEDURE 19. REC VOLUME ADJUSTMENT This item specifies the recording level of the received voice from the other part y. Note that the voice level at the operator side cannot be adjus ted. (a) Press the desired number .
CHAPTER 3 ND- 71548 (E) Page 272 Issue 2 INST ALLA TION PROCEDURE 20. BLF This item specifies On/Off setting of the BLF function. When using BLF function, system data assignment is also required. (a) Press the desired number . An asterisk (*) shows the selecte d number .
ND-71548 (E) CHAPTER 3 Page 273 Issue 2 INST ALLA TION PROCEDURE 21. HOLD/ST ART/RELEASE/SW AP This item specifies the locations of HOLD, START and RELEASE key. (a) Press the desired number . An asterisk (*) shows the selected number . 1. Original setting 2.
CHAPTER 3 ND- 71548 (E) Page 274 Issue 2 INST ALLA TION PROCEDURE 22. 2ND RINGIN G This item specifies on/off setting of the 2nd ringing. (a) Press the desired number . An ast erisk shows the selected number . 1. 2nd Ringing availab le 2. 2nd Ringing Not available SRC Return to Configuration Menu Note: Default setting is “2: DISABLE”.
ND-71548 (E) CHAPTER 3 Page 275 Issue 2 INST ALLA TION PROCEDURE 23. RINGING This item specifies on /off setting of ringing. (a) Press the desired number . An ast erisk shows the selected number . 1. Ringing available 2. Ringing Not available SRC Return to Configuration Menu Note: Default setting is “1: ENABLE”.
CHAPTER 3 ND- 71548 (E) Page 276 Issue 2 INST ALLA TION PROCEDURE 24. UPDA TING CONFIGURA TION DA T A After assigning the configuration data, take the next step as below: - T o update the configuration data While one of configuration menus is dis played on the LCD, press ANSWER key .
ND-71548 (E) CHAPTER 3 Page 277 Issue 2 INST ALLA TION PROCEDURE This NAP explains the installation of Maintenance Administ ration T erminal (MA T) and System Message Printer focusing on their cable connections.
CHAPTER 3 ND- 71548 (E) Page 278 Issue 2 INST ALLA TION PROCEDURE Figure 017-1 Cabling of MA T when Using Ethernet NAP-200-017 Sheet 2/10 Installation of the Maintenance Administration T erminal (MA T.
ND-71548 (E) CHAPTER 3 Page 279 Issue 2 INST ALLA TION PROCEDURE Figure 017-2 Cable Con nection Diagram for the MA T when Using RS-232C NAP-200-017 Sheet 3/10 Installation of the Maintenance Administr.
CHAPTER 3 ND- 71548 (E) Page 280 Issue 2 INST ALLA TION PROCEDURE 2. INST ALLA TION OF MA T AND CABLE CONNECTION BY USING MODEM Note: When the distance between PBX and the MA T (Mai ntenance Administration T erminal) exc eeds 15 meters (50 feet), connect them with Modems as shown in Figur e 017-3.
ND-71548 (E) CHAPTER 3 Page 281 Issue 2 INST ALLA TION PROCEDURE Figure 017-3 Cabling of MA T Using Modems NAP-200-017 Sheet 5/10 Installation of the Maintenance Administration T erminal (MA T) and Ca.
CHAPTER 3 ND- 71548 (E) Page 282 Issue 2 INST ALLA TION PROCEDURE 3. INST ALLA TION OF SYSTEM MESSAGE PRINTER AND CABLE CONNECTIONS Figure 017-4 Connection of Sys tem Message Printer NAP-200-017 Sheet.
ND-71548 (E) CHAPTER 3 Page 283 Issue 2 INST ALLA TION PROCEDURE Figure 017-5 IPX 2PORT CA-A Cable NAP-200-017 Sheet 7/10 Installation of the Maintenance Administration T erminal (MA T) and Cable Conn.
CHAPTER 3 ND- 71548 (E) Page 284 Issue 2 INST ALLA TION PROCEDURE Figure 01 7-6 Detail of RS-232C CA -(0) NAP-200-017 Sheet 8/10 Installation of the Maintenance Administration T erminal (MA T) and Cab.
ND-71548 (E) CHAPTER 3 Page 285 Issue 2 INST ALLA TION PROCEDURE Figure 01 7-7 Detail of RS-232C CA -(1) NAP-200-017 Sheet 9/10 Installation of the Maintenance Administration T erminal (MA T) and Cabl.
CHAPTER 3 ND- 71548 (E) Page 286 Issue 2 INST ALLA TION PROCEDURE Figure 01 7-8 Detail of RS-232C CA -(3) NAP-200-017 Sheet 10/10 Installation of the Maintenance Administration T erminal (MA T) and Ca.
ND-71548 (E) CHAPTER 3 Page 287 Issue 2 INST ALLA TION PROCEDURE This NAP explains the cable co nnection of SMDR equipment. Note: The SMDR RS-232C interface specifications ar e: • Sy nchr onization .
