DE
Offizielle Bedienungsanleitung

Green Cell Rack Tower UPS

130 Seiten·1.8 MB·Unterbrechungsfreie Stromversorgung (USV)·PDF·ENITNLJA
Green Cell Rack Tower UPS
Inhaltsverzeichnis 80 Abschnitte RACK TOWER 1KVA-3KVA UPS User’s manual · DE · BEDIENUNGSANLEITUNG · PL · … AnzeigenAusblenden
RACK TOWER 1KVA-3KVA UPS User’s manualp.1DEp.1BEDIENUNGSANLEITUNGp.1PLp.1INSTRUKCJA OBSŁUGIp.1FRp.1MODE D’EMPLOIp.1Table of contentsp.25 INTRODUCTIONp.26 SAFETY WARNINGSp.26 INSTALLATIONp.214 OPERATIONp.222 COMMUNICATIONp.225 UPS MAINTENANCEp.228 SPECIFICATIONSp.231 TROUBLESHOOTINGp.235 EINLEITUNGp.235 SICHERHEITSWARNUNGENp.236 INSTALLATIONp.244 BETRIEBp.253 ANSCHLUSSp.256 USV-WARTUNGp.258 TECHNISCHE DATENp.263 FEHLERBEHEBUNGp.267 WSTĘPp.267 OSTRZEŻENIA DOTYCZĄCE BEZPIECZEŃSTWAp.268 INSTALACJAp.276 EKSPLOATACJAp.285 POŁĄCZENIEp.288 KONSERWACJA UPSp.291 DANE TECHNICZNEp.296 ROZWIĄZYWANIE PROBLEMÓWp.299 INTRODUCTIONp.3100 CONSIGNES DE SÉCURITÉp.3100 INSTALLATIONp.3108 FONCTIONNEMENTp.3117 COMMUNICATIONp.3117 OPTIONS DE COMMUNICATION ET RACCORDS DE CONTRÔLEp.3122 CARACTÉRISTIQUES TECHNIQUESp.3127 DÉPANNAGEp.3Special Symbolsp.41 Introductionp.52 Safety Warningsp.6IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONSp.6DANGERp.63 Installationp.6INSPECTING THE EQUIPMENTp.6UNPACKING THE CABINETp.7CHECKING THE ACCESSORIESp.7RACKMOUNT INSTALLATIONp.7CHECKING THE RAIL KIT ACCESSORIES (OPTIONS)p.7TOOLS REQUIREDp.7RACKMOUNT SETUPp.8CAUTIONp.8TO INSTALL THE RAIL KIT:p.8RACKMOUNT WIRING INSTALLATIONp.9CONNECTING THE EBP (S)p.11RACKMOUNT CONVERTED TO TOWER INSTALLATIONp.123. UPSp.12UPS INITIAL STARTUPp.134 Operationp.14CONTROL COVER FUNCTIONSp.14FIG 18p.14DISPLAY FUNCTIONSp.16PARAMETERS INQUIRINGp.17USER SETTINGSp.18ECO FUNCTION SETTING (1)p.18BYPASS FUNCTION SETTING (2)p.18OUTPUT VOLTAGE SETTING (3)p.18BATTERY PACK (EBP)NUMBER AND TYPE SETTING (4)p.19LOAD SEGMENT SETTING(5)p.19EPO INPUT POLARITY SETTING(6)p.19FREQUENCY CONVERTER MODE SETTING (7)p.20MODE DESCRIPTION INDICATORp.20UPS Turn on and Turn offp.21START UP OPERATIONp.21TURN OFF OPERATIONp.21UPS+1EBP 3p.22UPS+2EBP 5p.22UPS+3EBP 7p.22
Page 1 of the Green Cell Rack Tower UPS user manual — DE
Seite 1 · Zum Vergrößern klicken
Seite 1

RACK TOWER 1KVA-3KVA UPS User’s manual

DE

BEDIENUNGSANLEITUNG

PL

INSTRUKCJA OBSŁUGI

FR

MODE D’EMPLOI

Page 2 of the Green Cell Rack Tower UPS user manual — Inhaltsverzeichnis
Seite 2 · Inhalt
Inhalt

Inhalt

RACK TOWER 1KVA-3KVA UPS User’s manualp.1DEp.1BEDIENUNGSANLEITUNGp.1PLp.1INSTRUKCJA OBSŁUGIp.1FRp.1MODE D’EMPLOIp.1Table of contentsp.25 INTRODUCTIONp.26 SAFETY WARNINGSp.26 INSTALLATIONp.214 OPERATIONp.222 COMMUNICATIONp.225 UPS MAINTENANCEp.228 SPECIFICATIONSp.231 TROUBLESHOOTINGp.235 EINLEITUNGp.235 SICHERHEITSWARNUNGENp.236 INSTALLATIONp.244 BETRIEBp.253 ANSCHLUSSp.256 USV-WARTUNGp.258 TECHNISCHE DATENp.263 FEHLERBEHEBUNGp.267 WSTĘPp.267 OSTRZEŻENIA DOTYCZĄCE BEZPIECZEŃSTWAp.268 INSTALACJAp.276 EKSPLOATACJAp.285 POŁĄCZENIEp.288 KONSERWACJA UPSp.291 DANE TECHNICZNEp.296 ROZWIĄZYWANIE PROBLEMÓWp.299 INTRODUCTIONp.3100 CONSIGNES DE SÉCURITÉp.3100 INSTALLATIONp.3108 FONCTIONNEMENTp.3117 COMMUNICATIONp.3117 OPTIONS DE COMMUNICATION ET RACCORDS DE CONTRÔLEp.3122 CARACTÉRISTIQUES TECHNIQUESp.3127 DÉPANNAGEp.3Special Symbolsp.41 Introductionp.52 Safety Warningsp.6IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONSp.6DANGERp.63 Installationp.6INSPECTING THE EQUIPMENTp.6UNPACKING THE CABINETp.7CHECKING THE ACCESSORIESp.7RACKMOUNT INSTALLATIONp.7CHECKING THE RAIL KIT ACCESSORIES (OPTIONS)p.7TOOLS REQUIREDp.7RACKMOUNT SETUPp.8CAUTIONp.8TO INSTALL THE RAIL KIT:p.8RACKMOUNT WIRING INSTALLATIONp.9CONNECTING THE EBP (S)p.11RACKMOUNT CONVERTED TO TOWER INSTALLATIONp.123. UPSp.12UPS INITIAL STARTUPp.134 Operationp.14CONTROL COVER FUNCTIONSp.14FIG 18p.14DISPLAY FUNCTIONSp.16PARAMETERS INQUIRINGp.17USER SETTINGSp.18ECO FUNCTION SETTING (1)p.18BYPASS FUNCTION SETTING (2)p.18OUTPUT VOLTAGE SETTING (3)p.18BATTERY PACK (EBP)NUMBER AND TYPE SETTING (4)p.19LOAD SEGMENT SETTING(5)p.19EPO INPUT POLARITY SETTING(6)p.19FREQUENCY CONVERTER MODE SETTING (7)p.20MODE DESCRIPTION INDICATORp.20UPS Turn on and Turn offp.21START UP OPERATIONp.21TURN OFF OPERATIONp.21UPS+1EBP 3p.22UPS+2EBP 5p.22UPS+3EBP 7p.22
Page 3 of the Green Cell Rack Tower UPS user manual — FR
Seite 3 · Zum Vergrößern klicken
Seite 3

FR

99 INTRODUCTION

100 CONSIGNES DE SÉCURITÉ

100 INSTALLATION

108 FONCTIONNEMENT

117 COMMUNICATION

117 OPTIONS DE COMMUNICATION ET RACCORDS DE CONTRÔLE

122 CARACTÉRISTIQUES TECHNIQUES

127 DÉPANNAGE

Page 4 of the Green Cell Rack Tower UPS user manual — Special Symbols
Seite 4 · Zum Vergrößern klicken
Seite 4

Special Symbols

The following are examples of symbols used on the UPS or accessories to alert you to important information:

RISK OF ELECTRIC SHOCK - Observe the warning associated with the risk of electric shock symbol.

