Benutzeranleitung / Produktwartung AM-50BAE-AD des Produzenten Hoshizaki
Zur Seite of 34
Hoshizaki “A Superior Degr ee of Reliability” www .hoshizaki.com Models AM-50BAE AM-50BAE-DS AM-50BAE-AD AM-50BAE-ADDS Self-Contained Cuber Hoshizaki America, Inc.
2 IMPOR T ANT Only quali ed ser vice t echnicians should install, service, or maintain the icemaker . No installation, ser vice , or maintenance should be under tak en until the technician has thor oughly r ead this Instruction Manual.
3 IMPOR T ANT This manual should be r ead car efull y bef ore the icemak er is installed and operat ed. Only quali ed ser vice technicians should inst all, ser vice , and maintain the icemak er . Read the warnings contained in this booklet car efull y as they giv e impor tant inf or mation reg arding saf et y .
4 Impor tant Saf ety Inf or mation Throughout this man ual, notices appear t o bring your at tention t o situations which could result in death, serious injur y , or damage to the unit. W ARNING Indicates a hazar dous situation which could r esult in death or serious injury .
5 I. Specications A. Construction T op P anel Ice Making Mechanism Scoop Holder F ront P anel Contr ol S witch Louv er Bin Contr ol Thermostat Bulb Slope Magnet C atch Door P ower C ord.
6 HOSHIZAKI ICE MAKER MODEL NUMBER AM-50BAE SERIAL NUMBER AC SUPPLY VOLTAGE 115-120/60/1 AMPERES 3.4 AMPS DESIGN PRESSURE HI-240PSI LO-120PSI REFRIGERANT 134a 4.2 OZ. B. Electrical Data The nameplate pr ovides electrical and refrigerant data. The nameplate is locat ed in the stor age bin.
7 C. Dimensions/Connections 1 . AM-50B AE Units: mm [in.].
8 2. AM-50BAE-DS Units: mm [in.].
9 3. AM-50BAE-AD Units: mm [in.].
10 4. AM-50BAE-ADDS Units: mm [in.].
11 II. Installation and Operating Instr uctions W ARNING 1 . This icemaker m ust be installed in accor dance with applicab le national, stat e, and local codes and regulations . 2 . CHOKING HAZARD: Ensure all components, f astener s, and thumbscre ws are secur ely in place af ter inst allation.
12 2. Built-In Installation Site C A UTION 1 . Do not let the weight of the count er r est on the icemak er . 2. Do not install the icemak er in a cor ner where the door will int erfer e with other equipment or where the icemak er cannot be pulled out for service.
13 C. Door 1 . AM-50B AE, AM-50B AE-AD a) Hinge R ev er sal If you w ould lik e t o r e ver se the door hinges , f ollow the steps belo w . Otherwise, skip t o section"II.D . Setup ." 1) W hile maintaining a hold on the door , remo v e the hinge st op pin fr om hinge (B).
14 4) Remo ve hinge (B) fr om the right side of the unit and the 2 ller scr e ws fr om the lef t side. At tach the 2 ller scr e ws t o the right side and at tach hinge (B) t o the lef t side. See F ig . 4. 5) Rot at e the t op panel 1 80° from its pr evious position.
15 1 2 3 4 6 5 2. AM-50BAE-DS, AM-50B AE-ADDS a) Over lay P anel F abr ication and Attac hment IMPOR T ANT The ov er la y panel must be craf ted b y a prof essional cabinet maker t o ensur e quality results. (1) P arts Ensure that all parts required f or the ov er la y panel assembl y ar e contained in the accessories bag.
16 ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) (2) Over lay P anel Specication Use the specication that applies to y our icemaker (AM-50B AE -DS or AM-50BAE -ADDS ) and the directions that f ollow t o prepare y our ov erla y panel.
17 ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) AM-50B AE-ADDS O verla y Panel Specication Ov erlay P anel Height 279/1 6"(700mm) Ov erlay P anel W idth 1 41 3/1 6"(37 6mm) Ov erlay P anel Thickness 5/8"(1 6mm)minimum; 3/4"(1 9mm)maximum Ov erlay P anel and Door W eight (t otal) 20 lb .
18 3)Scre wthe6threadedwoodinser tsint othe1/4"holesdr illedinthepr e viousstep . Make sure that the inserts are threaded str aight and that the t ops of the inser ts ar e ush t o the ov er la y panel surface .
19 Scre ws f) Remo ve hinge (C1) fr om the t op right par t of the door , ip it and r eat tach to the bot tom lef t. R emov e hinge (C2) from the bot tom right par t of the door , ip it and reat tach t o the top lef t. See F ig . 1 5. P roceed t o st ep 7 .
