DE
Offizielle Bedienungsanleitung

ter Hurne Floating installation with LOCKitEASY

31 Seiten·676 KB·Bodenbeläge·PDF·ENITJA
ter Hurne Floating installation with LOCKitEASY
Inhaltsverzeichnis 7 Abschnitte Installation instructions · Floating installation with LOCKitEASY - Luxury Vinyl Tiles Perform · Preparation and suitability test · Glue-down installation · … AnzeigenAusblenden
Page 1 of the ter Hurne Floating installation with LOCKitEASY user manual — Preparation and suitability test
Seite 1 · Zum Vergrößern klicken
Seite 1

Installation instructions

Floating installation with LOCKitEASY - Luxury Vinyl Tiles Perform

Preparation and suitability test

ter Hürne luxury vinyl tiles consist of thermoplastic materials that are subject to temperature-related dimensional changes. Depending on the installation situation and use, gaps may form or the surfaces may deform due to thermal changes. As such, a preliminary assessment should be made on whether the floor is installed as a floating installation or fully glued. For special use, such as in special commercial applications or spatial situations with a high point load and use on underfloor heating systems, we recommend glue down installation to prevent or limit possible gaps and defor- mations.

8. Installation on existing floor coverings: Installation on smooth tiles is permissible, if all tiles are of the same height and the width/height of the joints is no more than 3mm. If joints are bigger than this we recommend levelling of the tiled floor.

Installation on textile subfloors (e.g. carpets) and on loosely installed old surfaces is prohibited. Please remove these surfaces before installation and prepare the subfloor accordingly. Please consult your dealer for any subfloors not listed here.

9. The floorboards may neither be screwed nor nailed (fixed).
1. Thoroughly read these installation instructions before installation.
10. The substructure must be able to take a load; there must be no bounce, particularly in a joist structure with subfloor panels.
2. Ensure that all floorboards in an installation area come from the same batch to prevent any possible batch-related colour nuances. This must also be considered for any reorders. You can find the batch number on the head label of every carton.
11. Before and during installation, the floor elements must be thoroughly inspected for material defects. Floorboards with visible defects or damage must not be installed. No claims can be accepted once goods have been installed. 12) This floor is not suitable for installation in showers, public washrooms, and saunas.
3. To acclimatise the materials, store the packs horizontally and unopened at 20°C and 40-60% air humidity in the middle of the room in question for 48 hours and not in front of the window.
4. Use original ter Hürne accessories for installation.
13. Tools required include a cutter, tapping block and hammer (or use a plastic hammer without the tapping block).
5. For subfloors without underfloor heating: Before installation, a professional installer must perform and log a moisture test (CM measurement). Residual moisture on a calcium sulphate floor screed may not exceed 0.5% CM, and 2.0% CM for cement screed.
14. The ideal temperature for installation is +20°C. The temperature should not fall below +18°C nor exceed +28°C during installation. To prevent material changes/ damage, ensure adequate shade when installing in areas with strong direct sunlight.
6. For subfloors with underfloor heating: Before installation, a professional installer must perform and log a moisture test (CM measurement). Residual moisture on a calcium sulphate floor screed may not exceed 0.3% CM, and 1.8% CM for cement screed.
15. The floor is suitable for conservatories which are fully air-conditioned and equipped with shade systems. Similiar climatic conditions (air humidity, temperature) as in the rest of the living area should always be maintained, or as described in the paragraph on care and use.
7. The subfloor must be dry, even, clean and stable. Unevenness in the subfloor that is greater than 2 mm per meter must be levelled using a levelling compound. Failure to comply can lead to an unsatisfactory overall appearance, gapping, and lipping.
Page 2 of the ter Hurne Floating installation with LOCKitEASY user manual — Disassembly with LOCKitEASY
Seite 2 · Zum Vergrößern klicken
Seite 2

Glue-down installation

The luxury vinyl tiles can be glued down, if necessary; in some situations (e.g. damp rooms), glue-down installati- on of luxury vinyl tiles is absolutely imperative.

23. Header joints on adjoining rows must be at least 30 cms apart from each other.
24. Last row ofplanks: Turn the plank to be cut by 180° and draw the cutting marks.

For glue-down installation, only use the recommended adhesive from ter Hürne‘s accessory range and follow all the adhesive manufacturer‘s general instructions.

