

Mount the hot water wall storage unit as described in the diagram. Observe the instructions in the text.You will find the diagrams at the beginning of the manual.
Mount close to the tap from which the most hot water will be extracted. A design proofed safety valve combination is to be installed. In addition, if water pressure exceeds 0.48 Mpa (4.8 bar), a pressure reducing valve is to be installed and adjusted accordingly. No shut-off valves may be installed between the safety modules and the reservoir. Discharge from the safety valve must always be open. The safety valve combination for closed operation must be accredited (design proofed):
Safety valve combination AK030300, i.e. safety valve combinations with pressure reducing valve AK040300 can be mounted with a customary thermostat pre-mixer.
An appropriate overflow mix regulator is to be installed:
BZ12410 wall temperature regulator with bath spout, shower hose and hand sprinkler; or BZ11110 wall regulator with shower hose and hand sprinkler. The discharge from the fitting must always be free. Never use an aerator! A back-flow preventer is to be installed in the cold water intake.
Wall Assembly (page II, diagrams 6 to 9)
The assembly diagram is on the packaging. To allow for replacement of the heating flange and anti-corrosion anode, at least 500m of free space must be left underneath the reservoir. Use appropriate screws with a diameter of at least 12mm. Provide a special supporting structure for lightweight walls.
Mount DG120 and DG150 with both mounting brackets. Vertically align DG80 and DG100 with the wall separator C.
Assembly Preparation · Closed Operation · Open Operation

Water Connection (page III / IV, diagrams 10 to 12)
Only detachable connections are permissible!
Before connecting the fittings, thoroughly flush out the water pipes in order to remove any impurities.
For closed operations, if the safety valve is not directly above the drain, then the drain pipe must be mounted at a continuous downward slope in a frost-free environment. Please take care because of application range within water types according to technical data on page 17.
Connection without off-peak contact.
The appliance heats with the adjusted performance.
The 'fast-heating' button is only used for the reset and diagnose functions.
Connection with off-peak contact
If the 'fast-heating’ button is activated, the device heats once to the configured temperature. All 6 LED thermal capacity indicators light up as soon as the configured temperature has been reached. Afterwards, the device turns itself off automatically.
Connection without off-peak contact.
The reservoir heats with the configured basic performance.
The “fast-heating function” activates a heating cycle at higher installed power in order to accelerate the heating-up procedure. To start this function, press the fast-heat button . The LED fast-heating' lights up. The function turns itself off auto- matically, as the soon as the configured temperature has been reached. The LED 'fast-heating' turns off .
Connection with off-peak contact
During off-peak time the device heats with the configured basic performance. The “fast-heating function” activates a heating cycle at higher power in order to accelerate the heating-up procedure. To start this function, press the fast-heat button . The LED 'fast-heating' lights up. The function turns itself off again automatically as soon as the configured temperature has been reached. The LED fast-heating' turns off.
The rest of the time, the device does not heat. If the 'fast-heating' button is activated, the device heats once to the config- ured temperature. All 6 LED thermal capacity indicators light up as soon as the configured temperature has been reached. Afterwards, the device turns itself off automatically.
Connection without off-peak contact.
The device does not heat by default.
If the 'fast-heating' button is activated, the device heats once to the configured temperature. All 6 LED thermal capacity indicators light up as soon as the configured temperature has been reached. Afterwards, the device turns itself off automatically.
Each further heating process must be started by pushing the button “fast-heating” .
The power switch “S1” may only be activated in an unpowered state!!
Remove lower cap by taking the screws out (page IV, diagram 13, 13.1).
Lead cable through the cable gland and cord grip and connect, then tighten the cable gland and cord grip (page V, diagram 14).
Check that the system is suitable for the maximum power absorbed by the water heater (please refer to the data plate) and that the cross-section of the electrical connection cables is suitable, and no less than 2.5 mm2.
Set the power switch “S1” to the correct operating mode on the electronic board.
Set the desired load according to the connection examples.

Power Switch “S1” Mode of Operation

Double power switch positions 5 / 6 / 7

Single power switch positions 1/ 2 / 3 / 4

Boiler mode switch positions 8 / 9 / 0
The power switch is set by the manufacturer in position 5 for DG80025 and DG10025 models and in position 6 for DG12025 and DG15025.
Depending on the home installation, the following connection variations are possible:
Refer to the connection types recommended for double power (page VI)
If no low-tariff electricity is to be used, do not remove bridge between L1 and L1T.
Connect the output of the autotimer (delivered by the electricity provider) with L1 and L1T.
Connect switched phase L1T (connection for low-tariff power) to L1T terminal.
Connect switched phase L1 to terminal L1 and L1T.

