Benutzeranleitung / Produktwartung VHS-180 des Produzenten Slant/Fin
Zur Seite of 27
HO T W A TER MODELS VHS-30 THR OUGH VHS-180 GAS-FIRED CAST -IR ON BOILERS FOR NA TURAL AND L.P . PR OP ANE GASES IMPOR T ANT READ ALL OF THE FOLLO WING W ARNINGS AND ST A TEMENTS BEFORE READING THE INST ALLA TION INSTR UCTIONS W ARNING LIQUEFIED PETROLEUM (L.
V I CTOR Y II V HS Models NO TE: Height dimensions increase by 1 3 ⁄ 4 " and depth increases to 22 1 ⁄ 4 " when combustib le floor kit is used.
V I CTOR Y II V HS Models INST ALLA TION REQUIREMENTS The installation must conf or m to the requirements of the a uthority having jurisdiction or , in the absence of such requirements, to the National Fuel Gas Code , ANSI Z223.
V I CTOR Y II V HS Models BOILER ROOM AIR SUPPL Y AND VENTILA TION An ample supply of air is required f or combustion and v enti- l ation. When buildings are insulated, caulked and w eather- stripped, now or later on, direct openings to outside ma y be required and should be provided.
V I CTOR Y II V HS Models CA TEGOR Y II AND III VENTING 1. V ent Material A) The vent system f or horizontal or vertical venting (Categor y II and III ) must be UL listed single wall 3" diameter AL29-4C s stainless steel material.
V I CTOR Y II V HS Models Heat-Fab Saf-T V ent System Boiler Model No . Minimum Length, Ft. 0 to 5500 Ft. Altitudes 5500 to 7000 Ft. Altitudes 7000 to 10,000 Ft.
V I CTOR Y II V HS Models Figure 6 Figure 5 VICT OR Y II HORIZONT AL (SIDEW ALL) VENTING All joints must be liquid and pressure tight. Use U/L listed single wall 3" dia. AL29-4C* S.S . venting materials * Definition of Snow Line: Knowledge of local conditions will re veal the maximum height that repeated snowf alls accumulate to.
V I CTOR Y II V HS Models 8 Figure 7..
V I CTOR Y II V HS Models Figure 8. 9.
V I CTOR Y II V HS Models 10 CA TEGOR Y I VENTING (Natural Draft Chimney and T ype “B” V enting) 1. Installation Model VHS-90, VHS-120, VHS-150 and VHS-180 may be v ented into a natur al draft mas.
V I CTOR Y II V HS Models T able 1. Masonry Vitreous Tile-Lined Chimney (not metal lined) C himneys not e xposed to the outdoors below the roof line. (5" dia. vent adapter must be used) Natural Draft Chimney and T ype “B” V enting T ables A dditional National Fuel Gas Code Boiler Gas Appliance Reference T able No.
V I CTOR Y II V HS Models 12 Figure 9..
V I CTOR Y II V HS Models Figure 10. 13.
V I CTOR Y II V HS Models 14 VENTING SYSTEM REGULAR INSPECTION A. Inspect the system regularly f or condensation, corrosion and/or ph ysical damage. A qualified prof essional should ser- vice the boiler annually and include such an inspection at that time.
V I CTOR Y II V HS Models Figure 11a. Figure 11b. W A TER PIPING Alwa ys f ollow good piping practices . Obser ve minimum 1" clearance to comb ustibles around all uninsulated hot water pipes or when openings around pipes are not protected by non-combustib le materials.
V I CTOR Y II V HS Models 16.
V I CTOR Y II V HS Models Figure 14. Figure 15. Piping Arrangement 17.
V I CTOR Y II V HS Models 18 An automatic air vent is used to remo ve air from the sys- tem. It should be installed in the top of the boiler as shown i n Figure 15. If system pressure needs fur ther control, add an additional tank in parallel with original tank or install a larger capacity tank.
V I CTOR Y II V HS Models Instructions F ollow the lighting instructions in this manual. These instruc- t ions are also attached to the boiler . SAFETY INFORMA TION F or Y o ur Saf e ty Read Bef o re .
V I CTOR Y II V HS Models The gas metered in 3 minutes to obtain rated input f or e ach boiler model , using 1000 Btu/cu. ft. gas, is tab u- lated in gas rate table . B. Main Bur ners 1. Fire the boiler continuously for at least 15 min utes, to reach burner operating temperature.
V I CTOR Y II V HS Models 1. High Limit Control T est Set thermostat high enough for water temperature to reach high limit control setting of Aquastat. When this temperature is reached, the high limit s witch should open and the main gas valv e should close automatically .
V I CTOR Y II V HS Models 22 3. P erf or m “V enting System Regular Inspection” on P age 14. C . Piping Check the f ollowing: 1. W ater piping and accessories for leaks. Slightest l eaks should be corrected. 2. System to be full of water and pressure to remain stable at correct setting on gauge .
V I CTOR Y II V HS Models THERMOST A T CALLS FOR HEA T CIRCULA TOR ON IGNITION SP ARK ST AR TS AND PILO T V AL VE OPERA TOR OPENS THERMOST A T CALLS FOR HEA T ENDS CIRCULA TOR OFF .
V I CTOR Y II V HS Models BURNERS F AIL T O OPERA TE CA USE REMED Y 1. Gas supply valv e shut off 1. Open gas valve 2. No power , main electr ic s witch open 2. Close switch 3. No power , blown or def ective line fuse 3. Replace fuse 4. Pilot flame too low 4.
V I CTOR Y II V HS Models 25 DELA YED IGNITION CA USE REMED Y 1 . Pilot flame too low 1. Adjust pilot flame 2. Excessiv e primar y air 2. Adjust pr imary air shutter 3. Excessiv e burner input 3. Check and reduce to input shown on rating plate NO T ENOUGH HEA T CA USE REMED Y 1.
V I CTOR Y II V HS Models 26 A PPENDIX A V ent System Location and Condensation Drain Requirements 1 . The v enting system shall ter minate at least 3 feet abov e any forced air inlet located within 10 f eet.
SLANT/FIN CORPORA TION, Green vale, N.Y . 11548 • Phone: (516) 484-2600 F AX: (516) 484-5921 • Canada: Slant/Fin L TD/L TEE , Mississauga, Ontario www .
Ein wichtiger Punkt beim Kauf des Geräts Slant/Fin VHS-180 (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie Slant/Fin VHS-180 noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für Slant/Fin VHS-180 - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von Slant/Fin VHS-180 reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über Slant/Fin VHS-180 erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon Slant/Fin VHS-180 besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von Slant/Fin VHS-180 verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit Slant/Fin VHS-180. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei Slant/Fin VHS-180 gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.