Benutzeranleitung / Produktwartung EGH-125 des Produzenten Weil-McLain
Zur Seite of 36
Control Supplement Control Supplement Control Supplement Control Supplement Control Supplement EGH EGH EGH EGH EGH Gas-Fired Boiler EGH-105 t o EGH-125 Series 4 Natural gas ‡ P art No.
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 2 The following terms are used throughout this Control Supplement to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product.
CSD-1 control system — Natural gas P art Number 550-110-677/0299 3 Carton guide T able 1 Boiler car tons V erify that the correct car tons are av ailable bef ore beginning assemb ly . Note that the Base assembly and T rim & controls car tons for CSD-1 are special.
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 4 Installation I Place the boiler Refer to the EGH Manual. Read Section I and follow all of its guidelines.
CSD-1 control system — Natural gas P art Number 550-110-677/0299 5 Install optional vent damper (if supplied) If not instal ling a vent damper , proc eed to next section ( Piping connections ). Once a vent damper has been operated on an EGH boiler , the boiler will no longer operate without a damper installed.
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 6 P iping connections II Connect steam (water) piping to the boiler per EGH Manual Section II.
CSD-1 control system — Natural gas P art Number 550-110-677/0299 7 Install boiler controls — steam boilers III Figure 4 Steam boiler connections T able 3 Steam boiler connections 32¾" 23 / &.
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 8 Gas piping V Size and connect gas supply piping per EGH Manual , Section V . The gas supply can enter from either the right or left side of the jacket.
CSD-1 control system — Natural gas P art Number 550-110-677/0299 9 General The following sequence of operation applies to all wiring diagrams in this Supplement — both water and steam. Call for heat On a call for heat (from thermostat or operating control): 1 .
P art Number 550-110-677/0299 10 o NOTES: TO COMPONENT MANUF ACTURER’S INSTR UCTIONS FOR APPLICA TION WIRING AND FOR MUL TIPLE ZONE SYSTEMS USING ZONE V AL VES OR CIRCULA TORS , REFER 5. THERMOST A T - FOR SINGLE ZONE SYSTEMS, THERMOST A T ANTICIP A TOR SETTING IS 0.
P art Number 550-110-677/0299 11 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement NOTE 10 TERMINAL.
P art Number 550-110-677/0299 12 MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-02 1 2 3 4 5 6 10 8 9 11 12 14 15 15 16 17 18 19 20 24 21 25 21 22 23 7 V ent connections — Connect with ¼" tubing and run vent line outside building per code requirements.
P art Number 550-110-677/0299 13 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement 1 CSD-1 control .
P art Number 550-110-677/0299 14 o NOTES: TO COMPONENT MANUF ACTURER’S INSTR UCTIONS FOR APPLICA TION WIRING AND FOR MUL TIPLE ZONE SYSTEMS USING ZONE V AL VES OR CIRCULA TORS, REFER 5. THERMOST A T - FOR SINGLE ZONE SYSTEMS, THERMOST A T ANTICIP A T OR SETTING IS 0.
P art Number 550-110-677/0299 15 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement NO TE 10 TERMINA.
P art Number 550-110-677/0299 16 MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-01 1 2 3 4 5 6 10 8 9 11 12 14 15 15 16 17 18 19 20 21 22 23 24 25 25 26 27 Install strain relief bushings wherev er electr ical wiring passes through jack et.
P art Number 550-110-677/0299 17 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement 1 CSD-1 control .
P art Number 550-110-677/0299 18 o NOTES: TO COMPONENT MANUF ACTURER’S INSTR UCTIONS FOR APPLICA TION WIRING AND FOR MUL TIPLE ZONE SYSTEMS USING ZONE V AL VES OR CIRCULA TORS, REFER 5. THERMOST A T - FOR SINGLE ZONE SYSTEMS, THERMOST A T ANTICIP A T OR SETTING IS 0.
P art Number 550-110-677/0299 19 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement NO TE 10 TERMINA.
P art Number 550-110-677/0299 20 MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-01-p 1 2 3 4 5 6 7 10 8 9 11 12 14 15 15 16 17 18 19 20 21 22 25 25 26 27 23 24 Install strain relief bushings wherev er electr ical wiring passes through jack et.
P art Number 550-110-677/0299 21 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement 1 CSD-1 control .
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 22 Final adjustments VII 1 . Follow EGH Manual instructions for Final Adjustments , Section VII, including filling the boiler and skimming steam boilers.
CSD-1 control system — Natural gas P art Number 550-110-677/0299 23 Final adjustments — operating instructions VII Figure 11 Operating instructions.
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 24 Check - out procedure — operation VIII Always follow boiler Operating instructions , Figure 11, when starting the boiler .
CSD-1 control system — Natural gas P art Number 550-110-677/0299 25 Check - out procedure — leak test VIII 677-11 1 2 4 3 T o control panel Fo r your safety , turn off electrical power supply before making any electrical connections to avoid possible shock hazard.
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 26 Check - out procedure — troubleshooting VIII V erify proper operation after servicing Never jumper (bypass) any device except for momentary testing as outlined in T roubleshooting Char ts.
CSD-1 control system — Natural gas P art Number 550-110-677/0299 27 Check - out procedure — troubleshooting VIII VISU ALL Y CHECK — Is ground wire connected from GND (Burner) to ignition control mounting screw , and ground wire connected from transf or mer ter minal C to case ground? Correct by making connections .
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 28 Check - out procedure — troubleshooting VIII Is damper harness securely plugged in at both ends? Secure connections .
CSD-1 control system — Natural gas P art Number 550-110-677/0299 29 Check - out procedure — troubleshooting VIII Set up microammeter to measure output current in flame sensor circuit as f ollows . a . Detach sense lead from ignition control. Attach negative lead from microammeter to sense terminal on ignition control.
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 30 Check - out procedure — troubleshooting VIII Are pilot valv e wir ing connections CORRECT and securely fastened? Connect securely to terminal PV on ignition control and terminal TR on main gas valve .
CSD-1 control system — Natural gas P art Number 550-110-677/0299 31 Service and maintenance IX Complete Installation and Service Certificate in EGH Manual , Section IX.
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 32 Replacement parts — water boilers X Figure 14 W ate.
CSD-1 control system — Natural gas P art Number 550-110-677/0299 33 T able 5 W ater boiler replacement par ts Before r eplacing any parts on the boiler — T urn off power to boiler and shut off g as supply . Failure t o comply c ould result in sev ere personal injury , death or substantial propert y damage.
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 34 Replacement parts — steam boilers X Figure 15 Steam.
CSD-1 control system — Natural gas P art Number 550-110-677/0299 35 T able 6 Steam boiler replacement par ts Before r eplacing an y parts on the b oiler — T ur n off power t o boiler and shut off gas supply . Failure to c omply could result in sev ere personal injury , death or substantial propert y damage.
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 36 W eil-McLain 500 Blaine Street Michigan City , IN 46360-2388 http://www .
Ein wichtiger Punkt beim Kauf des Geräts Weil-McLain EGH-125 (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie Weil-McLain EGH-125 noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für Weil-McLain EGH-125 - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von Weil-McLain EGH-125 reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über Weil-McLain EGH-125 erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon Weil-McLain EGH-125 besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von Weil-McLain EGH-125 verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit Weil-McLain EGH-125. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei Weil-McLain EGH-125 gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.