According to the duration of the off-peak period of either 8 or 4 hours, and the associated loads (refer to connection types on page 7), set the power switch “S1” to the correct positions, 5 /6 / 7, of the double power set-up.
Depending on the home installation, the following connection variations are possible:
Refer to the connection types recommended for single power (page VII)
Set power switch “S1” on the electronic board to positions 1 / 2 / 3 / 4 “single power”.
Depending on the home installation, the following connection variations are possible:
Refer to the connection types recommended for boiler switch (page VII)
Set power switch “S1” on the electronic board to positions 8 / 9 / 0 “boiler mode”.
Finally, separate the appropriate circuit diagram (E1/E2/E3/E4) and the corresponding power-switch position “S1” from the enclosed adhesive foil and adhere to the pad provided. Fill out the information decal about the installed circuit and installed load and adhere to the outside of the cover.
Double power · Single power · Boiler mode

Fill the reservoir and flush it out until water discharges from all hot water taps, otherwise the temperature sensor and retainer will be damaged and require replacing.
During heating, displaced water must drop from the discharge of the safety valve (closed operation) or out of the mixer tap (open operation). Monitor the first heating cycle.
Temperature Limits (page I, diagrams 2 to 4)
In order to avoid hazards, repairs may only be carried out by a customer service operator licensed by us.
The initial service through our customer service operator should take place around two years after the first operation. At this time, the device will potentially be decalcified. Afterwards, the customer service operator will recommended a date for the next service. Specify the E-No. and FD-No. when phoning the customer service operator!
Before decalcification the device must be emptied. Without placing stress on the device, draw hot water until cold water comes. Then, close the shut-off valve on the intake, open the hot water valves on all connected fittings and empty the device via the safety valve. A few litres of water will remain in the device. To empty completely, loosen the four screws on the cover and remove the cover (page IV, diagram 13, 13.1). Unscrew the fastener “b” of the discharge connecting piece (page V, diagram 15), the remaining water flows away.
Decalcify the device. The specially enamelled steel reservoir and the protection anode are not to come into contact with the decalcifier, do not work with a pump! Remove heater and de-calcify, clean discharge pipes mechanically and remove remaining lime.
In an open operation, a valve can be fitted between the fitting and cold water intake of the reservoir to aid emptying.
Initial Use · Maintenance · Decalcification

DG10025
DG12025
DG15025
Heating time in hrs, with cold water intake of ca. 15°C, to a temperature of 85°C
1/2 male thread
Application range within water types Water hardness
≥6 ≥100
Secure base load (min. xx A)
Secure max. load (max. xx A)
DG80025 - DG15025 1 kW 1/N/PE~230 V // 1 x min 10 A 2 kW 1/N/PE~230 V // 1 x min 10 A 3 kW 1/N/PE~230 V // 1 x min 16 A
1/N/PE~230V
4 kW 1/N/PE~230 V // 1 x min 20 A
3 kW 2/N/PE~230 V // 2 x min 16 A
4 kW 2/N/PE~230 V // 2 x min 10 A
6 kW 3/N/PE~230 V // 3 x min 10 A
DG80025 - DG15025 2 kW 1/N/PE~230 V // 1 x min 10 A 3 kW 1/N/PE~230 V // 1 x min 16 A 4 kW 1/N/PE~230 V // 1 x min 20 A
2/N/PE~230V
2 kW 2/N/PE~230 V // 2 x min 10 A
3 kW 2/N/PE~230 V // 2 x min 10 A
6 kW 2/N/PE~230 V // 2 x min 16 A 2 kW 3/N/PE~230 V // 3 x min 10 A
3 kW 3/N/PE~230 V // 3 x min 10 A
6 kW 3/N/PE~230 V // 3 x min 10 A

If your device does not function as intended, it is usually due to a small detail. Please check whether or not the fault can be self-repaired according to the following indicators. You will thereby avoid the costs of an unnecessary repair service.
In normal operations, the LED “anode” is constantly lit, the LED “service” is off.
If one of the two LEDs flashes, this indicates an “error condition”.
In case of fault, do not disconnect the power supply line.
In order to possibly remedy the error condition oneself, there are two procedures:
RESET: To begin with, please reset the device ➜RESET. To do this, proceed as follows:
Firstly, turn the dial to the setting ” • ” .
After that, press the “fast-heating” button .
If the cause of the “error condition” does not exist directly after the reset, the device will again return to its normal mode of function. Otherwise the device will again indicate an “error condition”.
Diagnostic routines: In order to better define the “error condition”, the device uses diagnostic routines. Please activate the program as follows:
Push and hold the button “fast-heating” for at least 5 seconds.
The type of fault will now be displayed by the 6 hot water content LEDs , as presented in the following table:

1 2 3 4 5 6
Heat content display indicators (LED)

