Benutzeranleitung / Produktwartung PM3 des Produzenten American Power Conversion
Zur Seite of 24
Sur geArrest ® PM Series PM3, PM4, and PM4Y Series Modular Surge Protective Device (SPD) User ’ s Manual American Power Conversion Corporation 132 Fairgrounds Road P .
.
INTRODUCTION ......................................................................................................................................... 1 Installation .....................................................................................
Contents Sur geArrest ® PM Series FIGURES Figure 1 - T ypical Parallel Connections ........................................................................................ ........ 4 Figure 2 - Basic PM3 and PM4 Configuration with Disconnect Switch Option .
INTRODUCTION Thank you for choosing the APC SurgeArrest PM3, PM4, or PM4Y Series Sur ge Protective Device. The APC modular Sur ge Protective Device (SPD) is a high quality , high ener gy surge attenuation system that has been designed to protect sensitive equipment from damaging transient voltage surges.
Unp acking and Preliminary Inspection • Inspect the entire shipping container for damage or signs of mishandling before unpacking the unit. • Remove the cardboard packing and further inspect the unit for any obvious shipping damages.
Page 3 Service Clearance In addition to national and local code requirements, 36 inches of service clearance is needed at the front of the SPD. Equipment Performance T o obtain the maximum system performance, the unit must be located as close to the circuit to be protected as possible, minimizing the interconnecting wire length.
Figure 1. T ypical Parallel Connections NOTE: Safety Ground required for ALL units. Page 4 T able 2: V oltage Rating and Service T ype (by Model) T erminals T erminals have been provided inside the APC modular SPD units for the line (phase), neutral, and equipment safety ground connections.
Wiring Size & Inst allation T orque W ith a parallel connection, the size of the wiring to the SPD is independent of the ampere rating of the circuit to be protected. The recommended wire size is based on the unit’ s transient surge current capabilities.
Page 6 PM SERIES INST ALLA TION INSTRUCTIONS (T ypical Unit - Three Phase WYE, 4 Wire, plus Ground) This section provides basic installation instructions for the PM Series SPD. Per UL 1449 Paragraph 1.4, SPD’ s “are intended for installation on the load side of the main overcurrent protection”.
Page 7 Figur e 3: Basic PM3 and PM4 Configuration and Wiring Diagram (3-Phase WYE, 4-W ire, plus Ground).
Page 8 5/16” Mounting Hole (4 places) Phase A Phase B Connectors Phase C Connector Ground Conductor Not to exact scale. Door removed for clarity Fuse (9 places) Mounting Flange (4 places) Surge Module with LED (9 places) Disconnect Figur e 4.
Operation and Features SPD’ s do not require a great deal of operator intervention after installation. NOTE: The PM Series has a green LED for each phase which extinguishes when the module is no longer providing protec- tion (fault condition).
Page 10 Surge Counter Option In units so equipped, the surge counter option provides a means to total the number of transient voltage sur ges encountered since the counter was last reset. The sur ge counter circuitry includes a “supercap”. This will provide power up to four days to retain memory should a power outage occur .
Periodic Inspection and Cleaning Inspection of the SPD should be performed periodically to maintain reliable system performance and continued transient voltage sur ge protection.
Figure 6: T roubleshooting Flowchart Page 12.
• MAINTENANCE OF THIS SURGE PROTECTIVE DEVICE SHOULD BE PERFORMED BY QUALIFIED ELECTRICAL PERSONNEL ONL Y . • DURING NORMAL OPERA TION, HAZARDOUS VOL T AGES ARE PRESENT INSIDE THE UNIT . • WHEN SERVICING THIS UNIT , BE SURE T O FOLLOW ALL ELECTRICAL SAFETY PRECAUTIONS.
Diagnostic Board Removal & Replacement Instructions T o remove the Diagnostic Board, refer to Figure 8 and proceed as follows: 1. Disconnect power to the SPD. 2 . Remove the board from the standof fs. 3. Remove the connectors one at a time from the existing board and insert them into the appropriate connector on the replacement board.
Surge Module Removal & Replacement Instructions Sur ge modules within the SPD may become damaged and require replacement. T o remove and replace a surge module, refer to Figure 9 and proceed as follows: 1. Disconnect power to the SPD. 2. Open the door on the unit by loosening the two screws that secure the door latches in place.
T able 4: Replacement Parts List Replacement Part s Listing APC offers the items listed in T able 4 as field replaceable items. Page 16 l e d o M C P A r e b m u N m e t s y S e g a t l o Vn o i t p i.
Page 17 LIMITED W ARRANTY APC warrants it’ s AC Panel protection products against defective workmanship and materials for 5 years from the date of original purchase. The panel protection device must be installed by a qualified and licensed electrician in order to qualify fo r warranty protection.
.
.
American Power Conversion Corporation 132 Fairgrounds Road P .O. Box 278 W est Kingston, Rhode Island 02892 USA www .apc.com.
Ein wichtiger Punkt beim Kauf des Geräts American Power Conversion PM3 (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie American Power Conversion PM3 noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für American Power Conversion PM3 - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von American Power Conversion PM3 reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über American Power Conversion PM3 erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon American Power Conversion PM3 besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von American Power Conversion PM3 verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit American Power Conversion PM3. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei American Power Conversion PM3 gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.