25. Radiators: Add 30 mm to the pipe‘s diameter and draw the cutting marks. Drill it and separate the planks in the middle of the drill holes. Adhere the installed planks with some glue on the cut section.

You can find detailed installation instructions for glue- down installation here: www.terhuerne.com

Installation with LOCKitEASY

26. Doors: Turn a plank over to mark the cutting line. Adapt the door frames accordingly.
16. Always install the planks row by row. Ensure that you install the covering towards the incoming light (head end of the plank facing the window). If there are several windows, then please align towards the largest one. Begin installing the planks from left to right. The groove side should face the wall. It must be trimmed off.
27. Generally, all transition gaps and structural expansion gaps must be adopted. An expansion gap must be installed if the total area is greater than 10 x 15 meters and in door areas and crossover points between rooms.
28. Cover the expansion gap with the appropriate profile (ter Hürne accessories).
17. For a homogeneous surface image, please use planks from different boxes. Ensure that the design structure is different for planks that lie adjacent to each other.
29. Install the skirting clips spaced approx. 40-50 cm apart (ter Hürne accessories).
18. First row ofplanks: Keep a distance of 10 mm from all walls and fixed components.

When installing skirtings, transition andfinishing profiles or door frames, ensure that the skirtings, profiles, door frames or similar elements are never fixed or wedged to the floor.

19. Place the head end level with the first plank and tap down using a tapping block, so it engages audibly.

Disassembly with LOCKitEASY

20a) Then place the long side of the plank to be installed at an angle of approx. 30° in the groove side of the installed plank. Angle it into the profile and push the plank carefully angled onto the head end of the previous plank. Then tap lightly downwards using a tapping block so it engages.

30. Angle the entire row of planksby 30°. Then loosen the row of planks from the installed area.
31. Separate the planks from each other by pushing the head ends evenly in opposite directions.

20b) For large formats, such as the 1200 x 600 mm XL tile, carefully slide the plank/tile to the edge of the element already installed to avoid damage/compression in the corner area. Pay attention to the edges. For large formats we recommend that this step is carried out by two people.

21. At the end of one row: Turn the plank to be cut by 180° and draw the cutting marks. The cut parts of a plank must be at least 30 cm long for installation.
22. We recommend using a tapping block for optimum 2-sided connection of theplanks. Place it in different parts of the long side of the planks to be installed and carefully tap with a hammer against the tapping block until a closed gap pattern is formed.
Page 3 of the ter Hurne Floating installation with LOCKitEASY user manual — Care and use
Seite 3 · Zum Vergrößern klicken
Seite 3

Care and use

32. Do notfix the floor using heavy objects such as waterbeds, kitchen units, chimneys, aquariums, etc.
38. Ensure a consistent room temperature of 20°C and 40-60% air humidity.
33. Install felt gliders on all movable furniture immediately after installation. Only use soft chair castors (type W). Protect your floor from indentations and scratches by avoiding point loads (e.g. from high heels) or damage (e.g. from pet claws).
39. Make sure that no heat accumulates below covered surfaces (e.g. rugs) when using under floor heating. The area below the carpet may not exceed 27°C.
40. The surface temperature must not exceed 27°C with underfloor heating. Avoid strong direct sunlight on the floor with adequate shading.
34. Place protective mats in the entrance areas.
35. Only clean and maintain with a broom, vacuum cleaner or damp, wrung-out cloths/mops. Please do not use a steam cleaner (212°F, 100°C). Do not allow standing water to form on the floor surface.

41 & 42) Installation on a subfloor that is only heated in certain areas is prohibited.

36. Wipe only in the longitudinal direction of the planks.
37. Only use cleaning and maintenance products from the ter Hürne product line. Follow the instructions on the product label.

Our written and verbal technical instructions , in general, in the installation instructions, in technical information, and all brochures are based on our own experience and are given to the best of our knowledge, but they constitute non-binding information. Due to the y many application possibilities, not all individual details can be shown. As such, no obligation and liability can be assumed by ter Hürne.These instructions can be adapted to technological advances at any time without notice.

Page 4 of the ter Hurne Floating installation with LOCKitEASY user manual — Preparation and suitability test
Seite 4 · Zum Vergrößern klicken
Seite 4

Installation instructions

Floating installation with LOCKitEASY - Luxury Vinyl Tiles Perform

Preparation and suitability test

ter Hürne luxury vinyl tiles consist of thermoplastic materials that are subject to temperature-related dimensional changes. Depending on the installation situation and use, gaps may form or the surfaces may deform due to thermal changes. As such, a preliminary assessment should be made on whether the floor is installed as a floating installation or fully glued. For special use, such as in special commercial applications or spatial situations with a high point load and use on underfloor heating systems, we recommend glue down installation to prevent or limit possible gaps and defor- mations.