Display (LED) Status Cause / Fault Solution Who Heat content display
Anode Service Fast Heating
Electronic board locked, wait 15mins and then reset
The reservoir has heated without water
Turn the device off, check the cause of the water shortage (leakage, faulty water connection). If the problem remains contact technician
Water temperature in reservoir too hot
Reset, wait until the reservoir has cooled. If the problem remains please contact technician
Reset, if the problem remains please contact technician
Reset, if the problem remains please contact technician
Reset, if the problem remains please contact technician
Temperature fault between heating/sensor
Reset, if the problem remains please contact technician
Check that the reservoir is filled. If the problem remains please contact technician
Reset not possible, please contact technician.
(*) the third LED indicates whether or not the off-peak contact was correctly installed. Third LED “on” if off-peak contact on. Third LED “off” if off-peak contact out.
If the third LED is off during the off-peak period, the fault lies in the installation of the off-peak contacts.
When installing the device without off-peak contact, the third LED is always on.
Note In an “error condition”, the device is out of order. In the case of an “anode fault” or a “potentiometer fault”, the device can be manually activated for a heating cycle by press- ing the “fast-heating” button . In this case the device heats until a water temperature of 40°C is reached. The device heats at the installed power for single-power and boiler mode connections, for double-power connections it heats according to the basic load of the connection, at 1kW, 2kW or 3kW.
If the fault could not be remedied, please contact the customer service operators.
After the assembly, please present the user with the instructions for use and explain the device to them.

Before you use the device, please read this instruction manual carefully!
Safety advice • This device is intended for household or household-like use, not for commercial purposes. Household-like applications include, for example, use in staff kitchens of shops, offices, agricultural and other business operations, as well as use by guests in hostels, small hotels and similar living facilities.
customer service technician or a qualified specialist company. • If the reservoir has not been used for more than three months, it must be flushed out until no more air bubbles escape. When the device is full with water and functions normally (there are no faults apparent), the device cannot be separated from the mains voltage for long periods of time, otherwise the external power source anode stops functioning and the device rusts through. For complaints of this nature, the warranty and guarantee do not apply.
Read also the detailed safety sentence at the beginning of the manual and to observe them!

The hot water storage units DG80025 – DG15025 with electronic control are designed for the heating of drinking water accord- ing to DIN 1988. They can provide hot water to 85°C and, depending on the mode of operation, service one or more taps (tapping points). The water is heated electrically. On the control panel the current amount of available hot water is displayed by 6 LEDs. The hot water storage units are equipped with an active, electronic corrosion protector (external power source anode).
The hot water temperature may be set between * and 85°C using the dial. We recommend the setting of 60°C. Heat wastage and calcification are lowest here.
Upon reaching the set temperature all 6 thermal capacity indicators LEDs light up. As hot water is extracted the amount of hot water available in the reservoir decreases. The less hot water available, the fewer LEDs are lit up.
The heating period is dependent upon the volume of water in the reservoir, the cold water intake temperature, and the set heat output. See technical data table (page 15)
The hot water storage unit may be used optionally for closed (pressurised) operation
suitable for service of multiple tapping points open (de-pressurised) operation
suitable for service of one tapping point
There are three variations of electrical connections to choose from:
Reheating occurs automatically subject to the power supply. The button “fast-heating” is only used for the reset and diagnostic routine functions (technician).
During off-peak periods, the hot water storage unit automatically heats the contents of the reservoir at the configured basic performance. The quick heating may be activated by pressing the fast-heating button . As the device is heating up the LED lights up, before going out again as soon as the set temperature is reached. The 'fast-heating' switches itself off automatically.
In this mode the hot water storage unit heats the contents of the reservoir once upon the initial operation at the con- nected and configured basic performance. Each further heating procedure must be started manually by pressing the button fast-heating .

In normal operations, the LED “anode” is constantly lit, the LED “service” is off. If one of the two LEDs flashes, this indicates an “error condition”. To begin with, please reset the device ➜ RESET. To do this, proceed as follows: Firstly turn the dial to the setting ” • ”. After that, press the “fast-heating” button . If the cause of the error condition does not exist directly after the reset, the device will again return to its normal mode of func- tion. Otherwise the device will again indicate an “error condition”. In this case please contact the customer service operator.
Customer Service In order to avoid hazards, repairs may only be carried out by a customer service operator licensed by us. The initial service through our customer service operator should take place around two years after the first operation. At this time, the device will potentially be decalcified. Afterwards, the customer service operator will recommended a date for the next service. Specify the E-No. and FD-No. when phoning the customer service operator!
When requesting customer service, please enter the E-No. and the FD-No. of your device. You will find the numbers on identification plate between the water access pipes of the reservoir.
This device complies with the European Guideline 2002/96/EG for waste electrical and electronic equipment (WEEE). This pro- vides the framework for an EU-wide recall and conversion of waste electronic devices. Please consult a specialist dealer for information about current disposal methods.
Subject to change.

Siemens Info Line (Mo-Fr: 8.00-18.00 Uhr erreichbar) Für Produktinformationen sowie Anwendungs- und Bedienungsfragen: Tel.: 0911 70 440 044 oder unter siemens-info-line@bshg.com Nur für Deutschland gültig!




42.0.01.04848.01 9000952700 0214
In dieser Anleitung genannte Seiten – Hersteller, Support und Downloads.
Besitzer und unser Team antworten in der Regel innerhalb eines Tages – und Ihre Frage hilft auch anderen weiter.
Stellen Sie die erste Frage — andere Nutzer oder unser Team antworten Ihnen.