Benutzeranleitung / Produktwartung PD150G6F des Produzenten American Power Conversion
Zur Seite of 84
150 kW InfraStruXur e PDU PD150G6F PD150L6F 480 V/ 600 V Input Operation and Configuration.
.
150kW InfraStruXure PDU—Operation and Configuration i About this Manual This manual is intended for end- users of a 150 kW InfraStruXure P DU. It covers the operation and quick-configuration of the PDU, and includes basic InfraStruXure system operation.
.
Contents 150kW InfraStruXure PDU—Operatio n and Configuration iii Safety ............................. ........................ ................. 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions .
iv 150kW InfraStruXure PDU—Operatio n and Configuration Volt-Meter Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Contacts Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Breakers Screen .
150kW InfraStruXure PDU—Operation and Configuration v Configuring the Network Management Interface . . . . . . . . . . . 37 Connect the InfraStruXure PDU to your network . . . . . . . . . 37 Configuration Overview . . . . . . . . . . . . . . . . . .
vi 150kW InfraStruXure PDU—Operation and Configuration How to Download Firmware Updates . . . . . . . . . . . . . . . . . . . 62 Specifications .................. ........................ .............. 63 150 kW InfraStruXure PDU . . . . . . . . . .
150kW InfraStruXure PDU—Oper ation and Configuration 1 Safety Over view Save these instru ctions This manual contains important instructions t hat must be followed during installation, operation, and configuration of th e InfraStruXure PDU.
2 150kW InfraStruXure PDU—Op eration and Configuration Wa r n i n g s Receiving/moving Do not tilt the PDU greater than 45° from its vertical axis. Never lay the PDU on its side.
Safety: Warnings 150kW InfraStruXure PDU—Oper ation and Configuration 3 T otal power off procedur e 1. Set the PDU Main Input switch to OFF . 2. Set the upstream circuit breaker of the power source to OFF . Emer gency Power Off (EPO) Hazardous voltage from the branch circuit must be isolated from the 24 V AC, 24 VDC, and contact closure.
Safety: Warnings 4 150kW InfraStruXure PDU—Op eration and Configuration EMI This equipment has been tested and found to comp ly with the limits for Class A digital devices, pursuant to Part 15 of the FCC Rules.
150kW InfraStruXure PDU—Operation and Configuration 5 Over view InfraStruXur e PDU Components The APC 150 kW InfraStruXure PDU provid es distribution and management of electrical power .
6 150kW InfraStruXure PDU—Operation and Configuration InfraStruXur e PDU Fr ont view The PDU power cables feed equipment racks; they are fed through the knockout pane ls on the top of the PDU.
Overview: InfraStruXure PDU 150kW InfraStruXure PDU—Operation and Configuration 7 Fr ont view (interior) The Main Output circuit breaker protects the distribution circuit break er panels. The optional sub-feed output circuit breake rs offer a means to distribute higher blocks of power to o ther equipment or distribution units.
Overview: InfraStruXure PDU 8 150kW InfraStruXure PDU—Operation and Configuration Rear view The document pocket provides stor age of documents related to the InfraS truXure PDU.
Overview: InfraStruXure PDU 150kW InfraStruXure PDU—Operation and Configuration 9 Rear view (interior) The PDU monitoring unit receives signals from several current and voltage monitoring boards that report to a cen tral board assembly located in the PDU monitoring unit.
Overview: InfraStruXure PDU 10 150kW InfraStruXure PDU—Operation and Configuration PDU monitoring unit The EPO DIP switches configure the EPO input for th e type of EPO switch that is connected—Normally Open (NO) or Normally Closed (NC).
Overview: InfraStruXure PDU 150kW InfraStruXure PDU—Operation and Configuration 11 The Display port (RJ-45) connects the PDU monito ring unit to the display interface.
Overview: InfraStruXure PDU 12 150kW InfraStruXure PDU—Operation and Configuration User connection plate For a description and location of the user connection plate, see ( ) on page 6. For clarity , the user connection plate in the illustration below is shown in greater detail.
150kW InfraStruXure PDU—Operation and Configuration 13 PDU Display Interface Over view Use the display interface to config ure settings, set alarm thresholds, and provide audible and visual alarms.