CHAPTER 3 ND- 71548 (E) Page 288 Issue 2 INST ALLA TION PROCEDURE Figure 018-1 Cabling of SMDR when Us ing Ethernet NAP-200-018 Sheet 2/4 Connections of SMDR AT T E N T I O N Contents S tatic Sensitiv.
ND-71548 (E) CHAPTER 3 Page 289 Issue 2 INST ALLA TION PROCEDURE Figure 018-2 Cable Connec tion Diagram for the SMDR wh en Using RS-232C NAP-200-018 Sheet 3/4 Connections of SMDR AT T E N T I O N Cont.
CHAPTER 3 ND- 71548 (E) Page 290 Issue 2 INST ALLA TION PROCEDURE Figure 018-3 Connec tion of SMDR by Using MODEM NAP-200-018 Sheet 4/4 Connections of SMDR AT T E N T I O N Contents S tatic Sensitive .
ND-71548 (E) CHAPTER 4 Page 291 Issue 2 SYSTEM ST ARTUP CHAPTER 4 SYSTEM ST ARTUP 1. GENERAL This Chapter describes the initial startup procedure and th e diagnosis procedure after installing PBX. Before be- ginning the syste m startup, thorou ghly read S ection 2.
CHAPTER 4 ND- 71548 (E) Page 292 Issue 2 SYSTEM ST ARTUP 8. If any portion of the Office Data (especially data related to ringing patterns) has been changed via com- mands “AR TD” , “AKYD”, or “ASYD”, the system must be initialized and test must be performed to verify the data.
ND-71548 (E) CHAPTER 4 Page 293 Issue 2 SYSTEM ST ARTUP Figure 4-1 How to handle Circuit Cards A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required SP-234 SN1234 SP-234 SN1234 Connect ground wire to the Earth terminal of the frame. Place the circuit card on a conductive sheet.
CHAPTER 4 ND- 71548 (E) Page 294 Issue 2 SYSTEM ST ARTUP • When placing a circuit card on a table or other flat surface, spread out a conductive sheet and set the card on the sheet. • Set the MB switch of the circuit card to the UP position and confirm its mounting slot (Note) .
ND-71548 (E) CHAPTER 4 Page 295 Issue 2 SYSTEM ST ARTUP NAP-200-019 Sheet 1/2 Power ON ST AR T V isua l Inspection Check whether any pins on the backplane of each Module are bent and cause a short. Check whether any foreign matt er such a s a cleaning fluid residue is present on the connector portion of the circuit cards.
CHAPTER 4 ND- 71548 (E) Page 296 Issue 2 SYSTEM ST ARTUP NAP-200-019 Sheet 2/2 Power ON Insert all PWR Supplies Insert all PW R Supplies into their positions. Insertion Steps: 1. T urn each Power Supply’ s ci rcuit breaker OFF and insert them one at a time.
ND-71548 (E) CHAPTER 4 Page 297 Issue 2 SYSTEM ST ARTUP Perform the following ite ms for loading the program from the flash card. Figure 020-1 Locations of Switch es, OPE, and Flash Card Slot NAP-200-.
CHAPTER 4 ND- 71548 (E) Page 298 Issue 2 SYSTEM ST ARTUP NAP-200-020 Sheet 2/7 Program Install and Load ST AR T Flash Card Insertion Here describes the pr ocedure for inserting a flash card into PC. PC needs to be installed W indows 2000 and equipped with PCMCIA card slot.
ND-71548 (E) CHAPTER 4 Page 299 Issue 2 SYSTEM ST ARTUP NAP-200-020 Sheet 3/7 Program Install and Load Software W riting Here describes the procedur e for writing updated program into a flash card. This step is performed using FLCVTR. Be careful when using this command as following: - Login to PC as administrator or the same level privilege.
CHAPTER 4 ND- 71548 (E) Page 300 Issue 2 SYSTEM ST ARTUP NAP-200-020 Sheet 4/7 Program Install and Load ERROR MESSAGE LIST A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required ERROR MESSAGE ANSWER Specify the flash card. Make sure the fl ash card drive is correctly selected.
ND-71548 (E) CHAPTER 4 Page 301 Issue 2 SYSTEM ST ARTUP NAP-200-020 Sheet 5/7 Program Install and Load Prepare the flash card containing the program. Make sure that all power of the PBX is off. Insert the Flash Ca rd into the slot. Set the SENSE switch to "1" for lo ading the program on to the MEM.
CHAPTER 4 ND- 71548 (E) Page 302 Issue 2 SYSTEM ST ARTUP NAP-200-020 Sheet 6/7 Program Install and Load T urn ON the PBX as follows. (Note ) Loading starts. ("LOAD" lamp lights red while the Flash Card is being accessed.) The 7-seg LED (right side) indicates th e process of the loading as follows.
ND-71548 (E) CHAPTER 4 Page 303 Issue 2 SYSTEM ST ARTUP NAP-200-021 Sheet 1/2 Assignment of Office Data ST AR T Start up the MA T Enter basic data Assign the following data via the MA T for each of the office data programming sheet.
CHAPTER 4 ND- 71548 (E) Page 304 Issue 2 SYSTEM ST ARTUP NAP-200-021 Sheet 2/2 Assignment of Office Data Save Office Data onto F lash Card Save the Office Data onto the Flash Card from the MEM using the “MEM_HDD” command.
