
This document contains drawings, replacement parts lists and instructions for installing panel mount models of 920i indicators. See the 920i Installation Manual, PN 67887, for general installation, configuration and calibration information.
Use a wrist strap for grounding and to protect components from electrostatic discharge (ESD) when working inside the indicator enclosure.
This unit uses double pole/neutral fusing which could create an electric shock hazard. Procedures requiring work inside the indicator must be performed by qualified service personnel only.
11.56"
10.51"
Outer Perimeter of Exterior Faceplate (Solid Line)
Panel Cutout (Dashed Line)
9.16"
Illustration is not to scale, dimensions
8.02"
are for reference only.
Interior Housing (Dotted Line)
Figure 1. Panel Cutout for Panel Mount Enclosure
PN 69989 Rev B April 20, 2018

Installation Use the dimensions shown in Figure 1 to lay out the panel cutout for the panel mount enclosure. See Figure 2 for enclosure dimensions.

Figure 2. Panel Mount Enclosure Dimensions
Once the cutout has been prepared:

Figure 3. Clinching Bracket Assembly
© Rice Lake Weighing Systems ● All Rights Reserved 2


Panel is located between the front bezel and the reinforcing plate (not shown). The clinch bracket draws the front bezel against the panel when screws are tightened. Clinch Bracket
Figure 4. Panel Mount Enclosure
Grounding Except for the power cord, all cables routed through the cord grips should be grounded against the indicator enclosure.

Grounding Clamp Install lock washers first, against enclosure, under grounding clamp
Cabling Bar Use cable ties to bind cables to bar
Figure 5. Cable Installation with Grounding Clamp
3 Visit our website www.RiceLake.com

Foil Insulated Cable
Shield wire (cut) Silver side out
Length of foil before folding back on cable insulation
Figure 6. Foil Insulated Cable
Figure 7. Braided Insulated Cable
Load Cell Cables Cut the shield wire just past the grounding clamp. Shield wire function is provided by contact between the cable shield and the grounding clamp.
© Rice Lake Weighing Systems ● All Rights Reserved 4
Cut insulation here · Braid · Cut insulation here

Line Voltages 115 or 230 VAC Frequency 50 or 60 Hz Maximum Power Consumption 65W on secondary Primary power consumption:100W TRMS Constant current:1.5 A TRMS (115VAC);
1.0 A TRMS (230VAC) Fusing 115 VAC and 230 VAC North American 2 x 3.15A TR5 sub-miniature fuses Wickmann Time-Lag 19374 Series UL Listed, CSA Certified and Approved 230 VAC European 2 x 3.15A TR5 sub-miniature fuses Wickmann Time-Lag 19372 Series UL Recognized, Semko and VDE Approved See the 920i installation manual for additional specifications.
Parts Kit Contents Table 1-1 lists the parts kit contents for the panel mount version of the 920i.
Table 1-1. Parts Kit Contents
5 Visit our website www.RiceLake.com

© Rice Lake Weighing Systems Specifications subject to change without notice.
www.ricelake.com PN 69989 Rev B April 20, 2018
Besitzer und unser Team antworten in der Regel innerhalb eines Tages – und Ihre Frage hilft auch anderen weiter.
Stellen Sie die erste Frage — andere Nutzer oder unser Team antworten Ihnen.