Benutzeranleitung / Produktwartung NAV40GBL-1104 des Produzenten Anchor Hocking Glass
Zur Seite of 16
40’ Wide Gabled End System Quality , Craft smanship and Service since 1892 NA V40Gbl-1 104 Copyright © Anchor Industries 2004 Please read all assembly / installation instructions before the inst allation or removal of this product. 1 100 Burch Dr .
T ABLE OF CONTENTS Page No. Assembly S tep 3 Introduction with Frame T erminology Illustration 4 Component Illustrations 5 40’ Navi-T rac Component List T able 6 40’ Navi-T rac Component List T ab.
3 40’ Gabled Navi-T rac Frame T erminology INTRODUCTION: Like the hip-end version, the gabled end NA VI-TRAC frame is made up of extruded aluminum members joined by weldments. The aluminum frame members themselves are extruded with channels into which the NA VI- TRAC fabric “kedar” is fed.
40’ NA VI-TRAC COMPONENT ILLUSTRA TIONS 4.
40’ NA VI-TRAC COMPONENT LIST A MINIMUM GABLED UNIT CONSISTS OF (1) KIT #1, (1) KIT #2 AND (2) EXTENSION MIDS. TO EXTEND THE LENGTH FURTHER, SIMPL Y ADD ADDITIONAL EXTENSION MIDS.
6 I.D. 40’ GABLED END NA VI-TRAC LABEL (LETTER ON DRA WING) COMPONENT DESCRIPTION CODES (ST AMPED OR T APED) GBL KIT 1 GBL KIT 2 HIP KIT 3 20’ MID STR 20’ MID EXT 15’ MID STR 15’ MID EXT 10’ MID STR 10’ MID EXT ST AKES, CABLES & WEB GUYS **OPTIONS OF 10’,15’, OR 20’ BA YS MUST BE SPECIFIED.
7 NA VI-TRAC INST ALLA TION SAFETY GUIDELINES Y our installation techniques will evolve to fit the needs of your clients, the experience level of your crews, the nature of other tentage on-site, and the equipment that you have most readily available.
DIRECTIONS FOR SQUARING THE TENT 1. USE A T APE MEASURE TO MARK THE ENDS OF A LINE FOR ONE END (A TO B ABOVE) EQUAL TO THE EXACT WIDTH OF THE UNIT . 2. HOLD THE “0” END OF ONE T APE A T POINT “A” AND THE “0” END OF ANOTHER T APE A T POINT “B”.
9 1 3 4 2 6 5 CONSTRUCT FIRST BEAM LA YOUT OF ALL BEAMS MCW RW ON MID BEAMS, R WE ON END BEAMS R21-9 U8 BHW T -30 XRB FOR (X-CABLED BEAMS ONL Y) MAKE CONNECTIONS IN NUMBER SEQUENCE SHOWN. ST AKE PLA TES BEFORE ERECTING . 7 8 9 10 FIRST (2) BEAMS BUTTERFLIED SO THA T ADJACAENT BASE PLA TE ST AKES CAN BE USED FOR SAFETY GUYING .
10 ERECTING 2nd BEAM 1st SECURING THE 1st BEAM SAFEL Y ERECTING THE 2nd BEAM WORKERS LIFT FIRST A T THE PEAK, THEN SHUFFLE SIDEW A YS TOW ARD THE UPRIGHTS.
11 SECURING THE 2nd BEAM WITH DROP-IN RIDGE/EA VE BARS INST ALLING PURLINS AND RIDGE BARS COMPLETING THE 1ST BA Y IN 20’ MID BA YS ONL Y , INST ALL A SUPPORT PURLIN BETWEEN THE EA VE AND THE PURLIN A T THE MID-RAFTER LOCA TION.
12 COMPLETING THE TOP FRAME INST ALLING GABLED END FRAME INST ALLING GUY WEBS BEFORE INST ALLING F ABRIC ST AKING DISCLAIMER: DUE TO V ARYING SOIL CONDITIONS A T EACH INST ALLA TION SITE, THE ST AKES PROVIDED MA Y NOT MEET THE LOADING REQUIREMENT SHOWN ON THE BLUEPRINT AND ENGINEERING ANAL YSIS.
13 INST ALLING MID P ANEL PULL MID P ANEL UP AND OVER THROUGH CHANNELS IN RAFTER EXTRUSIONS. WHEELED P ANEL GUIDE RAFTER INSERT FINGERS OF WHEELED P ANEL GUIDE INTO THE OPEN END OF THE RAFTER AND WELDMENT . TIGHTEN THE BUTTERFL Y NUT . REVERSE FOR OPPOSITE SIDE OF BA Y .
14 COMPLETED 40’ GABLED END NA VI-TRAC WITH F ABRIC INST ALLED AND TENSIONED, GUY WEBS ST AKED AND RA TCHETED TIGHT . TO MEET ENGINEERING REQUIREMENTS W ALLS SHOULD BE INST ALLED ON ALL (4) SIDES.
15 HIP/GABLED END COMBINA TION UNIT SEE THE ST ANDARD NA VI-TRAC INST ALLA TION INSTRUCTIONS FOR ASSEMBL Y OF THE HIP END UNIT . EXTENSION BEAMS ARE PIVOTED IN THE SAME MANNER AS SHOWN ABOVE IN THIS GABLED END ASSEMBL Y INSTRUCTION.
EV ANSVILLE, INDIANA 28.3 1 1-01-02 Thank you for purchasing an Anchor product. In return, we pledge Quality , Service and Craft smanship and are available for any questions you may have or assistance you may need.
Ein wichtiger Punkt beim Kauf des Geräts Anchor Hocking Glass NAV40GBL-1104 (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie Anchor Hocking Glass NAV40GBL-1104 noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für Anchor Hocking Glass NAV40GBL-1104 - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von Anchor Hocking Glass NAV40GBL-1104 reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über Anchor Hocking Glass NAV40GBL-1104 erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon Anchor Hocking Glass NAV40GBL-1104 besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von Anchor Hocking Glass NAV40GBL-1104 verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit Anchor Hocking Glass NAV40GBL-1104. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei Anchor Hocking Glass NAV40GBL-1104 gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.