ND-71548 (E) CHAPTER 4 Page 305 Issue 2 SYSTEM ST ARTUP NAP-200-022 Sheet 1/5 Check of Lamp Indication s and System Messages ST AR T Check lamp indications on Line/ T runk circuit cards Check lamp indications on ea ch of the assigned Line/ T runk circuit cards.
CHAPTER 4 ND- 71548 (E) Page 306 Issue 2 SYSTEM ST ARTUP Figure 022-1 LED Indications in Normal Ope ration (Single IMG Configuration) NAP-200-022 Sheet 2/5 Check of Lamp Indication s and System Messag.
ND-71548 (E) CHAPTER 4 Page 307 Issue 2 SYSTEM ST ARTUP Figure 022-2 LED Indications of IMG0 in Normal Operation (M ultiple IMG Configuratio n) NAP-200-022 Sheet 3/5 Check of Lamp Indication s and Sys.
CHAPTER 4 ND- 71548 (E) Page 308 Issue 2 SYSTEM ST ARTUP Figure 022-3 LED Indications of IMG1 in Normal Operation (M ultiple IMG Configuratio n) NAP-200-022 Sheet 4/5 Check of Lamp Indication s and Sy.
ND-71548 (E) CHAPTER 4 Page 309 Issue 2 SYSTEM ST ARTUP Figure 022-4 LED Indica tions of IMG 2/3 in Norm al Operation (example) ( M ultiple IMG Configuration) NAP-200-022 Sheet 5/5 Check of Lamp Indication s and System Messages This figure shows the LED indications on a fully expanded system of IMG 2/3 as an example.
CHAPTER 4 ND- 71548 (E) Page 310 Issue 2 SYSTEM ST ARTUP T est Outline: The System has Alarm Lamps on the T OPU. Figure 023-1 shows the Alarm Lamps on the TOPU. For more information about each lamp, see the NEAX2400 IPX System Operation s and Maintenance Manual.
ND-71548 (E) CHAPTER 4 Page 311 Issue 2 SYSTEM ST ARTUP NAP-200-023 Sheet 2/2 Check of Alarm Lamps of the TOPU ST AR T T est of MJ (MAJOR) Lamp Set the circuit breakers of the Power Supplies (PWR0, 1) in a PIM to OFF (About 10 seconds later , set the circuit breaker(s) to ON again.
CHAPTER 5 ND- 71548 (E) Page 312 Issue 2 INST ALLA TION TEST PROCEDURE CHAPTER 5 INST ALLA TION TEST PROCEDURE 1. HOW TO ENTER DA T A IN THE TEST CHECK COLUMN Each NAP in this Chapter has check column for test r esult entry for each test item (see Figure 5-1).
ND-71548 (E) CHAPTER 5 Page 313 Issue 2 INST ALLA TION TEST PROCEDURE Figure 5-1 Example of Entry to T est Check Column • This example is NAP-200-023: DT Connection T est When “*” is already printed in the “PROVIDED” section, the item concerned is a basic function of the system .
CHAPTER 5 ND- 71548 (E) Page 314 Issue 2 INST ALLA TION TEST PROCEDURE 2. BASIC CONNECTION TEST 2.1 Outline After the system has been started up, establish some basi c connections and verify that the system operates nor- mally.
ND-71548 (E) CHAPTER 5 Page 315 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-024 Sheet 1/1 DT (Dial T one) Conn ection T est ST AR T Check whether the OPE lamp (G) is turning ON on the RST circuit cards. Check whether the OPE lamp (G) is turning ON on the LC circuit cards.
CHAPTER 5 ND- 71548 (E) Page 316 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-025 Sheet 1/1 S tation to S tation Connection T est ST AR T Confirm that a connection can be established b etween Station A and Station B. St ation A goes of f-hook. Station A hears DT .
ND-71548 (E) CHAPTER 5 Page 317 Issue 2 INST ALLA TION TEST PROCEDURE 3. SYSTEM INITIALIZED TEST 3.1 Outline Tests are to be performed on the re start processing (reinitialization) and sy stem changeover functions which en- able the system to restart its operations and services.
CHAPTER 5 ND- 71548 (E) Page 318 Issue 2 INST ALLA TION TEST PROCEDURE T est Outline: T ests are performed to see if a change over of the dual s ystems (Control Sy stems and Speech Path Systems) of the PBX can be executed.
ND-71548 (E) CHAPTER 5 Page 319 Issue 2 INST ALLA TION TEST PROCEDURE Figure 026-1 How to Perform a Co ntrol System Changeover (Single IMG Configur ation) Figure 026-2 How to Perfor m a Control Syst e.
CHAPTER 5 ND- 71548 (E) Page 320 Issue 2 INST ALLA TION TEST PROCEDURE Figure 026-3 LEDs and Switches on TSW/MUX NAP-200-026 Sheet 3/8 System Changeover T est Single IMG Configuration Perform a TSW system changeover test by means of switch operations.