This symbol indicates that you should not discard the UPS or the UPS batteries in the trash. This product contains sealed, lead‐acid batteries and must be disposed of properly. For more information, contact your local recycling/reuse or hazardous waste center.

This symbol indicates that you should not discard waste electrical or electronic equipment (WEEE) in the trash. For proper disposal, contact your local recycling/reuse or hazardous waste center.

Class B EMC Statements (High Voltage Models up to 3000 VA) FCC (Federal Communications Commision) Part 15

NOTE This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:

  • Reorient or relocate the receiving antenna.
  • ncrease the separation between the equipment and the receiver.
  • Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
  • Consult the dealer or an experienced radio/TV technician for help.
Page 5 of the Green Cell Rack Tower UPS user manual — 1 Introduction
Seite 5 · Zum Vergrößern klicken
Seite 5

1 Introduction

This UPS protects your sensitive electronic equipment from most common power problems, including power failures, power sags, power surges, brownouts, line noise, high voltage spikes, frequency variations, switching transients, and harmonic distortion. Power outages might occur unexpectedly and power quality can be erratic. These power problems have potential to corrupt critical data, destroy unsaved work sessions, and damage hardware — causing hours of lost productivity and expensive repairs. With the UPS, you can safely eliminate the effects of power disturbances and guard the integrity of your equipment. Providing outstanding performance and reliability, the UPS’s unique benefi ts include:

  • True online double -conversion technology with high power density,utility frequency independence, and generator compatibility. Output power factor up to 0.9.
  • Three segment charging mode to increase battery service life, optimize recharge time.
  • Selectable High Effi ciency mode of operation.
  • Cold start function to startup the UPS without utility.
  • Standard communication options: one RS-232 communication port, one USB communication port, and relay output contacts or SNMP card.
  • Power Shedding function may turn off uncritical load in battery backup to make longer backup time for critical load.
  • Extended runtime with up to four Extended Battery Modules (EBPs) per UPS.
  • Emergency shutdown control through the Remote Emergency Power-off (EPO) port.
  • The content displayed on the interface is rich. The capacity of the loads and the battery can be seen directly and the FLASH pictures and fan rotating icon can be displayed while charging. Enhance, it is easy to know its operation status. When UPS fails, it can show the fault code; therefore, the UPS can be repaired as soon as possible by inquiring fault code table.
  • NOTICE: In the manual, RT is short for Rack-Tower conversion
  • Rack/Tower convertible LCD design. No matter what angle required, only pressing the key slightly to reach your perspective needs.
  • For RT model, it is equipped with hot swappable battery feature needed for 19”rack solution.
  • RT models in a space-optimizing 2U size fi ts any standard 19” rack.
Green Cell Rack Tower UPS — 1 Introduction diagram (page 5)
Abb. 1 · 1 Introduction
FIG 1The Rackmount UPS front view
Green Cell Rack Tower UPS — 1 Introduction diagram (page 5)
Abb. 2 · 1 Introduction
FIG 2The Rackmount EBP front view
Page 6 of the Green Cell Rack Tower UPS user manual — INSPECTING THE EQUIPMENT
Seite 6 · Zum Vergrößern klicken
Seite 6

2 Safety Warnings

IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

This manual contains important instructions that you should follow during installation and maintenance of the UPS and batteries. Please read all instructions before operating the equipment and save this manual for future reference.

DANGER

The UPS contains LETHAL VOLTAGES. All repairs and service should be performed by AUTHORIZED SERVICE PERSONNEL ONLY. There are NO USER SERVICEABLE PARTS inside the UPS.

  • WARNING
  • The UPS contains its own energy source (batteries). The UPS output may carry live voltage even when the UPS is not connected to an AC supply.
  • To reduce the risk of fi re or electric shock, install the UPS in a temperature and humidity controlled, indoor environment, free of conductive contaminants. Ambient temperature must not exceed 40°C (104°F). Do not operate near water or excessive humidity (90% maximum).
  • To reduce the risk of fi re, connect only to a circuit provided with branch circuit overcurrent protection in accordance with the National Electrical Code (NEC), ANSI/NFPA 70.
  • Output overcurrent protection and disconnect switch must be provided by others.
  • To comply with international standards and wiring regulations, the sum of the leakage current of the UPS and the total equipment connected to the output of the UPS must not have an earth leakage current greater than 3.5 milliamperes.
  • If installing optional rackmount EBP (s), install the EBP (s) directly below the UPS so that all wiring between the cabinets is installed behind the front covers and is inaccessible to users. The maximum number of EBP (s) per UPS is four.
  • If the UPS requires any type of transportation, verify that the UPS is unplugged and turned off and then disconnect the UPS internal battery connector.
  • CAUTION
  • Batteries can present a risk of electrical shock or burn from high short-circuit current. Observe proper pre CAUTION s. Servicing should be performed by qualifi ed service personnel knowledgeable of batteries and required precautions. Keep unauthorized personnel away from batteries.
  • Proper disposal of batteries is required. Refer to your local codes for disposal requirements.
  • Never dispose of batteries in a fi re. Batteries may explode when exposed to fl ame.

3 Installation

This section explains:

  • Equipment inspection
  • Unpacking the cabinet
  • Checking the accessory kit
  • Cabinet installation
  • Wiring installation
  • Initial startup

INSPECTING THE EQUIPMENT

If any equipment received has been damaged during shipment, keep the shipping cartons and packing materials for the carrier or place of purchase and fi le a claim for shipping damage. If you discover damage after acceptance, fi le a claim for concealed damage.

To fi le a claim for shipping damage or concealed damage: 1) File with the carrier within 15 days of receipt of the equipment; 2) Send a copy of the damage claim within 15 days to your service representative.

Page 7 of the Green Cell Rack Tower UPS user manual — TOOLS REQUIRED
Seite 7 · Zum Vergrößern klicken
Seite 7

UNPACKING THE CABINET

  • CAUTION
  • Unpacking the cabinet in a low-temperature environment may cause condensation to occur in and on the cabinet. Do not install the cabinet until the inside and outside of the cabinet are absolutely dry (hazard of electric shock).
  • The cabinet is heavy. Be careful to unpack and move the cabinet. Carefully to move and open the carton. Keep the components packaged until ready to install.

To unpack the cabinet and accessories: 1. Open the outer carton and remove the accessories packaged with the cabinet. 2. Carefully lift the cabinet out of the outer carton. 3. Discard or recycle the packaging in a responsible manner, or store it for future use.

Place the cabinet in a protected area that has adequate airfl ow and is free of humidity, fl ammable gas, and corrosion.

CHECKING THE ACCESSORIES

It includes:

  • UPS user’s guide
  • Software Suite CD
  • USB cable
  • Power cord (Input and output)
  • RS232 cable

If you ordered an optional Extended Battery Module (EBP), verify that the following additional item is included with the EBP:

  • EBP user’s guide

RACKMOUNT INSTALLATION

The Rackmount cabinet comes with all of the hardware required for installation in a standard EIA or JIS seismic Rackmount confi guration with square and round mounting holes. The rail assemblies adjust to mount in 19” racks with a distance from front to rear around 70~76 cm (27 to 30 inches) deep.

CHECKING THE RAIL KIT ACCESSORIES (OPTIONS)

Verify that the following rail kit items are included for each cabinet:

  • Left rail assembly: - Left rail - Rear rail - (3) M5_8 pan-head screws
  • Right rail assembly: - Right rail - Rear rail - (3) M5_8 pan-head screws
  • Rail hardware kit: - (8) M5 butterfl y nuts - (2) rear stop brackets - (8) M5 umbrella nuts
  • Mounting bracket kit: - (2) mounting brackets - (8) M4_8 fl at-head screws

TOOLS REQUIRED

To assemble the components, the following tools may be needed:

  • cross-shaped screwdriver
  • and 6 mm wrench or socket
Page 8 of the Green Cell Rack Tower UPS user manual — TO INSTALL THE RAIL KIT:
Seite 8 · Zum Vergrößern klicken
Seite 8

RACKMOUNT SETUP

CAUTION

The cabinet is heavy. Removing the cabinet from its carton requires a minimum of two people.

If installing optional EBP (S), make sure to install the EBP (S) directly below the UPS so that all wiring between the cabinets is installed behind the front covers and inaccessible to users.

