Benutzeranleitung / Produktwartung PML3XS-B des Produzenten APC
Zur Seite of 24
Inst allation and Operation Manual APC Brick Panel Product s PMF3XS-B PMJ3XS-B PMP3XS-B PMH3XS-B PMG3XS-B PML3XS-B.
The Brick Panel Product Surge Protective Devices (SPD) are designed to deliver specification grade performance at the service entrance, branch panels or other critical locations.
Installation and Operation Ma nual 3 Precautions ........ .............. .............. .............. .............. .............. .............. ... 4 Introduction .. .............. .............. .............. .............. .............. ......
4 Installation and Operation Manu al Precautions At end-of-life conditions, Surge Protective Devices ( SPDs) can lose their ability to block power system voltage and attemp t to draw excessive current from the line.
Installation and Operation Ma nual 5 Table 1: SPD Per Phase I 2 tI appar ent I p I th PM_3XS-B 175 kA 2 seconds 17,000 A RMS 40,000 A RMS 220 A CA UTION LOSS OF SURGE SUPPRESSION • Do not energize t.
6 Installation and Operation Manu al Introduction Thank you for choosing the APC SurgeArrest ® PM_3X Series “Brick” Su rge Protective Device. The APC non-modular Surge Protecti ve Device (SPD) is.
Installation and Operation Ma nual 7 D ANGER HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH • Apply appropriate p ersonal protective equipment (PPE) and foll ow safe electrical wo rk pr act ices. See NFPA 70E. • This equipment must onl y be inst alled and serviced by qualified electrical personnel.
8 Installation and Operation Manu al Unpacking and Preliminary Inspection Inspect the entire shi pping containe r for damage or sig ns of mishandling before unpacking the device. Remove the packing mate rial and further inspect the device for any obvious shipping damage .
Installation and Operation Ma nual 9 Electrical Voltage Rating Prior to mounting the SPD, verify that th e devi ce has the same voltage rating as the power distribution system in which it is installe d. Compare th e nameplate voltage or model number on the SPD with the namep late of the electrical distribution equipment.
10 Installation and Operation Manu al Terminals, Wire Size, and Installation Torque Terminals are provided for phase (line), neutral, an d equipment ground connections. The SPD termin als accept a range of 12 AWG (3 mm 2 ) to 2 AWG (34 mm 2 ) copper wire for phase, neutral, and ground conn ectors.
Installation and Operation Ma nual 11 Location of SPD Install Type 2 SPDs on the load side of th e main Overcurrent Protection De vice (OCPD) to comply with NEC Article 28 5 for Type 2 SPDs. Locate the SPD as close as possible to the circuit being ad dressed to minimize the wire length and optimize SPD perfo rmanc e.
12 Installation and Operation Manu al Grounding The SPD has leakage current to ground when energized and can present a hazardous touch voltage. The device has SPD elements conne cted from phase to ground.
Installation and Operation Ma nual 13 Installation Conduit Location and Recommendations The recommended conduit entry is at the bottom of the device enclosure.
14 Installation and Operation Manu al Wiring Follow the step s listed below when making wi ring connections. 1. Turn off all power supplying this equip ment before working on or i nside any enclosure containing this equipment.
Installation and Operation Ma nual 15 Wiring Diagrams without Integral Switch Figure 3: SIngle-Phase , T hree-Wire, Grou nded Installati on Figure 4: Three-Phase, Three- or Four-Wire, Ground ed Wye Installation Figure 5: Three-Phase, Three- or Four -Wire, High-Leg Delta Installation N 8222-0013-04 SPD A N C Made in U S A / Hecho en E.
16 Installation and Operation Manu al Operation LED Status Indicators The diagnostic display panel shows the sta tus of the SPD module with diagnostically controlled gree n/red LEDs. If a unit is operating correctly, a ll the phase LEDs will be illumin ated green.
Installation and Operation Ma nual 17 When power is applied to the SPD and one or more of the diagnostic display panel LEDs are red, and one or more modul e LEDs are out, the module sho uld be replaced. Refer to “Maintenance and Tr oubleshooting” on page 19 for prop er troubleshooting procedu res.
18 Installation and Operation Manu al Dry Contacts The SurgeArrest ® series SPDs come standard with dry contacts. The connection for the dry contacts is located on the back of the diagnostic display panel (lower right corner). The dry cont acts are 3-posi tion, Form “C” type with Normally Open, Normally C losed and Common conn ections.
Installation and Operation Ma nual 19 Maintenance and Troubleshooting Preventive Maintenance Inspect the SPD periodically to main tain reliable system performance and continued transient voltage surge suppression. Periodicall y check the state of the diagnostic displ ay panel LED status ind icators.
20 Installation and Operation Manu al Troubleshooting If a module shows two gree n indicator lights and the di splay panel shows a red phase indicator light, follow the Troubl eshooting Flow Chart in Figure 9 below. Replac ement Pa rts The following replacement part s are available.
Installation and Operation Ma nual 21.
22 Installation and Operation Manu al.
Installation and Operation Ma nual 23.
APC Worldwide Customer Support Customer support for this or other APC products is available at no charge in the fo llowing ways: • Visit the APC website to access documents in the APC Kn owledge Base and to submit customer support requests. — www.
Ein wichtiger Punkt beim Kauf des Geräts APC PML3XS-B (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie APC PML3XS-B noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für APC PML3XS-B - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von APC PML3XS-B reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über APC PML3XS-B erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon APC PML3XS-B besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von APC PML3XS-B verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit APC PML3XS-B. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei APC PML3XS-B gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.