Benutzeranleitung / Produktwartung ML-135312-960RX des Produzenten Vulcan-Hart
Zur Seite of 14
INSTALLATION & OPERATION MANUAL 900RX Heavy Duty Gas Griddles M M 92 M 93 M 94 M 96 M 97 M w ODEL LS 4RX L-135309-924RX 6RX L-135310-936RX 8RX L-135311-948RX 0RX L-135312-960RX 2RX L-135313-972RX ww.vulcanhart.com 936RX ITW Food Equipment Group, LLC 3600 North Point Blvd.
IMPORTANT FOR YOUR SAFETY THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL GAS EQUIPMENT, WHO SHOU LD PERFORM THE IN ITIAL FIELD START-UP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL. POST IN A PROMINENT LOCATION TH E INSTRUCTIONS TO BE FOLLOWED IN THE EVENT THE SMELL OF GAS IS DETE CTED.
- 3 - INSTALLATION, OPERATION AND CARE OF HEAVY DUTY GAS GRIDDLES GENERAL Heavy Duty Gas Griddles are produce d with quality workmanship and mate rials. Proper installation, usa ge and maintenance of your griddle will result in many years of satisfa ctory per formance.
This griddle is Design Certified f or installation on a non-combu stible counte r with 4” legs, or combustible floor with 25 ” high stand. INSTALLATION CLEARANCES COMBUSTIBLE CONSTRUCTION NON-COMB.
Casters are only sup plied on a griddle stan d. If the griddle is moved for any rea son the griddle sh ould be re-lev eled (see LEVELING in this manu al). FLUE CONNECTIONS Do not obstruct the flow of f lue gase s from the f lue, locat ed at the rea r of the gr iddle.
the griddle (Fi g. 1) and the regulat or is positioned with the vent plug and adjus tment screw upright (Fig. 2). Fig. 1 Fig. 2 The supply press ure (upstream of the regulato r) should be 7-9” W.C. for n atural gas and 11-12” W.C. for p ropane gas.
- 7 - SEASONING THE GRIDDLE Season the gr iddle to avoid po ssible surf ace corrosio n before first u se, and after every cleaning. He at griddle to a low temperature (3 00-350°F) and a pply a small amoun t of cooking o il – about one ounce per square f oot of surf ace.
900RX PILOT LIGHTING PROCEDURE 1. Turn all thermostats to the OFF position. Wait 5 minutes to allow any gas that may have accumulated in the burner compartment to escape. 2. Turn on the main gas shut-off valve. 3. Push the power switches to ON. The switches will illuminate and you will hear a “clicking” sound.
USING THE GRIDDLE To preheat, turn th e burners on about 20-25 min utes before cookin g. A uniform and sy stemat ic approach to loading the griddle w ill produce the mo st consistent product re sults. The griddl e plate is steel, but t he surface is relativ ely soft and can be scored or dented by careless use of a sp atula or scraper.
- 10 - CLEANING THE GRIDDLE Empty the gre ase drawer as needed thro ughout the day and reg ularly clean at least once daily. Clean the grid dle regularly.
ADJUSTMENTS CALIBRATION 1. Each thermostat co ntrols a 12” zone of the griddle. Usin g a Surface P robe temp erature measurement de vice, observe the te mperatures at the center points of t he cookin g zones.
LEVELING The griddl e must be level (side-to -side and front- to-back) during operat ion to ensure proper perfo rmance. Improp er leveling can r esult in uneve n temperature distr ibution, cold spots, and po ssibly damage el ectrical components. 1. Place a level on the g riddle.
SERVICE AND PARTS INFORMATION Contact the Service Agency i n your area to obtain service a nd parts i nformation. For a complete listing of Service and Part s depots refe r to or www.
- 14 - TROUBLESHOOTING PROBLEM POSSIBLE CAUSES Heat does n ot come on when the th ermostat is turned on 1. Problem with thermostat. (Cal l for service) 2. Pilot burner not lit . (Call for service) 3. Problem with gas valve (Call fo r service) Pilot burner will no t light 1.
Ein wichtiger Punkt beim Kauf des Geräts Vulcan-Hart ML-135312-960RX (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie Vulcan-Hart ML-135312-960RX noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für Vulcan-Hart ML-135312-960RX - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von Vulcan-Hart ML-135312-960RX reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über Vulcan-Hart ML-135312-960RX erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon Vulcan-Hart ML-135312-960RX besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von Vulcan-Hart ML-135312-960RX verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit Vulcan-Hart ML-135312-960RX. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei Vulcan-Hart ML-135312-960RX gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.