TO INSTALL THE RAIL KIT:

Green Cell Rack Tower UPS — TO INSTALL THE RAIL KIT: diagram (page 8)
Abb. 3
1. Real Rails
2. M5 Butterfl y Nuts (8 places)
3. Left Rail
4. Right Rail
FIG 3Securing the Rails
1. Assemble the left and right rails to the rear rails as shown in FIG.3.Do not tighten the screws. Adjust each rail size for the depth of your rack. 2. Select the proper size in the rack for positioning the UPS (see FIG. 4). The rail occupies four positions on the front and rear of the rack. 3. Tighten four M5 Umbrella Nuts in the side of rail assembly (see FIG. 3).
Green Cell Rack Tower UPS — TO INSTALL THE RAIL KIT: diagram (page 8)
Abb. 4
1. Front of Rack
2. M5x12 Pan-Head Screws (8 places)
3. M5 Float nuts (8 places)
4. Tighten adjustment nuts after rail attachment (4 places each rail.)
FIG 4Fixing the Rails

4. Fix one rail assembly to the front of the rack with one M5×12 pan-head screw and one M5 cage nut. Using two M5 cage nuts and two M5×12 pan-head screws, to fi x the rail assembly to the rear of the rack. 5. Repeat Steps 3 and 4 for the other rail assembly. 6. Tighten the four butterfl y nuts in the middle of each rail assembly. 7. If installing optional cabinets, repeat Step 1 through Step 6 for each rail kit. 8. Place the UPS on a fl at, stable surface with the front of the cabinet facing to you.

Page 9 of the Green Cell Rack Tower UPS user manual — RACKMOUNT WIRING INSTALLATION
Seite 9 · Zum Vergrößern klicken
Seite 9
Green Cell Rack Tower UPS — RACKMOUNT WIRING INSTALLATION diagram (page 9)
Abb. 5
1. Mounting Bracket
2. M4x8 Flat-Head Screws (4 places)
FIG 5Installing the Mounting Brackets

9. Align the mounting brackets with the screw holes on each side of the UPS and fi x with the supplied M4×8 fl at-he- ad screws (see FIG. 5) 10. If installing optional cabinets, repeat Step 8 and 9 for each cabinet. 11. Slide the UPS and any other optional cabinets into the rack. 12. Secure the front of the UPS to the rack using one M5×12 pan-head screws and one M5 cage nuts on each side (see FIG. 6).Install the bottom screw on each side through the bottom hole of mounting bracket and the bottom hole of the rail. 13. Repeat for any optional cabinets.

Green Cell Rack Tower UPS — RACKMOUNT WIRING INSTALLATION diagram (page 9)
Abb. 6
1. M5X12 Pan-Head Screws (2places)
2. M5 Float Nuts (2places)
FIG 6Securing the Front of the Cabinet

RACKMOUNT WIRING INSTALLATION

This section explains:

  • Installing the UPS, including connecting the UPS internal batteries
  • Connecting any Optional EBP (S)

To install the UPS:

1. Remove the front cover of each UPS Hold the cover part without LCD on the right side and extract it (see Fig.7)

Installing the UPS

Page 10 of the Green Cell Rack Tower UPS user manual — RACKMOUNT WIRING INSTALLATION
Seite 10 · Zum Vergrößern klicken
Seite 10
Green Cell Rack Tower UPS — RACKMOUNT WIRING INSTALLATION diagram (page 10)
Abb. 7
Green Cell Rack Tower UPS — RACKMOUNT WIRING INSTALLATION diagram (page 10)
Abb. 8
FIG 8Connecting the UPS Internal Batteries
FIG 7Extract UPS front cover
Green Cell Rack Tower UPS — RACKMOUNT WIRING INSTALLATION diagram (page 10)
Abb. 9
Green Cell Rack Tower UPS — RACKMOUNT WIRING INSTALLATION diagram (page 10)
Abb. 10
1. Battery
1. Top EBP Cable Knockout
2. Black wire
2. EBP Cover Hooks (2places)
3. Red wire
3. Insert the two thin-wall into the slot
FIG 9Long backup external battery connection FIG 10
2. Connect the internal battery connector (see FIG. 8) Connect red to red, Press the connector tightly together to ensure a proper connection.

Remarks: Please note above step 1 & 2 only for replacing batteries or adding the internal batteries. The plug will be connected properly if the UPS is with batteries installed.

3. If you are installing EBPS, see the following section, “Connecting the EBP (s),” before continuing with the UPS installation. 4. Replace the UPS front cover. To replace the cover, verify the EBP cable is routed through the knockout on the bottom of the cover if EBPS are installed. Put the front cover hooks of side with display to the cover port, put another side to the other two ports, then press it until the cover and the chassis are combined tightly. 5. If you are installing power management software, connect your computer to one of the communication ports or optional connectivity card. For the communication ports, use an appropriate cable. 6. If your rack has conductors for grounding or bonding of ungrounded metal parts, connect the ground cable (not supplied) to the ground bonding screw. See “Rear Covers” for the location of the ground bonding screw for each model.

Page 11 of the Green Cell Rack Tower UPS user manual — CONNECTING THE EBP (S)
Seite 11 · Zum Vergrößern klicken
Seite 11
7. If an emergency power-off (disconnect) switch is required by local codes, see “Remote Emergency Power-off” (REPO) to install the REPO switch before powering on the UPS. 8. Continue to “UPS Initial Startup”.

CONNECTING THE EBP (S)

To install the optional EBP (s) for a UPS:

1. 1. Remove the front cover of each EBP and UPS (see FIG. 10). It is the same with the installation of the front cover. (Refer” To install the UPS “) 2. On the bottom of the UPS front cover, remove the EBP cable knockout (see FIG. 11). 3. For the bottom (or only) EBP, remove the EBP cable knockout on the top of the EBP front cover. See FIG. 12 for the location of the top EBP cable knockout. 4. If you are installing more than one EBP, for each additional EBP remove the EBP cable knockout on the top and bottom of the EBP front cover. See FIG. 12 for the location of the EBP cable knockouts.

5. Plug the EBP cable (s) into the battery connector (s) as shown in FIG. 12. Up to four EBPS may be connected to the UPS. Connect black to black,. Press the connector tightly together to ensure a proper connection. To connect a second EBP, unclip the EBP connector on the fi rst EBP and pull gently to extend the wiring to the EBP connector on the second EBP. Repeat for any additional EBPS. 6. Verify that the EBP connections are tight and the adequate bend radius and strain relief exist for each cable. 7. Replace the EBP front cover. To replace the cover, verify that the EBP cables are routed through the EBP cover knockouts, cover connects with the cover hook near the left side of the EBP cabinet. Repeat for each additional EBP. It is the same with the installation of the front cover. (Refer” to UPS installation”) 8. Verify that all wires connected between the UPS and EBP (s) are installed behind the front covers and not acces- sible to users. 9. Return to Step 4 to continue the UPS installation.

Green Cell Rack Tower UPS — CONNECTING THE EBP (S) diagram (page 11)
Abb. 11
Green Cell Rack Tower UPS — CONNECTING THE EBP (S) diagram (page 11)
Abb. 12
FIG 11Removing the EBP Front Cover FIG 13: Typical EBP Installation
Green Cell Rack Tower UPS — CONNECTING THE EBP (S) diagram (page 11)
Abb. 13
1. Knock for EBP cable
FIG 12Removing the UPS Cable Knockout
Page 12 of the Green Cell Rack Tower UPS user manual — 3. UPS
Seite 12 · Zum Vergrößern klicken
Seite 12

RACKMOUNT CONVERTED TO TOWER INSTALLATION

Rackmount converted to Tower plastic base installation If an EBP is needed to be placed in the middle, the assembly of plastic base is similar.

