Benutzeranleitung / Produktwartung Ship-Ahead Input/Output Cabinet NXL des Produzenten Liebert
Zur Seite of 20
AC P ow er For Business-Criti cal C on tinuity™ Li eber t ® NXL ™ S hip - Ahead I nput/O utput Cabinet Install atio n Manual – 250-400kV A, 60Hz.
C ONT ACTING L IEBERT FOR S UPPORT To contact Liebert Services for information or repair service in the United States, call 1-800-LIEBERT (1-800-54 3-2378). Liebert Services offe rs a complete range of start-up services, repair services, preventive maintenanc e plans and service contracts.
i T A BLE OF CONTENTS 1.0 M ECHANICA L I NST ALLATIO N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ii.
1 I MPORT ANT S AFETY I NSTRUCTIONS SA VE THESE INSTRUCTIONS This manual co ntains important ins tructions that should be followed during installation of your Lie- bert NXL ™ Input/Output Cabinet. Read this manual thoroughly, payi ng special attention to the sec- tions that apply to your instal lation, before working with the UPS.
Mechanical Installation 2 1.0 M ECHANICAL I NST ALLATION 1.1 Introduction This following se ction describes the requiremen ts th at must be taken into account when p lanning the positioning and cabling of the Li ebert NXL Input/Output Cabinet.
Mechanical Installation 3 1.4.1 Moving the Cabinet s The Liebert NXL Input/Output Cabinet can be handled with a f orklift or similar equipment. When moving the unit by forklift, care must be take n to protect the panels. Do not exceed a 15-degree tilt with the forklift.
Electrical Installation 4 2.0 E LECTRICAL I NST A LLATION This chapter provid es guidelines fo r qualified install ers who must have knowledge of local wiring practices pertaining to the equipment to be installed. 2.1 External Protective Devices For safety, circuit breakers must be installed in the input AC supply and external ba ttery system.
Electrical Installation 5 The following are guidelines only and are superseded by local regulations and codes of practice where applicable: • Take special care when determin ing the size of the neut.
Electrical Installation 6 Top Cable Entry When making the power connections, the recommended order of pulling and installing cables is to start from the top connections to the bottom connections. The cables must be routed around the fault braces (see Detail in Figure 3 ).
Electrical Installation 7 Notes on T ables 1. Nominal input current (considered continuous) is based on full -rated output load. Maximum current includes nominal input current and ma ximum battery recharge current (considered noncontinuous). Contin uous and noncontin uous cu rrent are defined in NEC 100.
Electrical Installation 8 T able 6 Recommended lug size s Cable Size T&B Series 54000 One Hole T&B Series 54000 Two Hole #8 AWG 54930BE 54850BE #6 AWG 54905BE 256-30695-868 #4 AWG 54906BE 256-.
Installation Drawings 9 3.0 I NST ALLATION D RAWINGS Figure 1 Input/output conduit det ail dr awing, 250-3 00kV A Liebert NXL UPS OUT PU T NEUTRA L INNER P ANE L REMOVED FOR CLARIT Y SHOWN IN EXTENDE D POSI TIO N DC (2) 3 " CONDUI T NOTES: 1. ALL DIMENSIONS ARE IN inches (mm).
Installation Drawings 10 Figure 2 Input/output conduit det ail drawing, 400kV A Liebert NXL UPS NOTES: 1. ALL DIM ENSI ON S ARE IN inche s (mm ). 2. 2 4" MI NI MUM CLEARAN CE AB OVE UNI T REQ UIR ED FO R AI R EXHAUS T . 3. KE EP CABIN ET WI THI N 15 D EGREES OF VE R TI CAL.
Installation Drawings 11 Figure 3 T op cable entry routing and inst allation order The cables must be rout ed around the fault braces. This is to prevent the cables from coming in cont act with other busbars.
Installation Drawings 12 Figure 4 Bottom cable entry routing and inst allation order SIDE VIEW F AUL T BRACE OUTPU T F AUL T BRACE RECT IFI ER INPU T F AUL T BRACE BYP ASS INPU T BYP ASS NEUT RA L DC .
Installation Drawings 13 Figure 5 Floor mount bracket s—st andard and optional layout WA R N I N G Brackets MUST remain attached to the frame until the unit is being placed in its final installed position. (The final installation will always require the unit to be bolted to another Liebert NXL product.
Installation Drawings 14.
.
EmersonNetworkPower.com Ensuring The Hi gh Av ailab ilit y 0f Mission-Critic al Data And Ap plic ations. Emerson Net work P ower , the global leader in enabling business-critical continuity , ensures .
Ein wichtiger Punkt beim Kauf des Geräts Liebert Ship-Ahead Input/Output Cabinet NXL (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie Liebert Ship-Ahead Input/Output Cabinet NXL noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für Liebert Ship-Ahead Input/Output Cabinet NXL - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von Liebert Ship-Ahead Input/Output Cabinet NXL reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über Liebert Ship-Ahead Input/Output Cabinet NXL erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon Liebert Ship-Ahead Input/Output Cabinet NXL besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von Liebert Ship-Ahead Input/Output Cabinet NXL verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit Liebert Ship-Ahead Input/Output Cabinet NXL. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei Liebert Ship-Ahead Input/Output Cabinet NXL gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.