8. Installation on existing floor coverings: Installation on smooth tiles is permissible, if all tiles are of the same height and the width/height of the joints is no more than 3mm. If joints are bigger than this we recommend levelling of the tiled floor.

Installation on textile subfloors (e.g. carpets) and on loosely installed old surfaces is prohibited. Please remove these surfaces before installation and prepare the subfloor accordingly. Please consult your dealer for any subfloors not listed here.

9. The floorboards may neither be screwed nor nailed (fixed).
1. Thoroughly read these installation instructions before installation.
10. The substructure must be able to take a load; there must be no bounce, particularly in a joist structure with subfloor panels.
2. Ensure that all floorboards in an installation area come from the same batch to prevent any possible batch-related colour nuances. This must also be considered for any reorders. You can find the batch number on the head label of every carton.
11. Before and during installation, the floor elements must be thoroughly inspected for material defects. Floorboards with visible defects or damage must not be installed. No claims can be accepted once goods have been installed. 12) This floor is not suitable for installation in showers, public washrooms, and saunas.
3. To acclimatise the materials, store the packs horizontally and unopened at 20°C and 40-60% air humidity in the middle of the room in question for 48 hours and not in front of the window.
4. Use original ter Hürne accessories for installation.
13. Tools required include a cutter knife, crow bar, tapping block and hammer (or use a plastic hammer without tapping block).
5. For subfloors without underfloor heating: Before installation, a professional installer must perform and log a moisture test (CM measurement). Residual moisture on a calcium sulphate floor screed may not exceed 0.5% CM, and 2.0% CM for cement screed.
14. The ideal temperature for installation is +20°C. The temperature should not fall below +18°C nor exceed +28°C during installation. To prevent material changes/ damage, ensure adequate shade when installing in areas with strong direct sunlight.
6. For subfloors with underfloor heating: Before installation, a professional installer must perform and log a moisture test (CM measurement). Residual moisture on a calcium sulphate floor screed may not exceed 0.3% CM, and 1.8% CM for cement screed.
15. The floor is suitable for conservatories which are fully air-conditioned and equipped with shade systems. Similiar climatic conditions (air humidity, temperature) as in the rest of the living area should always be maintained, or as described in the paragraph on care and use.
7. The subfloor must be dry, even, clean and stable. Unevenness in the subfloor that is greater than 2 mm per meter must be levelled using a levelling compound. Failure to comply can lead to an unsatisfactory overall appearance, gapping, and lipping.
Page 5 of the ter Hurne Floating installation with LOCKitEASY user manual — Installation with LOCKitEASY
Seite 5 · Zum Vergrößern klicken
Seite 5

Glue-down installation

The luxury vinyl tiles can be glued down, if necessary; in some situations (e.g. damp rooms), glue-down installati- on of luxury vinyl tiles is absolutely imperative.

27 & 28) Start with a new row and now carry out the installation in the opposite direction. Make sure that the grooved side of both planks now faces outwards.

For glue-down installation, only use the recommended adhesive from ter Hürne‘s accessory range and follow all the adhesive manufacturer‘s general instructions.

29. Angle the new plank at the long side of the installed plank. Slide it to just in front of the head end and press the plank down. With the help of a crow bar (or tapping block), hammer the plank with its head end into the longitudinal joint.

You can find detailed installation instructions for glue- down installation here: www.terhuerne.com

Installation with LOCKitEASY

30. Continue the installation until the third row is also installed.
16. Always install the planks row by row. Ensure that you install the covering towards the incoming light (head end of the plank facing the window). If there are several windows, then please align towards the largest one. Begin installing the planks from left to right. The groove side should face the wall. It must be trimmed off.
31. Angle the new plank at the long side of the installed plank. Slide it to just in front of the head end and press the plank down. With the help of a crow bar (or tapping block), hammer the plank with its head end into the longitudinal joint.

32 & 33) Continue the installation until all additional rows are installed. Ensure that the last row is 10 mm away from the wall.

17. For a homogeneous surface image, please use planks from different boxes. Ensure that the design structure is different for planks that lie adjacent to each other.