The difference is that two 1U plastic base extended boards are added in the middle. (as the following shows)

Green Cell Rack Tower UPS — RACKMOUNT CONVERTED TO TOWER INSTALLATION diagram (page 12)
Abb. 14
Green Cell Rack Tower UPS — RACKMOUNT CONVERTED TO TOWER INSTALLATION diagram (page 12)
Abb. 15
1. / 2. plastic base brackets

A1 - plastic base brackets

A2 - 1U plastic base bracket etended board

Green Cell Rack Tower UPS — RACKMOUNT CONVERTED TO TOWER INSTALLATION diagram (page 12)
Abb. 16

3. UPS

4. Plastic base
Green Cell Rack Tower UPS — 3. UPS diagram (page 12)
Abb. 17
Green Cell Rack Tower UPS — 3. UPS diagram (page 12)
Abb. 18
FIG 14Plasic base bracket FIG 15 Increase EBP plastic base installation
Page 13 of the Green Cell Rack Tower UPS user manual — UPS INITIAL STARTUP
Seite 13 · Zum Vergrößern klicken
Seite 13
Green Cell Rack Tower UPS — UPS INITIAL STARTUP diagram (page 13)
Abb. 19
Green Cell Rack Tower UPS — UPS INITIAL STARTUP diagram (page 13)
Abb. 20
1. Battery
2. Black wire
3. Red wire
FIG 16The installation for UPS and battery box FIG 17: Long backup external battery connection

The installation between UPS and EBPS can be referred to Fig.16

1. Install the base, then place the RT UPS on the base one by one as Fig.16 shows. 2. The cover installation and cable connection of the UPS and EBPS are the same as RT. (To install the optional EBP (s) for a UPS)

UPS INITIAL STARTUP

To start up the UPS:

1. If optional EBPs are installed, verify that the EBPs are connected to the UPS. 2. Plug the equipment to be protected into the UPS, but do not turn on the protected equipment. 3. Make any necessary provisions for cord retention and strain relief. 4. Plug the detachable UPS power cord into the input connector on the UPS rear cover. 5. Plug the UPS power cord into a power outlet. The UPS front cover display illuminates. 6. The UPS will do self-test when power on. After that, the charger will charge the battery. If the output displayed on LCD is “0”, there is no output. If you need the UPS output the utility without starting the UPS when plug into the utility you need to set bPS option to “ON” on the setting mode. 7. Press the combination start up buttons on the UPS front cover for at least half a second. The UPS will start up and the LED will turn on and off sequentially. 8. Check the UPS front cover display for active alarms or notices. Resolve any active alarms before continuing. See Troubleshooting”. If the indicator is on, do not proceed until all alarms are clear.Check the UPS status from the front cover to view the active alarms. Correct the alarms and restart if necessary. 9. Verify that the indicator illuminates solid, indicating that the UPS is operating normally and any loads are powe- red. 10. If optional EBPs are installed, see “Confi guring Battery settings” to set the number of installed EBPs. 11. To change any other factory-set defaults, see “User settings”.

Page 14 of the Green Cell Rack Tower UPS user manual — FIG 18
Seite 14 · Zum Vergrößern klicken
Seite 14
12. If you installed an optional EPO, test the EPO function: Activate the external EPO switch. Verify the status change on the UPS display. Deactivate the external EPO switch and restart the UPS.

4 Operation

This chapter contains information on how to use the UPS, including front cover operation, operating modes, UPS startup and shutdown, transferring the UPS between modes, and confi guring bypass settings, load segments, and battery settings.

CONTROL COVER FUNCTIONS

The UPS has a three-button segmental LCD with backlight. It provides useful information about the UPS itself, load status, measurements, and settings (see FIG. 18).

Green Cell Rack Tower UPS — CONTROL COVER FUNCTIONS diagram (page 14)
Abb. 21

Red - ON The UPS has an active alarm or fault.

Yellow - ON The UPS is in Bypass mode. The UPS is opera- ting normally on bypass during High Effi ciency operation.

Yellow - ON The UPS is in Battery mode.

Green - ON The UPS is operating normally.

FIG 18

Table 2Button function

Start up combination RT Press and hold this key for more than half a second to turn on the UPS or to turn off the UPS.

Shutdown/Rotating combination RT Press and hold this key for more than 2 seconds to circumrota- te the LCD.

Battery test/Mute combination Press and hold the key for more than 1 second in Line mode or economic (ECO) mode: UPS runs self-test function. Press and hold the key for more than 1 second in battery mode: UPS runs mute function.

Scroll Non-function setting mode: Press and hold the key for more than half a second (less than 2 seconds): Indicate the items of the LCD item section orderly. Press and hold this key for more than 2 seconds: Circularly and orderly display the items every 2 seconds, when press and hold the key for some time again, it will turn to output status. Function setting mode: Press and hold the key for more than half a second (less than 2 seconds): Select the set option.

Setting entry Non-function setting mode: Press and hold the key for more than 2 seconds: Function setting interface. Function setting mode: Press and hold the key for more than half a second (less than 2 seconds): Affi rm the set option. Press and hold the key for more than 2 seconds, exit from this function setting interface.

Indicator Description · Button Function description

Page 15 of the Green Cell Rack Tower UPS user manual — 4 Operation
Seite 15 · Zum Vergrößern klicken
Seite 15
Table 3The corresponding working status of indications
Green Cell Rack Tower UPS — 4 Operation diagram (page 15)
Abb. 22 · 4 Operation

Power up or start Six times Affi rm if the battery is connected well

Once every 2 seconds Check if the fan is blocked by object.

8 Fault mode Long beeps If display fault code and iconli- ghts, contact for maintenance when you can’t deal with it by yourself.

- indicator lights for a long time - indicator fl ashes - the status of indicator depends on other conditions

Page 16 of the Green Cell Rack Tower UPS user manual — DISPLAY FUNCTIONS
Seite 16 · Zum Vergrößern klicken
Seite 16

DISPLAY FUNCTIONS

As the default or after 5 minutes of inactivity, the LCD displays the output parameters. The backlit LCD automatically dims after 5 minutes of inactivity. Press any button to restore the screen. LCD display comprises numerical value section, capacity graphics section, fan-status graphics section and charger- -status graphics section , refer to Table 4 for detail.

Table 4LCD display section

Numerical value section Display the corresponding numeri- cal value of inquiring items (output, load, temperature, input, battery), for example, as the graphics shows above, the output voltage is 230v, the output frequency is 50Hz.

Green Cell Rack Tower UPS — DISPLAY FUNCTIONS diagram (page 16)
Abb. 23

Capacity graphics section Display the capacity of the battery and load. Every pane represents 20%capacity. As graphics shown above, the load reaches 80%-100% (5 panes), the capacity of the batte- ry is 40%-60% (3 panes). When UPS is overloaded, the icon will fl ash, when battery is weak or disconnec- ted, the icon will also fl ash.

Green Cell Rack Tower UPS — DISPLAY FUNCTIONS diagram (page 16)
Abb. 24

Fan-status graphics section Display if the fan works normally. When the fan works normally, it will show the dynamic fan blades rotating; when the fan works ab- normally, the icon will keep on fl ashing with the WARNING.

Green Cell Rack Tower UPS — DISPLAY FUNCTIONS diagram (page 16)
Abb. 25

Charger-status graphics section Display the status of the charger. When charger works normally, the corresponding icon will vary dynamically and orderly. when charger works abnormally, the icon will keep fl ashing When UPS is in battery mode, the number of the icons of the charger- -state section will vary according to the changeable capacity of the battery (pane).

Green Cell Rack Tower UPS — DISPLAY FUNCTIONS diagram (page 16)
Abb. 26

Section Description Graphic

Page 17 of the Green Cell Rack Tower UPS user manual — PARAMETERS INQUIRING
Seite 17 · Zum Vergrößern klicken
Seite 17

PARAMETERS INQUIRING

Press and hold the scroll key or for more than half a second (less than 2 seconds) to inquire about items. The inquired items include input, battery, output, load, temperature. Press and hold the scroll key for more than 2 seconds, LCD begins to display the items circularly and orderly which transfer to another every 2 seconds. Press and hold the key for some time again, it will return to output status.

Table 5Parameters inquiring

Output Display the output voltage and output frequency of the UPS. As the following graphic shown, the output voltage is 230v & the output frequency is 50Hz.

Green Cell Rack Tower UPS — PARAMETERS INQUIRING diagram (page 17)
Abb. 27

Load Display the numerical value of the active power (WATT) and apparent power (VA) of the load. For example, as the following graphics shown: the WATT of the load is 100w, VA is 100VA (when disconnect load, it is a normal phenome- non to show a small numerical value of WATT and VA).

