Benutzeranleitung / Produktwartung BB5HD des Produzenten Pelco
Zur Seite of 16
00546 BB5HD Series Heavy-Duty Spectra ® Back Box Installation Manual C2429M (3/01) P elco • 3500 P elco Wa y • Clovis , CA 93612-5699 USA • www .
CONTENTS IMPORT ANT SAFEGUARDS AND W ARNINGS ......................................................................................................... 3 DESCRIPTION ......................................................................................
IMPOR T ANT SAFEGUARDS AND W ARNINGS Prior to installation and use of this product, the following WARNINGS should be observed. 1. Installation and servicing should only be done by qualified service personnel and conform to all local codes.
DESCRIPTION The Heavy-duty Spectra is perf ect for installations where structural integ r ity and v andalism are a pr iority . The system f eatures barrel ke y locks , heavy-duty construction and a thick acr ylic low er dome. The in-ceiling model has a reinf orced bracket mounting system f or installation in a fixed ceiling.
S INST ALLA TION IN-CEILING MODEL STEP 1 - PREP ARE CEILING 00530 a. Locate the center point of the mount- ing location. Drill a hole in the ceiling using a 3/32-inch drill. 00531 b. Insert the compass tool into the hole. Draw a circle on the ceiling using the compass tool and a pencil.
STEP 4 - WIRE CIRCUIT BOARD Attach the wiring to the circuit board inside the back box. When finished, close the door to the back bo x and turn on the power . The red LED will light. IMPORT ANT : If the LED does not light, ref er to the T rouble- shooting section .
INST ALLA TION PENDANT MODELS STEP 1 - MOUNT AND INST ALL THE BACK BOX NOTE: If installing outdoors make sure the installation is properly sealed to keep moisture out. 00540 00535 a. Install the mount for the pendant dome. Refer to the instruc- b. T ur n the thumbscrew and open the hinged door located inside tions supplied with the mount.
STEP 3 - INST ALL DOME DRIVE LABEL SW1 L A B E L S W 2 SW1 SW2 RS-422 TERMINA TION SWITCH ON 1 2 3 4 5 6 7 8 ON 1 2 3 4 5 6 7 8 SW2 GREEN T AB RED T AB 00538 a. Set the DIP switches for SW1 and SW2 on the bottom of the dome drive for the appropriate receiver address.
TROUBLESHOOTING PROBLEM POSSIBLE CAUSE SOLUTION Unit does not operate. The controller is not communicating with the Spectra unit. Check to see if the red LED on the circuit board in the back box is lit. 1. The red LED is not lit . a. Fuse is bad. b. 24 V AC pow er source is not con- nected or back box is bad.
APPENDIX Ta b le A. Video Coaxial Cable Wiring Distances Cable T ype* Maximum Distance RG59/U RG6/U RG11/U 750 ft (229 m) 1,000 ft (305 m) 1,500 ft (457 m) * Minimum cable requirements: 75 ohms impedance. All-copper center conductor. 95% braided copper shield.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ta b le D. Switch Settings f or SW2 – P-T ype Control NO TE: F or Coaxitron controls , SW2 is not used; set all switches OFF .
Ta b le E. Switch Settings f or SW2 – D-T ype Control (continued) Receiver Address SW2-1 SW2-2 Switch Setting SW2-3 SW2-4 SW2-5 SW2-6 SW2-7 SW2-8 49 ON OFF OFF OFF ON ON OFF OFF 50 OFF ON OFF OFF ON.
Ta b le E. Switch Settings for SW2 – D-T ype Control (continued) Receiver Address SW2-1 SW2-2 Switch Setting SW2-3 SW2-4 SW2-5 SW2-6 SW2-7 SW2-8 161 ON OFF OFF OFF OFF ON OFF ON 162 OFF ON OFF OFF O.
SPECIFICA TIONS MECHANICAL Construction Back box: Aluminum Dome drive: Aluminum, ABS plastic Lower dome: Acrylic Cable Entry In-Ceiling: .75-inch (1.91 cm) conduit fitting Pendant: Through 1.
GENERAL Environment In-Ceiling: Indoor only Pendant: Indoor/outdoor Operating Range In-Ceiling: 32 to 140 ° F (0 to 60 ° C) intermittent operation; 32 to 122 ° F (0 to 50 ° C) continuous operation.
PRODUCT WARRANTY AND RETURN INFORMA TION WARRANTY Pelco will repair or replace, without charge, any merchandise proved defective in material or If a warranty repair is required, the Dealer must contact Pelco at (800) 289-9100 or workmanship for a period of one year after the date of shipment.
Ein wichtiger Punkt beim Kauf des Geräts Pelco BB5HD (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie Pelco BB5HD noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für Pelco BB5HD - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von Pelco BB5HD reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über Pelco BB5HD erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon Pelco BB5HD besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von Pelco BB5HD verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit Pelco BB5HD. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei Pelco BB5HD gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.