PDU Display Interface: Overview 14 150kW InfraStruXure PDU—Operation and Configuration T op-level status screens After system start-up, the display interface displays a brief start-up screen and then scrolls automatically and continuously through four screens of basic status information.
PDU Display Inte rface: Overview 150kW InfraStruXure PDU—Operation and Configuration 15 On some screens, continue arrows ( indicate that there are additional screens to view in the category . Press the Up or Down arrow key to vi ew the additio nal screens.
16 150kW InfraStruXure PDU—Operation and Configuration Load-Meter Scr een From the Load-Meter screen, you can select the following items: T otal Load by Phase The load supported by each phase in kilovolt-a mperes (kV A) , in RMS current (Irms) , and as a percentage of the maximum allowable load (%LD) .
150kW InfraStruXure PDU—Operation and Configuration 17 V olt-Meter Scr een From the V olt-Meter sc reen, you can select the following items: Output V oltage Displays each phase-to-phase output voltage (e.g., L1-2 for phase L1 to phase L2) and each phase-to-neutral output voltage (e.
18 150kW InfraStruXure PDU—Operation and Configuration Contacts Scr een The PDU can monitor external contact closure even ts. Possible applications include the following: • Magnetic contact switch.
PDU Display Interface: Contacts Screen 150kW InfraStruXure PDU—Operation and Configuration 19 Alarm Relay Map Configure the relay outputs, using the Alarm Relay Map. Each Alarm Map corresponds to a relay output. For example, Alarm Map 01of04 corresponds to the fi rst of four relay outputs.
PDU Display Interface: Contacts Screen 20 150kW InfraStruXure PDU—Operation and Configuration How to connect contacts to the PDU monitoring unit. 1. Choose one or more contact number (s) on the User/EPO contacts port on the user connection plate to w hich you will connec t the contacts.
150kW InfraStruXure PDU—Operation and Configuration 21 Br eakers Scr een Use the Breakers screen to view the status of the system and PDU circuit breakers. Main Input Reports status of PDU Main Input breaker ( Open or Closed ). Under normal operation, this switch is Closed .
22 150kW InfraStruXure PDU—Operation and Configuration Alarms Scr een View Active Alarms Use this option of the Al arms screen to display active alarms (alarm s that have not been resolved).
PDU Display Interface: Alarms Screen 150kW InfraStruXure PDU—Operation and Configuration 23 Alarm Setup Use this option of the Al arms screen to access the following options: Alarm Beeper Use this option of the Al arms screen to turn the alarm beeper ON or OFF .
PDU Display Interface: Alarms Screen 24 150kW InfraStruXure PDU—Operation and Configuration PDU Alarms This table lists all alarms that can be generate d by the InfraStruXure P DU, as displayed by the All Possible Alarms option, with numeric variables between the < > characters.
150kW InfraStruXure PDU—Operation and Configuration 25 Panel Scr een Branch Ckt Loading Y ou can display Branch Ckt Loading (Branch Circuit Loading) stat us if the option to measure current at the distribution ci rcuit breakers is installed. Y ou can view data for each individual panel positio n on the distribution panel.
PDU Display Interface: Panel Screen 26 150kW InfraStruXure PDU—Operation and Configuration Panel Configuration Configure the branch metering se ttings for each circuit breaker on the distribution panel, or con figure both pane ls simultaneously . T o configure a circuit breaker , selec t the range that includes the circuit breaker .
PDU Display Interface: Panel Screen 150kW InfraStruXure PDU—Operation and Configuration 27 Global Panel Config Configures the same number of poles or circuit br eaker ratings for all circuit breakers in both distribution panels simultaneously .
28 150kW InfraStruXure PDU—Operation and Configuration Config Scr een System/Network Use this option of the Co nfig screen to access these options: System Password • Password : Change the system password required to access protected screens and fields in the display interface.
PDU Display Interface: Config Screen 150kW InfraStruXure PDU—Operation and Configuration 29 Electrical Config This option of the Config scre en displays informat ion about the electrical serv ice that provides input to the InfraStruXure PDU. All of th e values displayed on this screen are set at the factory .
PDU Display Interface: Config Screen 30 150kW InfraStruXure PDU—Operation and Configuration System ID Use this option of the Config screen to identify your InfraS truXu re PDU. The following fields can be configured: Factory Defaults Use this option of the Co nfig screen to reset all InfraStruXure PDU settings to their factory default values.