ND-71548 (E) CHAPTER 5 Page 321 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-026 Sheet 4/8 System Changeover T est Multiple IMG Configuration Perform a Speech Path system ch angeover test b y switch operations.
CHAPTER 5 ND- 71548 (E) Page 322 Issue 2 INST ALLA TION TEST PROCEDURE Figure 026-4 LEDs and Switches for Syst e m Changeover (Multiple IMG Configura tion) NAP-200-026 Sheet 5/8 System Changeover T es.
ND-71548 (E) CHAPTER 5 Page 323 Issue 2 INST ALLA TION TEST PROCEDURE Figure 026-5 System Block Diagram (TSW and MUX) (Sing le IMG Configuration) NAP-200-026 Sheet 6/8 System Changeover T est Single I.
CHAPTER 5 ND- 71548 (E) Page 324 Issue 2 INST ALLA TION TEST PROCEDURE Figure 026-6 System Block Diagram (G T and Other Controlling Blocks) (Multiple IMG Co nfiguration) NAP-200-026 Sheet 7/8 System Changeover T est Multiple IMG Configuration This figure shows a system block diagram centering on the CPU and its controlling G T .
ND-71548 (E) CHAPTER 5 Page 325 Issue 2 INST ALLA TION TEST PROCEDURE Figure 026-7 System Block Dia gram (Sp eech Path) (Multiple IMG Configuration) NAP-200-026 Sheet 8/8 System Changeover T est Multiple IMG Configuration This figure shows a system block diagram centering on th e G T and its controlling Spe ech Path System.
CHAPTER 5 ND- 71548 (E) Page 326 Issue 2 INST ALLA TION TEST PROCEDURE T est Outline: T ests are performed to see if system in itialization can be executed. There are two kinds of test method; test by using ST AR T button on the TOPU, and test by turning power ON/OFF .
ND-71548 (E) CHAPTER 5 Page 327 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-027 Sheet 2/2 System Initialization T est Perform system initializati on (by powering ON/OFF). Initialization by powering ON/OFF . On all PWR Supplies, set the circuit breaker OFF (Down).
CHAPTER 5 ND- 71548 (E) Page 328 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-028 Sheet 1/1 Circuit Card Initialization T est ST AR T Make the No. 0 CPU the ACT system. In each PIM, initialize any Line/T runk circuit card. On the selected Line/T runk circuit card, set MB switch UP .
ND-71548 (E) CHAPTER 5 Page 329 Issue 2 INST ALLA TION TEST PROCEDURE 4. PORT CONNECTION TEST 4.1 Outline Tests are to be performed on all the circuits of LC and Trunk circuit cards an d PWR Supplies. LC an d Trunk circuit cards are tested to confirm th eir operations and speech path conditions.
CHAPTER 5 ND- 71548 (E) Page 330 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-029 Sheet 1/2 ORT (RST Card) Connection T est ST AR T Make busy all OR T s On the front of RST card, set all MBR switches (0-7) to OFF , making all OR T s busy . From Station A (DP), test OR T s one circuit at a time.
ND-71548 (E) CHAPTER 5 Page 331 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-029 Sheet 2/2 ORT (RST Card) Connection T est Perform tests for a situatio n where all OR T s are busy . System Data SYS1, INDEX 4, b 0 =0 Station A goes off-hook. Stati on A confirms that Reorder T one (ROT) is heard Station A goes off-hook.
CHAPTER 5 ND- 71548 (E) Page 332 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-030 Sheet 1/1 A TTCON (A TI Card) C onnection T est ST AR T A station repeats an A TTCON call. Each A TTCON answers the call. Station A dials the operator access code (normally , “0”).
ND-71548 (E) CHAPTER 5 Page 333 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-031 Sheet 1/1 Line (LC, ELC, DLC, Ca rd) Connection Te s t An A TTCON or D term is called from each station.
CHAPTER 5 ND- 71548 (E) Page 334 Issue 2 INST ALLA TION TEST PROCEDURE T est Outline: The purpose of this test is to confir m, by setting up an outgoing connection test for each outgoing trunk, that speech can be made and that the call can be released.
ND-71548 (E) CHAPTER 5 Page 335 Issue 2 INST ALLA TION TEST PROCEDURE • Set up a loop-back connection between the COT (C.O. T runk) to be tested and a station line. Figure 032-1 COT T est Configurat ion • The trunk route must be assign ed for Loop S tart.
CHAPTER 5 ND- 71548 (E) Page 336 Issue 2 INST ALLA TION TEST PROCEDURE • If the TL T is a 4W E&M System, connect the related leads as shown below: • Set up a loop-back connection between the D.
ND-71548 (E) CHAPTER 5 Page 337 Issue 2 INST ALLA TION TEST PROCEDURE T est Outline: The purpose of this test is to confirm, by setting up an incoming trunk connection test for each incoming trunk, that speech can be made with A TTCON when a Ringdown Signal Interface is us ed, or with a station when a Dial-In Sig- nal Interface is used.
CHAPTER 5 ND- 71548 (E) Page 338 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-033 Sheet 2/2 Incoming T runk (COT , TL T , DTI Card) Connection T est For a Dial-In Signal Interface. Station A dials the access code for the outgoing trunk and the number of Station B.