20 9) T emporar il y fast en the ov erlay panel t o the door using 2 of the M4×25 pan head scre ws pro vided. See Fig . 1 8. C A UTION Ensure that the bac k surface of o verlay panel is at bef or e at taching . 1 0) Mark the center point of the hinge (C1) and hinge (C2) holes that e xtend o v er the ov er la y panel.
21 Snug the scr ews , but do not tight en. Sheet Metal Brac ket Ov erlay P anel Tight en the screws . 5) F asten the o verlay panel t o the door using the four M4×25 pan head scr ews pr ovided. Snug the screws , but do not tight en. See F ig . 24. 6) F asten the sheet met al brac ket t o the bot tom of the door with the thr ee T2 screws pro vided.
22 7) Tight en the four M4×25 pan head scr ews installed in st ep 5. See Fig . 26. 8) Replace the door g asket in its pr oper orientation. Reinser t the bushings int o hinge (C1) and hinge (C2) (the hinges at tached to the door). See F ig. 27 . C anoe Clips F ig.
23 D . Set up 1) P osition the icemaker in the select ed per manent location. 2) Le v el the icemaker fr om side-to-side and fr ont-to-r ear b y adjusting the f eet. E. Electrical Connection W ARNING 1 . Electr ical connection m ust meet national, stat e, and local electrical code requir ements.
24 F . W ater Suppl y and Dr ain Connections W ARNING 1 . W ater suppl y and drain connections must be installed in accor dance with applicable national, st at e , and local r egulations. 2. Normal operating wat er t emperatur e should be within 45°F to 95°F (7°C to 35°C).
25 G. F inal Chec klist W ARNING CHOKING HAZARD: Ensure all components , fast eners, and thumbscr ews ar e securel y in place af t er installation. Make sur e that none hav e f allen into the stor age bin.
26 H. Star t up W ARNING 1 . All par ts are f actory-adjust ed. Improper adjustments ma y adver sely af f ect saf ety , performance, component lif e, and warranty cov erage. 2. If the icemak er is turned of f , w ait f or at least 3 minutes bef ore r estar ting the icemaker t o pre vent damage t o the compr essor .
27 III. Cleaning and Maintenance W ARNING 1. CHOKING HAZARD: Ensur e all components, f ast ener s, and thumbscr ews are secur ely in place af ter an y cleaning or maint enance is done t o the unit. Make sur e that none hav e fallen int o the st orage bin.
28 3) Inside the stor age bin, disconnect the suction tube b y squeezing the tabs and pulling the tube clear . See F ig . 33. Allow the w at er tank t o drain. 4) Reconnect the suction tube as illustr at ed. See Fig . 34. Make sur e the tabs lock int o place; a loose t ting ma y cause a water leak.
29 3. Sanitizing Solution IMPOR T ANT F or saf et y and maximum ef f ectiveness , use the solution immediat ely af ter dilution. Dilute 0.5 . oz. (1 4.8 ml or 1 tbs) of a 5.25% sodium h ypochlor it e solution (chlorine bleach) with 1 g allon (3.8 l) of war m w ater .
30 Reducing Pipe Rail Rail 1 3) P osition and lock the ice chut e ont o the fr ont and r ear frame pipes b y pushing the ice chute do wn until it clicks ont o both frame pipes . See Fig . 43. 1 4) Slide in the wat er tank along the r ails at the bot tom of the lef t and right brack ets until it locks int o place.
31 1 5) Reconnect the suction tube . 1 6) Hook each separator ont o the rail, then pull it hard t owar ds you until it loc ks into place . See F ig . 45. 1 7) Replace the slope in its corr ect position. See Fig . 46. F ig. 45 1 8) Discard the sanitizing solution.
32 B. Maintenance IMPOR T ANT This icemaker m ust be maintained individuall y , ref erring to the instruction manual and labels pr o vided with the icemak er . 1 . Stainless St eel Exter ior T o pre vent corr osion, wipe the e xterior occasionally with a clean and sof t cloth.
33 C. Pr eparing the Icemak er f or Long Stor age C A UTION When st or ing the icemak er for an e xtended time or in sub-fr eezing temper atur es , f ollow the instructions below to pr ev ent damage.
34 HOSHIZAKI AMERICA, INC. 618 Hwy . 74 S., Peachtree Cit y, GA 30269 USA TEL (770) 487-2331 F AX (770) 487-3360 www.hoshizaki.com 91A1VG10E.
Ein wichtiger Punkt beim Kauf des Geräts Hoshizaki AM-50BAE-AD (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie Hoshizaki AM-50BAE-AD noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für Hoshizaki AM-50BAE-AD - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von Hoshizaki AM-50BAE-AD reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über Hoshizaki AM-50BAE-AD erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon Hoshizaki AM-50BAE-AD besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von Hoshizaki AM-50BAE-AD verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit Hoshizaki AM-50BAE-AD. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei Hoshizaki AM-50BAE-AD gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.