150kW InfraStruXure PDU—Operation and Configuration 31 Operation How to Apply Power to the System 1. Close (turn ON) the m ain circuit breaker of the power source supplying p ower to the InfraStruXure PDU. 2. Close (turn ON) the Main Input on the InfraStruXure PDU.
Operation: How to Apply Power to the System 32 150kW InfraStruXure PDU—Operation and Configuration c. Close (turn ON) the subfeed breakers (if applicable ).
150kW InfraStruXure PDU—Operation and Configuration 33 How to Ensur e T otal Power Off 1. Open (turn OFF) th e main circuit breaker on the power source feeding the PDU.
.
150kW InfraStruXure PDU—Oper ation and Configuration 35 Communication Configuration InfraStruXur e PDU Management Options Overview Y ou have two management options for the InfraSt ruXure PDU.
36 150kW InfraStruXure PDU—Operation and Configuration Configuring the InfraStruXur e Manager Connect the InfraStruXur e PDU to the InfraStruXure Mana ger 1. Connect a Cat-5 ne twork cable to the surge-protected ethernet port on the PDU user connection plate.
150kW InfraStruXure PDU—Oper ation and Configuration 37 Configuring the Network Management Interface Connect the InfraStruXur e PDU to your network 1. Connect a Cat-5 ne twork cable to the surge-protected ethernet port on the PDU user connection plate.
Communication Configu ration: Configuring the Network Management Interface 38 150kW InfraStruXure PDU—Operation and Configuration TCP/IP configuration methods Use one of the following methods to def.
Communication Configurat ion: Configuring the Network Management 150kW InfraStruXure PDU—Oper ation and Configuration 39 BOOTP & DHCP configuration The Boot Mode Setting, a TCP/IP option in the InfraS truXure PDU’ s Network menu, identifies how the TCP/IP settings will be defi ned.
Communication Configu ration: Configuring the Network Management Interface 40 150kW InfraStruXure PDU—Operation and Configuration 3. When the InfraStruXure PDU re boots, the BOOTP server provid es it with the TCP/IP settings.
Communication Configurat ion: Configuring the Network Management 150kW InfraStruXure PDU—Oper ation and Configuration 41 See your DHCP server documentation to add code to the V endor Specific Information option. T o disable the APC cookie requir ement, see “Local access to the control console” on page 42.
Communication Configu ration: Configuring the Network Management Interface 42 150kW InfraStruXure PDU—Operation and Configuration Local access to the contr ol console Y ou can use a local comp uter that connects to the InfraS truXure PDU through the console po rt on the InfraStruXure PDU monitoring un it to access the control console.
Communication Configurat ion: Configuring the Network Management 150kW InfraStruXure PDU—Oper ation and Configuration 43 2. Use Ping with a size of 1 13 bytes to assign the IP address defined by the ARP command. For the IP address defined in step 1, use one of the following Ping commands: – W indows command format: ping 156.
44 150kW InfraStruXure PDU—Operation and Configuration How to Access a Network Management Interface on a Configur ed InfraStruXur e PDU We b i n t e r f a c e As your browser, you can use Microsoft ® Intern et Explorer 5.0 (and higher) or Netscape ® 4.
Communication Config uration: How to Access a Network Management 150kW InfraStruXure PDU—Oper ation and Configuration 45 T elnet for basic access. T elnet provides the basic security of authentication by user name and password, but not the hi gh-security benefits of encr yption.
Communication Configurat ion: How to Access a Network Management Interface on a Configured InfraStru Xure PDU 46 150kW InfraStruXure PDU—Operation and Configuration FT P a n d S C P Y ou can use FTP.
150kW InfraStruXure PDU—Oper ation and Configuration 47 How to Recover Fr om a Lost Network Management Interface Passwor d 1. Select a serial port at the local computer , and disable any service tha t uses that port.
.
150kW InfraStruXure PDU—Oper ation and Configuration 49 Customizing and Updating the PDU Important Safety Instructions War n in g APC does not r ecommend that you perform maintenance of the PDU while it is recei ving input power . However , due to the critical nature of data center loads, this may occur .