ND-71548 (E) CHAPTER 5 Page 339 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-034 Sheet 1/1 Direct-In T ermina tion T r unk (COT Card) Connection T est ST AR T On the MDF , make temporary cross connections betw een the T runk for Direct-In T ermination (DIT) and an LC.
CHAPTER 5 ND- 71548 (E) Page 340 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-035 Sheet 1/1 SND (RST Card) Connecti on T est ST AR T When a C.O. Line or T ie Line is not connected with the trunk, make an arrangement for trunk loop-back as illustrated above.
ND-71548 (E) CHAPTER 5 Page 341 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-036 Sheet 1/1 3-party Conference T runk Function T est ST AR T Made busy all CFT s Made busy a ll CFT s using MA T command “MBTK”. T est CFT s one at a time Un-busy (make idle) only CFT to be tested.
CHAPTER 5 ND- 71548 (E) Page 342 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-037 Sheet 1/1 Connection T est-Announcement Tr u nk for Announcement Service START Dial the announcement service code Station A dials the announcement service code.
ND-71548 (E) CHAPTER 5 Page 343 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-038 Sheet 1/1 Connection T est-Digital Announcement T ru nk for Announcement Service START Dial the announcement service code Statio n A dials the announcement service code.
CHAPTER 5 ND- 71548 (E) Page 344 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-039 Sheet 1/1 Connection T est-Paging T runk for Pagi ng Access Service ST AR T Dial the paging access code Station A/A TTCON dials the paging acces s code and hears CRBT (Continuous Ringback T one).
ND-71548 (E) CHAPTER 5 Page 345 Issue 2 INST ALLA TION TEST PROCEDURE • Paging T ransfer Servic e can be selected ac cording to System Data (SYS1, INDEX 73).
CHAPTER 5 ND- 71548 (E) Page 346 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-040 Sheet 2/2 Connection T est-Paging T runk for Pagi ng T ransfer Service Connection For Non-Delay-System Stat ion C is connected to Station A. When S tation A hangs up, S tations B an d C are automatically connected with each other .
ND-71548 (E) CHAPTER 5 Page 347 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-041 Sheet 1/1 Radio Paging Trunk (COT Card) Connection T est ST AR T Call the Radio Paging Equipment Station A dial s the radio paging access code and hears Special Dial T one from the Ra dio Paging Equipment, then dials the slave statio n number .
CHAPTER 5 ND- 71548 (E) Page 348 Issue 2 INST ALLA TION TEST PROCEDURE T est Outline: The Howler T one Generator and the Ringing Generator are equipped on the PWR Supply . The purpose of the test is to confirm ringing signal by setting up a station to station connection and a howler tone connection from a station accommodated in any PIM.
ND-71548 (E) CHAPTER 5 Page 349 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-042 Sheet 2/2 Howler & Ringing Signal T est Check PWR1 in each PIM. While both PWR Supplies are OFF , turn ON power to PWR1. Leave PWR0 OFF . Check howler tone. A station accommodated in the PIM for which the PWR Supply is to be te sted goes off- hook.
CHAPTER 5 ND- 71548 (E) Page 350 Issue 2 INST ALLA TION TEST PROCEDURE 5. OVERALL TEST 5.1 Outline Tests are to be performed to check C. O. Lines and/or Tie Lines by connectin g them to a trunk on an individual basis. The speech path conditions (speech level, presence of noise, one-way speech, no sp eech, etc.
ND-71548 (E) CHAPTER 5 Page 351 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-043 Sheet 1/1 Overall T est for C.O. Line Outgoing Call ST AR T Seizure of trunk to be tested When seizing from a station Place the trunk to be tested into idle state, and ma ke all other trunks busy .
CHAPTER 5 ND- 71548 (E) Page 352 Issue 2 INST ALLA TION TEST PROCEDURE T est Outline: The tests comprising this NAP are to be performed according to the C.O. Line Number T able provided by the C.O. If the C.O. Line Numbers are not kn own, tests cannot be performed because loop-back cannot be performed at the C.
ND-71548 (E) CHAPTER 5 Page 353 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-045 Sheet 1/2 Overall T est of CCIS Tie Line Outgoing Call ST AR T Seizure of trunk to be tested When seizing from a station Place the trunk to be tested into idle state, and make busy all other trunks.
CHAPTER 5 ND- 71548 (E) Page 354 Issue 2 INST ALLA TION TEST PROCEDURE (Procedure A) NAP-200-045 Sheet 2/2 Overall T est of CCIS Tie Line Outgoing Call ST AR T On the DTI/CCT card, set its MB switch UP .
ND-71548 (E) CHAPTER 5 Page 355 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-046 Sheet 1/1 Overall T est of CCIS Tie Line Incoming Call ST AR T Seizure of trunk to be tested Plac e the trunk to be tested into idle state, and make busy all other trunks.
CHAPTER 5 ND- 71548 (E) Page 356 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-047 Sheet 1/2 T est of Connection and Alternate Routing to All T ie Lines ST AR T T est the trunks in the primary route one at a time. Make busy all trunks in the pr imary route except the trunk to be tested.