34 & 35) Now fill in the remaining spaces. Start from the outwards in.

18. First row ofplanks: Keep a distance of 10 mm from all walls and fixed components.
36. Radiators: Add 30 mm to the pipe‘s diameter and draw the cutting marks. Drill it and separate the planks in the middle of the drill holes. Adhere the installed planks with some glue on the cut section.

19 & 20) Make sure that the grooved sides of both planks face outwards when starting installation. If one grooved side of the plank faces inwards and the other grooved side of the second plank faces outwards, installation is not possible.

37. Doors: Turn a plank over to mark the cutting line. Adapt the door frames accordingly.
21. Determine the centre of the room (A-A), and therefore establish the centre line of the room (dashed line).
38. Generally, all transition gaps and structural expansiongaps must be adopted. An expansion gap must be installed if the total area is greater than 10 x 15 meters and in door areas and crossover points between rooms.
22. Cut off the lower side of the head end at a 45° angle. Make sure that the grooved side faces outwards. The cut edge is parallel to the wall (at a distance of 10 mm) and represents the beginning of the installation row.
39. Cover the expansion gap with the appropriate profile (ter Hürne accessories).
23. Measure the centre of the head end (short side of the plank) and mark the centre of the head end. This point must lie exactly on the centre line (dashed line) of the room. The tip of the plank defines the installation line (solid line).
40. Install the skirting clips spaced approx. 40-50 cm apart (ter Hürne accessories).

When installing skirtings, transition andfinishing profiles or door frames, ensure that the skirtings, profiles, door frames or similar elements are never fixed or wedged to the floor.

24. Now angle the second plank at the head end of the first plank and press it down. Ensure that the head end connects with the long side and does not protrude. Both planks are now at a 90° angle to each other.
25. Continue as described under 24). Make sure that the installation direction remains on the installation line.
26. Continue the installation until the first two rows are installed.
Page 6 of the ter Hurne Floating installation with LOCKitEASY user manual — Care and use
Seite 6 · Zum Vergrößern klicken
Seite 6

Disassembly with LOCKitEASY

41. Separate the planks from each other by pushing the head ends evenly in opposite directions.
46. Only use cleaning and maintenance products from the ter Hürne product line. Follow the instructions on the product label.

Care and use

47. Ensure a consistent room temperature of 20°C and 40-60% air humidity.
42. Do notfix the floor using heavy objects such as waterbeds, kitchen units, chimneys, aquariums, etc.
48. Make sure that no heat accumulates below covered surfaces (e.g. rugs) when using under floor heating. The area below the carpet may not exceed 27°C.
43. Install felt gliders on all movable furniture immediately after installation. Only use soft chair castors (type W). Protect your floor from indentations and scratches by avoiding point loads (e.g. from high heels) or damage (e.g. from pet claws).
49. The surface temperature must not exceed 27°C with underfloor heating. Avoid strong direct sunlight on the floor with adequate shading.
44. Place protective mats in the entrance areas.

50 & 51) Installation on a subfloor that is only heated in certain areas is prohibited.

45. Only clean and maintain with a broom, vacuum cleaner or damp, wrung-out cloths/mops. Please do not use a steam cleaner (212°F, 100°C). Do not allow standing water to form on the floor surface.

Our written and verbal technical instructions , in general, in the installation instructions, in technical information, and all brochures are based on our own experience and are given to the best of our knowledge, but they constitute non-binding information. Due to the y many application possibilities, not all individual details can be shown. As such, no obligation and liability can be assumed by ter Hürne.These instructions can be adapted to technological advances at any time without notice.

Quellen

Referenzen & Links

In dieser Anleitung genannte Seiten – Hersteller, Support und Downloads.

Frage zu ter Hurne Floating installation with LOCKitEASY stellen

Besitzer und unser Team antworten in der Regel innerhalb eines Tages – und Ihre Frage hilft auch anderen weiter.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
Noch keine Fragen zu ter Hurne Floating installation with LOCKitEASY

Stellen Sie die erste Frage — andere Nutzer oder unser Team antworten Ihnen.

Originaldokument

ter Hurne Floating installation with LOCKitEASY PDF-Anleitung

31 Seiten·676 KB·Bodenbeläge·PDF
Klicken Sie oben auf eine Seite, um sie hier zu öffnen
Seite 1 / …
100%
Seiten werden geladen…