Green Cell Rack Tower UPS — PARAMETERS INQUIRING diagram (page 17)
Abb. 28

Temperature Display the temperature of the inverter in the UPS. As the following graphics shown: the temperature of the inverter is 37°C.

Green Cell Rack Tower UPS — PARAMETERS INQUIRING diagram (page 17)
Abb. 29

Input Display the voltage and frequency of the input. As the following graphics shown: the input voltage is 210v, input frequency is 49.8Hz.

Green Cell Rack Tower UPS — PARAMETERS INQUIRING diagram (page 17)
Abb. 30

Battery Display the voltage and capacity of the battery. As the following graphics shown: the battery voltage is 38v, the capacity of battery is 100฀ (the capacity of battery is approximately recko- ned according to the battery voltage).

Green Cell Rack Tower UPS — PARAMETERS INQUIRING diagram (page 17)
Abb. 31

Item Description Graphic

Page 18 of the Green Cell Rack Tower UPS user manual — OUTPUT VOLTAGE SETTING (3)
Seite 18 · Zum Vergrößern klicken
Seite 18

USER SETTINGS

The UPS has setting functions. This user settings can be done under any kind of UPS working mode. The setting will take effect under certain condition. Below table describes how to set the UPS.

Table 6. User Settings

ECO FUNCTION SETTING (1)

1. Enter the setting interface. Press and hold the function setting key for more than 2 seconds, then come to setting interface, the letters “ECO” will fl ash. 2. Enter the ECO setting interface. Press and hold the function setting key for more than half a second (less than 2 seconds), the letters “ECO” will stop fl ash. The “ON” (or OFF) below the ECO will fl ash. Press and hold the scroll keyfor more than half a second (less than 2 seconds) to determine whether the ECO function is enabled or disabled. 3. Confi rm the ECO selecting interface. After selecting ON or OFF, press and hold the function setting key for more than half a second (less than 2 seconds). Now, the ECO setting function is completed and the “ON” or “OFF” below the “ECO” will light without fl ash. 4. If you choose “OFF”, then go to step 7, otherwise go ahead to step 5. 5. Set the ECO tolerance range. Short press the scroll keyorfor more than half a second (shorter than 2 seconds)to select the voltage range in percentage. +5%,+10%,+15%,+25% (default is +25%) then short press function setting key for more than half a second (shorter than 2 seconds)to confi rm the selection, then to set the minus range 6. To set the minus range in the same way. 7. After the minus range is confi rmed. Long press function setting key for more than 2 seconds to exit setting menu.

Green Cell Rack Tower UPS — ECO FUNCTION SETTING (1) diagram (page 18)
Abb. 32

BYPASS FUNCTION SETTING (2)

1. Enter the setting interface. Press and hold the function setting key for more than 2 seconds, then come to setting interface ,short press the scroll keyfor more than half a second (less than 2 seconds) to select BPS setting, the letters “bPS” will fl ash. 2. Enter the BPS setting interface. Press and hold the function setting key for more than half a second (less than 2 seconds) at this time, the letters “bPS” will stop fl ashing. The “ON” (or OFF) below the bPS will fl ash. Press and hold the scroll keyfor more than half a second (less than 2 seconds) to determine whether the BPS function is enabled or disabled. 3. Confi rm the BPS selecting interface. After selecting ON or OFF, press and hold the function setting key for more than half a second (less than 2 seconds). Now, the BPS setting function is completed and the “ON” or “OFF” below the “bPS” will light without fl ashing. 4. If you choose “OFF”, then go to step 7, otherwise go ahead to step 5. 5. Set the BPS tolerance range. Short press the scroll keyorfor more than half a second (shorter than 2 seconds)to select the voltage range in percenta- ge. +5%,+10%,+15%,+25% (default is +25%) then short press function setting key for more than half a second (shorter than 2 seconds)to confi rm the selection, then to set the minus range 6. To set the minus range in the same way. 7. After the minus range is confi rmed. Long press function setting key for more than 2 seconds to exit setting menu.

Green Cell Rack Tower UPS — BYPASS FUNCTION SETTING (2) diagram (page 18)
Abb. 33

OUTPUT VOLTAGE SETTING (3)

1. Enter the setting interface. Press and hold the function setting key for more than 2 seconds, then come to setting interface, Press and hold the scroll keyfor more than half a second (less than 2 seconds), select the function setting, choose output voltage setting interface, at the moment, the letters “OPU” will fl ash. 2. Enter the output voltage selecting interface. Press and hold the function set- ting key for more than half a second (less than 2 seconds), then come to setting interface of output voltage OPU, at this time, the letters “OPU” will light for a long time. The numerical value below the OPU will fl ash. Press and hold the scroll keyfor more than half a second (less than 2 seconds), se-

Green Cell Rack Tower UPS — OUTPUT VOLTAGE SETTING (3) diagram (page 18)
Abb. 34
Page 19 of the Green Cell Rack Tower UPS user manual — EPO INPUT POLARITY SETTING(6)
Seite 19 · Zum Vergrößern klicken
Seite 19

lect the numerical value in accordance with “OPU” function. The provided voltages are 208v, 220v, 230v, 240,you can choose any one of them by yourself (The default is 220v). 3. Confi rm the output voltage selecting interface. After selecting numerical value, press and hold the function set- ting key for more than half a second (less than 2 seconds). Now, the OPU setting function is completed and the numerical value below the “OPU” will light without fl ashing. 4. Exit from the setting interface. Press and hold function setting key for more than half a second (less than 2 seconds), exit from the setting interface and return to main interface.

BATTERY PACK (EBP)NUMBER AND TYPE SETTING (4)

1. Enter the setting interface. Press and hold the function setting key for more than 2 seconds, then come to setting interface, Press and hold the scroll keyfor more than half a second (less than 2 seconds), select the function setting, choose battery setting interface, at the moment, the letters “bAt” will fl ash. 2. Enter the battery setting interface. Press and hold the function setting key for more than half a second (less than 2 seconds), then come to setting interface of battery, the letters “bAt” will stop fl ashing. The numerical value below the “bAt” will fl ash. Press and hold the scroll keyfor more than half a second (less than 2 seconds), select the numerical value in accordance with the real connected battery strings. 3. Confi rm the battery strings setting interface. After selecting numerical value, press and hold the function setting key for more than half a second (less than 2 seconds). Now, the battery strings setting is confi rmed and the battery type value below will fl ash 4. Set the battery type in the same way. 5. Exit from the setting interface. Press and hold function setting key for more than half a second (less than 2 seconds), exit from the setting interface and return to main interface.

Green Cell Rack Tower UPS — BATTERY PACK (EBP)NUMBER AND TYPE SETTING (4) diagram (page 19)
Abb. 35

LOAD SEGMENT SETTING(5)

1. Enter the setting interface. Press and hold the function setting key for more than 2 seconds, then come to setting interface, Press and hold the scroll keyfor more than half a second (less than 2 seconds), select the function setting, choose battery setting interface, at the moment, the letters “Seg 1” will fl ash. 2. Enter the load segment setting interface. Press and hold the function setting key for more than half a second (less than 2 seconds), then come to setting interface of load segment, the letters “Seg 1” will stop fl ashing. The numerical value below the “Seg 1” will fl ash. Press and hold the scroll keyfor more than half a second (less than 2 seconds), select the battery voltage, 10.5v 11.0v 11.5v (default is 10.5v) 3. Confi rm the power shedding shielding battery voltage setting. After selecting numerical value, press and hold the function setting key for more than half a second (less than 2 seconds). Now, the load shielding battery voltage setting is confi rmed. 4. Exit from the setting interface. Press and hold function setting key for more than half a second (less than 2 seconds), exit from the setting interface and return to main interface.