ND-71548 (E) CHAPTER 5 Page 357 Issue 2 INST ALLA TION TEST PROCEDURE Figure 047-1 Combination of Tie Line Ne twork and Public Network Figure 047-2 T ie Line Network NAP-200-047 Sheet 2/2 T est of Con.
CHAPTER 5 ND- 71548 (E) Page 358 Issue 2 INST ALLA TION TEST PROCEDURE Figure 048-1 T est of T andem Connection to T ie Line NAP-200-048 Sheet 1/2 T est of T andem Connection to T ie Line ST AR T T est of direct dial-in tandem connection T est of Primary Route Station A calls S tation B.
ND-71548 (E) CHAPTER 5 Page 359 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-048 Sheet 2/2 T est of T andem Connection to T ie Line T est of tandem connection via A TTCON Station A dials the access code for the A TTCON. The A TTCON answers and sets up a tandem connection to St ation B.
CHAPTER 5 ND- 71548 (E) Page 360 Issue 2 INST ALLA TION TEST PROCEDURE For the PBX, P ADs can be set according to th e connecting status of the T ie Line involved. (a) For an outgoing/incoming call via a T ie Line: • V ia MA T command “AR TD” and switch settings on the TL T circuit card.
ND-71548 (E) CHAPTER 5 Page 361 Issue 2 INST ALLA TION TEST PROCEDURE When setting up a No. 7 CCIS Network, P AD se tting differs from that in the analog network. (c) For an outgoing call to/incoming call from a T ie Line: • V ia “AR TD” command.
CHAPTER 5 ND- 71548 (E) Page 362 Issue 2 INST ALLA TION TEST PROCEDURE 6. IP CONNECTION TEST 6.1 Outline Connection tests are to be performed to check IP connection by connecting terminal s to the trunks and verify the normality of the system. FCCS sta nds for Fusion Call Control Signaling.
ND-71548 (E) CHAPTER 5 Page 363 Issue 2 INST ALLA TION TEST PROCEDURE The following describes the procedure fo r confirming the normality of IP P AD. Here describes procedure for per- forming connection test between IP Enabled D term and the existing terminal (D term and analog terminal) or the ex- isting trunk (COT , TL T , and so on).
CHAPTER 5 ND- 71548 (E) Page 364 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-050 Sheet 2/3 IP P AD Connection T e st A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required The following explains how to solve the problems. When the problem can not be solved by the step, go to the next step.
ND-71548 (E) CHAPTER 5 Page 365 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-050 Sheet 3/3 IP P AD Connection T e st A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required Check that the speech path channel is unblocked, using MBTK. Route restriction is cancelled by using A TNR and ARSC.
CHAPTER 5 ND- 71548 (E) Page 366 Issue 2 INST ALLA TION TEST PROCEDURE The following describes the procedure for confirming the normality of IP TRK in the case of FCCS over IP . Here describes procedure for performing connection t est over FCCS between existing terminals.
ND-71548 (E) CHAPTER 5 Page 367 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-051 Sheet 2/3 IPTRK (IP T runk Card for FCCS) Connection T est A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required The following explains how to solve the problems.
CHAPTER 5 ND- 71548 (E) Page 368 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-051 Sheet 3/3 IPTRK (IP T runk Card for FCCS) Connection T est A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required Adjust parameters by using A VIPS. After the settings, initialize the circuit card.
ND-71548 (E) CHAPTER 5 Page 369 Issue 2 INST ALLA TION TEST PROCEDURE The following describes the procedure for confirming the normality of IP TR K in the case of CCIS over IP . Here describes procedure for performing connection t est over CCIS between existing terminals.
CHAPTER 5 ND- 71548 (E) Page 370 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-052 Sheet 2/3 IPTRK (IP T runk Card for CCIS) Connection T est A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required The following explains how to solve the problems.
ND-71548 (E) CHAPTER 5 Page 371 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-052 Sheet 3/3 IPTRK (IP T runk Card for CCIS) Connection T est A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required Adjust parameters by using A VIPS. After the settings, initialize the circuit card.
CHAPTER 5 ND- 71548 (E) Page 372 Issue 2 INST ALLA TION TEST PROCEDURE The following describes the p rocedure for confirming the normality of IP TRK in the case of H.323 over IP . Here describes procedure for performing connection t est with H.323 between existing terminals.
ND-71548 (E) CHAPTER 5 Page 373 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-053 Sheet 2/3 IPTRK (IP T runk Card for H.323) Connection T est A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required The following explains how to solve the problems.
CHAPTER 5 ND- 71548 (E) Page 374 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-053 Sheet 3/3 IPTRK (IP T runk Card for H.323) Connection T est A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required Make sure that the trunk to be tested is unblocked, using MBTK.
ND-71548 (E) CHAPTER 5 Page 375 Issue 2 INST ALLA TION TEST PROCEDURE The following describes the procedure fo r confirming the normality of PHA. Here describes procedure for perform- ing connection test between analog term inals attached to MC. Perform the test with the other combinations of ter- minals, when needed.
