INST ALLATION INSTRUCTIONS 62-0304-05 Class 500 Advanced KWh/Demand Meter APPLICATION The Class 500 Meter is a 3-element meter with commu nications. The device is used to moni tor electric power usage of ind ividual loads after the utility meter .
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 2 S PECIFICATIONS Input V oltage Configuration: 3-wire (Delta) or 4-wire (WYE) Mains V oltage Input: Up to 600 V AC RMS available Input Power: 6 V A maximum rating Current Sensor Rating: Up to 3200 Amp RMS AC available Power Factor: .
CLASS 500 ADVANCED KWH/DEMAND METER 3 62-0304—05 INST ALLATION VERIFY the input voltage rating and configu ration on the unit panel label to ensure it is suitable for the intended e lectrical servic e. Meters labeled for 1 15/208 volt service MUST NOT be installed on service feeds of 277/4 80 volt and vice versa.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 4 Main Power Board Connections to this board include the MA INS input voltage, current sensors, an d external pulse input (See Fig. 2). The MAINS input terminals are covered with a protective clear sh ield fo r safety purposes.
CLASS 500 ADVANCED KWH/DEMAND METER 5 62-0304—05 d. Connect the three AC mains power wires (PHASE A, PHASE B, and PHASE C) to their respective po sitions as labeled on terminal block TB1.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 6 Fig. 3. Split core current sensor assembly . Fig. 4. Split core current sensor assembl y installed. IMPORT ANT : When looking from the source side of the conductor(s) bein g monitored, you should see the arrow on the current sensor assembly .
CLASS 500 ADVANCED KWH/DEMAND METER 7 62-0304—05 Fig. 7. Location of LED D5 (lab eled “MTR”) and Ethernet board. V erify that the AC MAINS vol tage wires ar e all connected to the correct posi tions on terminal block TB1. Inspect the MAINS inp u t wiring to verify each conductor is terminated at the correct te rminal block positi on.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 8 Wiring to the Network RS-485 Wiring for BACnet MS/T P , Modbus RTU, or EZ-7 The Class 500 Meter contains an RS-485 serial communications port allowing it to commu nicate via BACnet MS/TP , Modbus RTU, or EZ-7.
CLASS 500 ADVANCED KWH/DEMAND METER 9 62-0304—05 The meter is shipped with a Modb us ID number of 01. This must be changed if the network has more than one meter installed.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 10 Fig. 1 1. LON wiring . Ethernet wiring for BACnet IP , an d Modbus TCP/IP and Ethernet EZ-7 These models are shipped with a board that a llows for Ethernet commun ication via Modb us TCP/IP , BACnet IP or Ethernet EZ-7.
CLASS 500 ADVANCED KWH/DEMAND METER 11 62-0304—05 NOTE: One set of current sensors equates to th ree sensors, one per phase. The multiplier only appli es when extra sets of cur- rent sensors are installed on one Class 50 0 Meter . Therefore, if you are using on ly one set of three current sensors, the multiplier is not required.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 12 MAINTENANCE The Class 500 Meter unit is shi pped in a calibrated an d fully fu nctionally tested condi tion. Sinc e the u nit is factory calibrat ed using proprietary firmware algorithms, no internal uni t adjustments ar e nece ssary .
CLASS 500 ADVANCED KWH/DEMAND METER 13 62-0304—05 Use the following procedure to re place the lithium battery cell. 1. Disconnect power from the Class 500 Meter at the unit external circuit breaker . 2. Remove the battery from its socket and place it on a non-conductive surface.
CLASS 500 ADVANCED KWH/DEMAND METER 62-0304—0 5 14 Modbus Point Map Modbus data points available from the Class 5 00 meter . Listed under Class 500. T able 4.
CLASS 500 ADVANCED KWH/DEMAND METER 15 62-0304—05 NOTE: T o change device ID, set single point at 46049 with data set to new device ID (e.g., 1 to 247). T o set date/time, set multiple points at 46025 for 4 points with data set to HHMM SSDW MMDD YYYY (DW=day of week).
CLASS 500 ADVANCED KWH/DEMAND METER Automation and Co ntrol Solutions Honeywell Internationa l Inc. 1985 Douglas Drive North Golden Valley, MN 55422 customer.honeywell.com ® U.S. Regi stered T rademark © 201 1 Ho neywell International Inc. 62-0304—05 M .
Ein wichtiger Punkt beim Kauf des Geräts Honeywell 500 (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie Honeywell 500 noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für Honeywell 500 - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von Honeywell 500 reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über Honeywell 500 erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon Honeywell 500 besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von Honeywell 500 verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit Honeywell 500. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei Honeywell 500 gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.