Green Cell Rack Tower UPS — LOAD SEGMENT SETTING(5) diagram (page 19)
Abb. 36

EPO INPUT POLARITY SETTING(6)

1. Enter the setting interface. Press and hold the function setting key for more than 2 seconds, then come to setting interface, Press and hold the scroll keyfor more than half a second (less than 2 seconds), select the function setting, cho- ose EPO Input polarity setting interface, the letters “EPO” will fl ash. 2. Enter the EPO Input Polarity setting interface. Press and hold the function setting key for more than half a second (less than 2 seconds) , the letters “EPO” will stop fl ashing. The letters below the “EPO” will fl ash. Press and hold the scroll keyfor more than half a second (less than 2 seconds), select the EPO input polarity, “+P” (open circuit execute EPO function) or “–P” (short circuit execute EPO function) 3. Confi rm the setting. After selecting EPO input polarity, press and hold the func- tion setting key for more than half a second (less than 2 seconds). Now, the setting is confi rmed. 4. Exit from the setting interface. Press and hold function setting key for more than half a second (less than 2 seconds), exit from the setting interface and return to main interface.

Green Cell Rack Tower UPS — EPO INPUT POLARITY SETTING(6) diagram (page 19)
Abb. 37
Page 20 of the Green Cell Rack Tower UPS user manual — MODE DESCRIPTION INDICATOR
Seite 20 · Zum Vergrößern klicken
Seite 20

FREQUENCY CONVERTER MODE SETTING (7)

1. Enter the setting interface. Press and hold the function setting key for more than 2 seconds, then come to setting interface, Press and hold the scroll keyfor more than half a second (less than 2 seconds), select the func- tion setting, choose output frequency setting interface, the letters “OPF” will fl ash. 2. Enter the output frequency of converter mode setting interface. Press and hold the function setting key for more than half a second (less than 2 seconds) , the letters “OPF” will stop fl ashing. The letters below the “OPF” will fl ash. Press and hold the scroll keyfor more than half a second (less than 2 seconds), select the output frequency, “50Hz” (output fi xed to 50Hz and active converter mode) or “60Hz” (output fi xed to 60Hz and active converter mode) or “IPF” (inactive converter mode and active normal mode) 3. Confi rm the setting. After selecting converter mode output frequency, press and hold the function setting key for more than half a second (less than 2 seconds). Now, the setting is confi rmed. 4. Exit from the setting interface. Press and hold function setting key for more than half a second (less than 2 seconds), exit from the setting interface and return to main interface. IPF:UPS output frequency with the same frequency as the mains input. 50.0Hz:UPS output frequency is fi xed at 50.0Hz, independent of the mains input frequency. 60.0Hz:UPS output frequency is fi xed at 60.0Hz, independent of the mains input frequency.

Table 7Operating Modes

MODE DESCRIPTION INDICATOR

Line Mode The inverter green LED is on.

When input AC mains is in line with the working conditions, UPS will work in line mode,charge the battery and protect the load.

Both the inverter green LED and battery yellow LED are on, the buzzer beeps once every 4 seconds. The WARNING red LED is on when beeping.

When the mains power down or instable, UPS will turn to battery mode at once. If the mains recovers,the UPS will transfer to line mode.

If battery low alarm activates, the indicator of fl ashes. If battery voltage reaches low limit, UPS will turn off to protect the battery. UPS will auto-restart when the mains recover.

Bypass yellow LED is on, the buzzer beeps once every 2 minutes. The WARNING red LED is on when beeping, LCD displays are accor- ding to the exact load and battery capacity. Bypass tolerance can be set by LCD. Under below conditions, the UPS will transfer to bypass mode:

  • BPS on set by user through LCD, and the UPS is turned off.
  • BPS on set by user through LCD, and the UPS is plugged into utility but not turned on.
  • Overload on line mode or ECO mode. NOTE : When in bypass mode , the load is not protected.

ECO Mode Both the inverter green LED and bypass yellow LED are on.

When ECO enabled and the utility is in range, the UPS will work on ECO mode. If the utility in out of ECO range but still in Line range, the UPS will transfer to line mode.

Utility tolerance of ECO mode can be set.

Battery Mode · Bypass Mode

Page 21 of the Green Cell Rack Tower UPS user manual — TURN OFF OPERATION
Seite 21 · Zum Vergrößern klicken
Seite 21
Green Cell Rack Tower UPS — UPS Turn on and Turn off diagram (page 21)
Abb. 38 · UPS Turn on and Turn off

When the UPS has fault. The WARNING red LED is on and the buzzer beeps. The UPS will turn to fault mode. The UPS cuts off the output and the LCD display fault codes. At the moment, you can press the mute key to make the buzzer stop beeping temporarily to wait for maintenance. You can also press the OFF key to shut down the UPS when confi rm that there is no serious fault.

When UPS is plugged into line and not turn on , the UPS will work in standby mode to charge the battery. No indicator displays on this mode.

UPS Turn on and Turn off

START UP OPERATION

Turn on the UPS in line mode

1. Once mains power is plugged in, the UPS will charge the battery, at the moment, the LCD shows that the output voltage is 0, which means the UPS has no output. If it is expected to have the output of bypass, you can set the bps “ON” by LCD setting menu. 2. Press and hold the ON key for more than half a second to start the UPS, then it will start the inverter. 3. Once started, the UPS will perform a self-test function, LED will light and go out circularly and orderly. When the self-test fi nishes, it will come to line mode, the corresponding LED lights, the UPS is working in line mode.

Turn on the UPS by DC without mains power

1. When mains power is disconnected, press and hold the ON key for more than half a second to start UPS. 2. The operation of the UPS in the process of start is almost the same as that when mains power is in. After fi nishing the self-test, the corresponding LED lights and the UPS is working in battery mode.

TURN OFF OPERATION

Turn off the UPS in line mode

1. Press and hold the OFF key for more than half a second to turn off the UPS and inverter. 2. After the UPS shutdown, the LEDs go out and there is no output. If output is needed, you can set bps “ON” on the LCD setting menu.

Turn off the UPS by DC without mains power

1. Press and hold the OFF key for more than half a second to turn off the UPS. 2. When turning off the UPS, it will do self-testing fi rstly. The LEDs light and go out circularly and orderly until there is no display on the cover.

UPS self-test/mute test operation

1. When the UPS is in line mode, press and hold the self-test/mute key for more than 1 second, the LEDs light and go out circularly and orderly. The UPS comes to self-test mode and tests its status. It will exit automatically after fi nishing testing, and the LED indication will go back to previous status. 2. When the UPS is in battery mode, press and hold the self-test/mute key for more than 1 second, the buzzer stops beeping. If you press and hold the self-test/mute key for one more second, it will restart to beep again.

Fault Mode · Standby Mode

Page 22 of the Green Cell Rack Tower UPS user manual — 9. EPO
Seite 22 · Zum Vergrößern klicken
Seite 22

CONFIGURING BATTERY SETTINGS Set the UPS for the number of EBPs installed. To ensure maximum battery runtime, confi gure the UPS for the correct number of EBPs, refer to Table 8 for the appropriate setting of battery numbers and type. Use the up and down scroll keys to select the number of battery strings according to your UPS confi guration:

Table 8Battery number Confi guration

All UPS and EBP Cabinets Number of Battery Strings

UPS only (internal batteries) 1 (default)

UPS+1EBP 3

UPS+2EBP 5

UPS+3EBP 7

UPS+4EBP 9

  • CAUTION
  • The following process must be performed if the UPS is connected with generator.
  • First, turn on the generator, after it runs stably connect output power of the generator to UPS input terminal, then turn on the UPS. After the UPS is turned on, please connect load one by one.
  • It is recommended that the generator capacity is as twice as the UPS rated capacity.
  • You had better not use the ECO mode when the quality of the input AC mains is not good.

5 Communication

This section describes the:

  • Communication ports (RS-232 and USB)
  • Connectivity cards
  • Emergency Power-off (EPO)
  • Load Segments
  • UPSilon2000 Power Management Software

FIG 20

Green Cell Rack Tower UPS — FIG 20 diagram (page 22)
Abb. 39
1. Output Socket
2. Battery Socket
3. Internal SNMP Slot
4. Net Surge Protect (optional)
Green Cell Rack Tower UPS — FIG 20 diagram (page 22)
Abb. 40
5. Fan

6. RS232, USB

7. AC Input
8. Input Breaker

9. EPO

Page 23 of the Green Cell Rack Tower UPS user manual — CONNECTIVITY CARDS
Seite 23 · Zum Vergrößern klicken
Seite 23

COMMUNICATION OPTIONS AND CONTROL TERMINALS

Installing Communication Options and Control Terminals

To install the communication options and control terminals:

1. Install the appropriate connectivity card and/or necessary cable (s) and connect the cables to the appropriate location. 2. Route and tie the cable (s) out of the way. 3. Continue to “Operation” to start up the UPS.