CHAPTER 5 ND- 71548 (E) Page 376 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-054 Sheet 2/2 PHA Connection T est A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required The following explains how to solve the problems. When the problem can not be solved by the step, go to the next step.
ND-71548 (E) CHAPTER 5 Page 377 Issue 2 INST ALLA TION TEST PROCEDURE The following describes the procedure fo r confirming the normality of PHD. Here describes procedure for perform- ing connection test be tween IP Enabled D term s. Perform the test with the othe r combinations of terminals, when needed.
CHAPTER 5 ND- 71548 (E) Page 378 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-055 Sheet 2/3 PHD Connection T est A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required The following explains how to solve the problems. When the problem can not be solved by the step, go to the next step.
ND-71548 (E) CHAPTER 5 Page 379 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-055 Sheet 3/3 PHD Connection T est A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required Make sure the data by using AISDL.
CHAPTER 5 ND- 71548 (E) Page 380 Issue 2 INST ALLA TION TEST PROCEDURE The following describes the pr ocedure for confirming the no rmality of PHC. Here describes procedure for perform- ing connection test be tween IP Enabled D term s. Perform the test with the othe r combinations of terminals, when needed.
ND-71548 (E) CHAPTER 5 Page 381 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-056 Sheet 2/3 PHC Connection T est A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required The following explains how to solve the problems. When the problem can not be solved by the step, go to the next step.
CHAPTER 5 ND- 71548 (E) Page 382 Issue 2 INST ALLA TION TEST PROCEDURE NAP-200-056 Sheet 3/3 PHC Connection T est A TTENTION Content s S tatic Sensitive Handlin g Precautio ns Required The following explains how to solve the problems. When the problem can not be solved by the step, go to the next step.
ND-71548 (E) CHAPTER 6 Page 383 Issue 2 F AUL T RECOVERY DURING TESTS CHAPTER 6 F AUL T RECOVER Y DURING TESTS 1. GENERAL The fault recovery procedures in th is Chap ter are used wh en a connectio n c.
CHAPTER 6 ND- 71548 (E) Page 384 Issue 2 F A UL T RECOVER Y DURING TESTS NAP-200-057 Sheet 1/2 Abnormal Lamp Indications After System St a r t u p ST AR T Perform the following when the OPE lamp (Green) does not turn ON on any circuit cards in a PIM Using MA T command “AUNT”, check whet her UNIT data has been assigne d.
ND-71548 (E) CHAPTER 6 Page 385 Issue 2 F AUL T RECOVERY DURING TESTS NAP-200-057 Sheet 2/2 Abnormal Lamp Indications After System St a r t u p Perform the following when the OPE lamp (Green ) does not turn ON on a T runk circuit card. Confirm that the MB switch of the circuit card is DOWN.
CHAPTER 6 ND- 71548 (E) Page 386 Issue 2 F A UL T RECOVER Y DURING TESTS NAP-200-058 Sheet 1/1 DT (Dial T on e) Connection Fault ST AR T Dial tone is not heard. On the MDF , check the cross connections betw een the telephone and the corresponding l ine circuit.
ND-71548 (E) CHAPTER 6 Page 387 Issue 2 F AUL T RECOVERY DURING TESTS NAP-200-059 Sheet 1/2 S tation to S tation Connection Fault ST AR T Dial T one (DT) is still heard after a di git is dialed (canno.
CHAPTER 6 ND- 71548 (E) Page 388 Issue 2 F A UL T RECOVER Y DURING TESTS NAP-200-059 Sheet 2/2 S tation to S tation Connection Fault After the call has been answ ered, noise is heard or the speech path is one-wa y . If the fault involves one or more lines within th e same LC circuit card, replace the card with a spare.
ND-71548 (E) CHAPTER 7 Page 389 Issue 2 WORK AFTER INST ALLA TION TESTS CHAPTER 7 WORK AFTER INST ALLA TION TESTS This Chapter explains various kinds of work and site cleaning, et c. which the installer must perform after completing installation tests so that the system can be cut over normally .
CHAPTER 7 ND- 71548 (E) Page 390 Issue 2 WORK AFTER INST ALLA TION TESTS 2. PREP ARA TION OF TEST RESUL T REPORT When submitting a repo rt of test results to the end user or when performing test with customer’s representatives attending, prepare Test Result Report and record the test results into the prepared Test Result Report.
ND-71548 (E) CHAPTER 7 Page 391 Issue 2 WORK AFTER INST ALLA TION TESTS Figure 7-1 Mounting of the Covers 07/31/02.
CHAPTER 7 ND- 71548 (E) Page 392 Issue 2 WORK AFTER INST ALLA TION TESTS Figure 7-2 Side Cover Mounting Method (BASEU+LPR+PIM0) SCREW FRONT REAR SIDE COVER 07/31/02.
ND-71548 (E) CHAPTER 7 Page 393 Issue 2 WORK AFTER INST ALLA TION TESTS Figure 7-3 Side Cover Mounting Method (PIM) REAR SIDE COVER.
CHAPTER 7 ND- 71548 (E) Page 394 Issue 2 WORK AFTER INST ALLA TION TESTS Figure 7-4 Rear Cover Mounting Method ( B ASEU+LPR+PIM0) SCREW SCREW SCREW SCREW SCREW SCREW REAR SIDE REAR COVER SIDE VIEW.
ND-71548 (E) CHAPTER 7 Page 395 Issue 2 WORK AFTER INST ALLA TION TESTS Figure 7-5 Rear Cover Mounting Metho d (PIM) MODULE REAR SIDE REAR COVER SCREW SCREW MODULE REAR COVER SIDE VIEW.
CHAPTER 7 ND- 71548 (E) Page 396 Issue 2 WORK AFTER INST ALLA TION TESTS Figure 7-6 Rear Cover Mounting Method (F ANU) FA N U REAR COVER SCREW SCREW FA N U REAR COVER.
ND-71548 (E) CHAPTER 7 Page 397 Issue 2 WORK AFTER INST ALLA TION TESTS Figure 7-7 Front Cover Mounting Me thod (BASEU+LPR+PIM0) FRONT COVER.
CHAPTER 7 ND- 71548 (E) Page 398 Issue 2 WORK AFTER INST ALLA TION TESTS Figure 7-8 Front Cover Mounting Method (PIM) Mount the Front Cover onto the module using screws. FRONT COVER SCREW Note: The Fr ont Cover can be set to open to either the left side or right side.
ND-71548 (E) CHAPTER 7 Page 399 Issue 2 WORK AFTER INST ALLA TION TESTS Figure 7-9 Front Cover Mounte d Method (F ANU) FA N U FRONT COVER C(U).
CHAPTER 7 ND- 71548 (E) Page 400 Issue 2 WORK AFTER INST ALLA TION TESTS 4. A TT ACHMENT OF INTER-FRAME BRACKE TS This section covers how to attach inter-frame brackets between the cabinets.
ND-71548 (E) CHAPTER 7 Page 401 Issue 2 WORK AFTER INST ALLA TION TESTS <Attachment Procedure> STEP 1: Referring to the Figure 7-11 through Figure 7-11, fix the brackets (E) between the modules. Figure 7- 1 1 How to A ttach Inter-frame Brackets STEP 2: Referring to Figure 7-11 and Figure 7-11, fix the brackets (A) with the screws.
CHAPTER 7 ND- 71548 (E) Page 402 Issue 2 WORK AFTER INST ALLA TION TESTS Figure 7-1 1 How to Attach Int er-frame Brackets (Continued) SL-C.P .B.M.S x 4 x 8 x 3GF Bracket (D) Bracket (A) Bracket (A) Bracket (B) Bracket (B) Bracket (B) Bracket (F) Bracket (F) (BASEU) (F ANU) (PIM) PL-C.
ND-71548 (E) CHAPTER 7 Page 403 Issue 2 WORK AFTER INST ALLA TION TESTS Figure 7-1 1 How to Attach Int er-frame Brackets (Continued) STEP 4: Referring to Figure 7-11 and Figure 7-11, fix the brackets (D) with the screws. STEP 5: Referring to Figure 7-11 and Figure 7-11, fix the brackets (F) with the screws.
CHAPTER 7 ND- 71548 (E) Page 404 Issue 2 WORK AFTER INST ALLA TION TESTS 5. SITE CLEANING Upon completion of the works described in Section 1 to 4 of this Chapte r, execute or confirm the following items: • Restore the cross connections arranged for t est purposes to their original conditions.
ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4 DATE MAY, 2002 DATE AUGUST, 2002 DATE DATE ISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8 DATE DATE DATE DATE NEAX2400 IPX Internet Protocol eXchange Installation Manual Revision Sheets 1/6 ND-71548(E) PA G E N o .
ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4 DATE MAY, 2002 DATE AUGUST, 2002 DATE DATE ISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8 DATE DATE DATE DATE NEAX2400 IPX Internet Protocol eXchange Installation Manual Revision Shee.
ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4 DATE MAY, 2002 DATE AUGUST, 2002 DATE DATE ISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8 DATE DATE DATE DATE NEAX2400 IPX Internet Protocol eXchange Installation Manual Revision Shee.
ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4 DATE MAY, 2002 DATE AUGUST, 2002 DATE DATE ISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8 DATE DATE DATE DATE NEAX2400 IPX Internet Protocol eXchange Installation Manual Revision Shee.
ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4 DATE MAY, 2002 DATE AUGUST, 2002 DATE DATE ISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8 DATE DATE DATE DATE NEAX2400 IPX Internet Protocol eXchange Installation Manual Revision Shee.
ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4 DATE MAY, 2002 DATE AUGUST, 2002 DATE DATE ISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8 DATE DATE DATE DATE NEAX2400 IPX Internet Protocol eXchange Installation Manual Revision Shee.
Ein wichtiger Punkt beim Kauf des Geräts NEC 2400 ipx (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie NEC 2400 ipx noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für NEC 2400 ipx - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von NEC 2400 ipx reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über NEC 2400 ipx erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon NEC 2400 ipx besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von NEC 2400 ipx verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit NEC 2400 ipx. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei NEC 2400 ipx gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.