The UPS has serial communication capabilities through the USB and RS-232 communication ports or through a con- nectivity card in the available communication bay. The UPS supports two serial communication devices according to the following table:

Communication Bay USB RS-232

Any connectivity card Available Not in use

Not in use Available

Green Cell Rack Tower UPS — COMMUNICATION OPTIONS AND CONTROL TERMINALS diagram (page 23)
Abb. 41

RS-232 AND USB COMMUNICATION PORTS

To establish communication between the UPS and a computer, connect your computer to one of the UPS communication ports using an appropriate communication cable (not supplied). See FIG. 19, 20 for the communication port locations.

When the communication cable is installed, power management software can exchange data with the UPS. The software polls the UPS for detailed information on the status of the power environment. If a power emergency occurs, the software initiates the saving of all data and an orderly shutdown of the equipment. The cable pins for the RS-232 communication port are identifi ed in FIG. 21 and the pin functions are described in Table 9.

Table 9RS-232 Communication Port Pin Assignment

Pin Number Function Defi nition Direction from the UPS

1/4/6/7/8/9 No use -

2 RxD (Transmit to external device) Out

3 TxD (Receive from external device) In

5 GND (Signal cimmon) -

CONNECTIVITY CARDS

Connectivity cards allow the UPS to communicate in a variety of networking environments and with different types of devices. The UPS has one available communication bay for the following connectivity cards:

  • Web/SNMP Card - has SNMP and HTTP capabilities as well as monitoring through a Web browser interface; connects to a twisted-pair Ethernet (10/100BaseT) network. In addition, a Environmental Monitoring Probe can be attached to obtain humidity, temperature, smoke alarm, and security information.
  • Relay Interface Card - has isolated dry contact relay outputs for UPS status: Utility failure, Low battery, UPS alarm/ OK, or On bypass.

See FIG. 19, 20 for the location of the communication bay.

Communication Options · Independent Multiplxed

Page 24 of the Green Cell Rack Tower UPS user manual — 1 + POLARITY
Seite 24 · Zum Vergrößern klicken
Seite 24
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 24)
Abb. 42
FIG 22Optional Connectivity Cards

EMERGENCY POWER-OFF

EPO is used to shut down the UPS from a distance. This feature can be used for shutting down the load and the UPS by thermal relay, for instance in the event of room overtemperature. When EPO is activated, the UPS shuts down the output and all its power converters immediately. The UPS remains on to alarm the fault.

There is also a front panel EPO option for user to initial EPO function by pressing the three switch on the front panel together. When the three switches is pressed down at the same time, the EPO function will be active, UPS will shut down and the buzzer will long beep. Pressing startup switches will not turn on the UPS unless the EPO function is deactivated by pressing the three switches together and press off switches to return normal status.

  • CAUTION
  • The EPO must not be connected to any utility connected circuits. Reinforced insulation to the utility is required. The EPO switch must have a minimum rating of 24 Vdc and 20 mA and be a dedicated latching-type switch not tied into another circuit. The EPO signal must remain active for at least 250 ms for proper operation.
  • To ensure the UPS stops supplying power to the load during any mode of operation, the input power must be disconnected from the UPS when the emergency power-off function is activated.

Wire Function Terminal Wire Size Rating Suggested Wire Size

EPO L1 4–0.32 mm2 (12–22 AWG) 0.82 mm2 (18 AW)

See FIG. 19, 20 for EPO location. FIG. 23 shows a schematic of the EPO connector contacts.

1 + POLARITY

2 - POLARITY EPO

Abb. 23 EPO Connections

EPO Connections

Page 25 of the Green Cell Rack Tower UPS user manual — STORING THE UPS AND BATTERIES
Seite 25 · Zum Vergrößern klicken
Seite 25

LOAD SEGMENTS

Green Cell Rack Tower UPS — LOAD SEGMENTS diagram (page 25)
Abb. 43

Load segments are sets of receptacles that can be controlled by power management softwa- re or through the display, providing an orderly shutdown and startup of your equipment. For example, during a power outage, you can keep critical equipment running while you turn off other equipment. This feature allows you to save battery power.

Each UPS has two load segments:

  • Load Segment 1: The power shedding battery voltage of this segment can be set by LCD.
  • Load Segment 2.

FIG 24 Load Segments

UPSILON2000 POWER MANAGEMENT SOFTWARE

Each UPS ships with UPSilon2000 Power Management Software. To begin installing UPSilon2000 software, see the instructions accompanying the Software Suite CD.

UPSilon2000 software provides up-to-date graphics of UPS power and system data and power fl ow. It also gives you a complete record of critical power events, and it notifi es you of important UPS or power information. If there is a power outage and the UPS battery power becomes low, UPSilon2000 software can automatically shut down your computer system to protect your data before the UPS shutdown occurs.

6 UPS Maintenance

This section explains how to:

  • Care for the UPS and batteries
  • Replace Extended Battery Packs (EBPs)
  • Test new batteries
  • Recycle used batteries or UPS

UPS AND BATTERY CARE

For the best preventive maintenance, keep the area around the UPS clean and dust‐free. If the atmosphere is very dusty, clean the outside of the system with a vacuum cleaner. For full battery life, keep the UPS at an ambient tempe- rature of 25°C (77°F).

STORING THE UPS AND BATTERIES

If you store the UPS for a long period, recharge the battery every 6 months by connecting the UPS to utility power. The internal batteries charge to 80% capacity in less than 5 hours. However, we recommends that the batteries charge for

Page 26 of the Green Cell Rack Tower UPS user manual — RECYCLING THE USED BATTERY OR UPS
Seite 26 · Zum Vergrößern klicken
Seite 26

48 hours after long-term storage. If optional EBPs are installed, see the recharge times listed in Table 21. Check the battery recharge date on the shipping carton label. If the date is expired and the batteries were never recharged, do not use the UPS. Contact your service representative.

REPLACING BATTERIES

The EBP can be replaced when UPS is ON but be aware that if the utility fails at that time , the load of the UPS may NOT be protected. If you prefer to remove input power to change the batteries, see “UPS Turn on and Turn off”.

  • WARNING
  • Servicing should be performed by qualifi ed personel knowledgeable of batteries and required precautions. Keep unauthorized personnel away from batteries.
  • Batteries can present a risk of electrical shock or burn from high short circuit current. Oberve the following precaution: 1. Remove watches, rings, or other metal objects; 2. Use tools with insulated handles; 3. Do not lay tools or metal parts on top of batteries; 4. Wear rubber gloves and boots.
  • When replacing batteries, replace with the same type and number of batteries or battery packs. Contact your service reoresentative to order new batteries.
  • Proper disposal of batteries is required. Refer to your local codes for disposal requirements.
  • Never dispose of batteries in a fi re. Batteries may explode when exposed to fl ame.

REPLACING RT UPS AND EBPS

1. If the battery fault, the following steps are provided for modular unit to replace the new battery pack 2. Remove the front cover of the battery box. 3. Remove the connection cables between battery box and UPS. Release the screw of the baffl e of the battery pack as the Fig.25 shows, then remove the baffl e from the left or right. 4. Grasp the handle in front of the battery pack, take out of it and hold it, then remove the battery pack as fi g. 26 shown. 5. Hold the middle of the new battery pack, insert it. Once install the new battery pack, make sure it is completely inserted into the chassis as fi g 27 shown.

TESTING NEW BATTERIES

To test new batteries:

1. Plug the UPS into a power outlet for 48 hours to charge the batteries. 2. Start up the UPS by pressing the start up combination button. 3. Press the battery test combination button to activate the battery test. The UPS starts a battery test if the batteries are fully charged, the UPS is in Normal mode with no active alarms, and the bypass voltage is acceptable. During the battery test, the UPS transfers to Battery mode and discharges the batteries for 10 seconds. The LED indicators of the front cover stop cycling when the test is completed.

RECYCLING THE USED BATTERY OR UPS

Contact your local recycling or hazardous waste center for information on proper disposal of the used battery or UPS.

  • WARNING
  • Do not dispose of the battery or batteries in a fi re. Batteries may explode. Proper disposal of batteries is required. Refer to your local codes for disposal requirements.
  • Do not open or mutilate the battery or batteries. Released electrolyte is harmful to the skin and eyes. It may be toxic.
Page 27 of the Green Cell Rack Tower UPS user manual — UPS+1EBP 3
Seite 27 · Zum Vergrößern klicken
Seite 27
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 27)
Abb. 44
1. Insert the thin-wall into the slot.
2. M4X8 Pan-Head Screws (2places) FIG 25: The Installation for baffl e of battery pack
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 27)
Abb. 45
FIG 26Remove the battery park
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 27)
Abb. 46
1. Insert the thin-wall into the slot
2. M4X8 Pan -Head Screws (4 places)
FIG 27Installation for battery pack
Page 28 of the Green Cell Rack Tower UPS user manual — MODEL SPECIFICATIONS
Seite 28 · Zum Vergrößern klicken
Seite 28

7 Specifi cations

MODEL SPECIFICATIONS

This section provides the following specifi cations:

  • Communication options
  • Model lists
  • Weights and dimensions
  • Electrical input and output
  • Environmental and safety
  • Battery

Table 10:Communication Options (All Models)

Green Cell Rack Tower UPS — MODEL SPECIFICATIONS diagram (page 28)
Abb. 47

Communica tion Bay available independent communication bay for connectivity cards

Table 11Extended Battery Model
Green Cell Rack Tower UPS — MODEL SPECIFICATIONS diagram (page 28)
Abb. 48

EBP Model Confi guration Battery Voltage For Power Ratings

Table 12UPS Model List (All Models)
Green Cell Rack Tower UPS — MODEL SPECIFICATIONS diagram (page 28)
Abb. 49
Table 13Weights and Dimensions (All Models)
Green Cell Rack Tower UPS — MODEL SPECIFICATIONS diagram (page 28)
Abb. 50
Page 29 of the Green Cell Rack Tower UPS user manual — UPS+1EBP 3
Seite 29 · Zum Vergrößern klicken
Seite 29
Table 14Electrical Input (All Models)
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 29)
Abb. 51

Frequency Range 45–55 Hz (50Hz)/55-65Hz (60Hz) before transfer to battery

Bypass Voltage Range +5%,+10%,+15%,+25% (+25% by default),-20%,-30%,-45% (-45% by default)

Table 15Electrical Input (All Models)
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 29)
Abb. 52

Model Default Input Voltage/Current Selectable Input Voltages Voltage Range at 100% Load

1KVAS/1KVAH 230V / 4.4A 200, 208, 220, 230, 240 160 - 290Vac

1.5KVAS/1.5KVAH 230V / 6,5A 200, 208, 220, 230, 240 160 - 290Vac

2KVAS/2KVAH 230V / 8,7A 200, 208, 220, 230, 240 160 - 290Vac

3KVAS/3KVAH 230V / 13,0A 200, 208, 220, 230, 240 160 - 290Vac

Table 16Electrical Input Connections (All Models)
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 29)
Abb. 53
Table 17Electrical Output (All Models)
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 29)
Abb. 54

108%±5%–150%±5%: Load transfers to Fault mode after 30 seconds.

150%±5%–200%±5%: Load transfers to Fault mode after 300 ms.

>200%±5%: Load transfers to Fault mode after 20 ms.

100%±5%–130%±5%: Load transfers to Fault mode after 20 minutes.

130%±5%–150%±5%: Load transfers to Fault mode after 2 minutes.

150%±5%–200%±5%: Load transfers to Fault mode after 15 seconds.

>200%±5%: Load transfers to Fault mode after 140 ms.

Page 30 of the Green Cell Rack Tower UPS user manual — UPS+1EBP 3
Seite 30 · Zum Vergrößern klicken
Seite 30
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 30)
Abb. 55

108%±5%–150%±5%: Load transfers to Fault mode after 30 seconds.

150%±5%–200%±5%: Load transfers to Fault mode after 300 ms.

>200%±5%: Load transfers to Fault mode after 20 ms.

Harmonic Distortion

High Effi ciency mode10ms maximum (due to loss of utility)
Table 18Electrical Output Connections (All Models)
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 30)
Abb. 56
Table 19Environmental and Safety (All Models)
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 30)
Abb. 57

Operating Temperature 0°C to 40°C (32°F to 104°F) in Online mode, with linear derating for altitude

Page 31 of the Green Cell Rack Tower UPS user manual — 9. EPO
Seite 31 · Zum Vergrößern klicken
Seite 31

Storage Temperature -20°C to 40°C (-4°F to 104°F) with batteries

-25°C to 55°C (-13°F to 131°F) without batteries

Transit Temperature -25°C to 55°C (-13°F to 131°F)

Relative Humidity 0–90% noncondensing

Operating Altitude Up to 3,000 meters (9,843 ft) above sea level

REAR COVERS

1. Output Socket
2. Battery Socket
3. Internal SNMP Slot
4. Net Surge Protect (optional)

FIG 28

5. Fan

6. RS232, USB

7. AC Input
8. Input Breaker

9. EPO

FIG 29

8 Troubleshooting

The following messages are the information that users would fi nd on UPS when it meets some problems. Users can judge if the fault is caused by external factors and know how to deal with it by making full use of the information.

Fault indicator on, indicates that the UPS has detected some faults. Buzzer beeps, indicates that UPS need to be paid attention to, if beeps for a long time, it means that there is something wrong with the machine. If you need help, contact our service department, the following messages should be provided for analysis:

  • UPS MODEL NO. and SERIAL NO.
  • Date of fault happened
  • Detailed description of the problem (include indicator statements on cover)

Following table describes typical alarm conditions.

Page 32 of the Green Cell Rack Tower UPS user manual — UPS+1EBP 3
Seite 32 · Zum Vergrößern klicken
Seite 32

The “INPUT” letters on LCD display section fl ashes

Anti-connection of mains live and neutral or mains is out of range

Re-connect the input power cable and make a correct connection

Battery capacity indicator fl ashes Battery low voltage or battery disconnected

Check UPS battery, connect battery well, if battery damaged, replace it

Mains normal, but UPS has no input UPS input breaker open circuit Press the breaker for reset

Short back up time Battery not fully charged Keep UPS connecting with mains power for more than 8 hours, recharge battery

UPS overload Check the usage of loads, remove some redundant devices

Battery aged When replace battery, contact franchiser to get battery and relative assembly

UPS doesn’t startup after pressing the ON key

Didn’t press the combination keys of “on”

Press the two keys at the same time

UPS has no battery connected or battery voltage low and too many loads connected

Connect UPS battery well, if battery voltage low, please turn off UPS and remove some loads, then start UPS

Fault occurs inside UPS Contact supplier for servicing

The icon of charger status on LCD display fl ashes and buzzer beeps once per second

Charger doesn’t work normally or battery aged

Contact supplier for servicing

Table 23 · Fault Cause Solution

Page 33 of the Green Cell Rack Tower UPS user manual — UPS+1EBP 3
Seite 33 · Zum Vergrößern klicken
Seite 33
Table 24Warning and Fault Codes
Green Cell Rack Tower UPS — UPS+1EBP 3 diagram (page 33)
Abb. 58

Voltage error High positive voltage 5 1 40 80

Frage zu Green Cell Rack Tower UPS stellen

Besitzer und unser Team antworten in der Regel innerhalb eines Tages – und Ihre Frage hilft auch anderen weiter.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
Noch keine Fragen zu Green Cell Rack Tower UPS

Stellen Sie die erste Frage — andere Nutzer oder unser Team antworten Ihnen.

Originaldokument

Green Cell Rack Tower UPS PDF-Anleitung

130 Seiten·1.8 MB·Unterbrechungsfreie Stromversorgung (USV)·PDF
Klicken Sie oben auf eine Seite, um sie hier zu öffnen
Seite 1 / …
100%
Seiten werden geladen…