50 150kW InfraStruXure PDU—Operation and Configuration PDU Or derable Part List Breakers PD1P20ABBSD single- pole, 20-amp breaker PD3 P20ABBSD three- pole, 20-amp breaker PD1P50ABBSD single-pole, 50.
Customizing and U pdating the PDU 150kW InfraStruXure PDU—Oper ation and Configuration 51 Power Cables 30 A, 3-wire power cables 20 A, 3-wire power cables SKU Number Description SKU Number Descripti.
52 150kW InfraStruXure PDU—Operation and Configuration How to Add Cir cuit Br eakers and Power Cables Add a cir cuit brea ker on the PDU 1. Snap and bolt the new circuit breaker into a position on the panel. 2. Remove the corresponding plastic blanking plate on the front panel of the PDU.
Customizing and U pdating the PDU 150kW InfraStruXure PDU—Oper ation and Configuration 53 4. At the front of the PDU, connect the power cord’ s individual wires: a. If you have branch current monitoring installe d, route the phase cond uctor through a current sensor .
54 150kW InfraStruXure PDU—Operation and Configuration How to Add a Sub-Feed Output Cir cuit Br eaker to the PDU and Connect a Sub-Feed Power Cable Overview As an option, you can add 1 50- or 225-amp sub-feed output circuit breakers ( ) to the two (2) mounting bracket positio ns provided on your 150 kW InfraStruXure PDU.
Customizing and U pdating the PDU 150kW InfraStruXure PDU—Oper ation and Configuration 55 How to attach the cir cuit br eaker to the mounting brackets 1.
Customizing and Updating th e PDU 56 150kW InfraStruXure PDU—Operation and Configuration How to connect the sub-feed cable to the cir cuit breaker 1. Use a knockout punch to create an appropriately-sized hole in either the top or bottom gland plate on th e PDU through which you will route the sub-feed cable.
150kW InfraStruXure PDU—Oper ation and Configuration 57 How to Connect User Input Contacts and Relay Outputs to the PDU User Connection Plate Overview Make contact closure connections (NO or NC) at the us er connection plate to monitor dry c ontacts.
Customizing and Updating th e PDU 58 150kW InfraStruXure PDU—Operation and Configuration How to connect contacts to the PDU monito ring unit 1. Choose one or more contact number(s) on the User/EPO contacts port on the user connection plate to w hich you will connec t the contacts.
150kW InfraStruXure PDU—Oper ation and Configuration 59 How to Connect an EPO Switch to the PDU and T est the Switch Overview Connecting the switch. The Emergency Power Of f (EPO) switch connects to the PDU user connection plate. The figure on the right show s the location of the user co nnection plate on th e roof of the PDU.
Customizing and Updating th e PDU 60 150kW InfraStruXure PDU—Operation and Configuration Connect an EPO switch to t he user connection plate and t est the swit ch 1. Connect the switch to the EPO connection point terminals located on the bottom side of the PDU user connection plate.
Customizing and U pdating the PDU 150kW InfraStruXure PDU—Oper ation and Configuration 61 3. T est the EPO switch to ensure that it is wired and working correctly: a.
Customizing and Updating th e PDU 62 150kW InfraStruXure PDU—Operation and Configuration Safety warnings Hazardous v oltage from the branch c ircuit must be isolated from the 24 V AC, 24 VDC, and contact closure.
150kW InfraStruXure PDU—Oper ation and Configuration 63 How to Download Firmwar e Updates Fr om a local computer 1. Select a serial port at the local computer, and disable any service that uses that port. 2. Use the configuration c able to connect the se lected port to the console port on the PDU monitoring unit.
.
150kW InfraStruXure PDU—Oper ation and Configuration 65 Specifications 150 kW InfraStruXur e PDU Electrical PD150G6F PD150L6F Input Nominal voltage 480 V , 3-phase 600 V , 3-ph ase V oltage AC 3-phase, 3- wire 3- phase, 3-wire Frequency 60 Hz , ±3 Hz 60 Hz, ±3 Hz Max.
Specifications: 150 kW Inf raStruXure PDU 66 150kW InfraStruXure PDU—Operation and Configuration Tr a n s f o r m e r T ype Step-down Configuration Delta to WYE W arranty 2 years parts Environmental.
150kW InfraStruXure PDU—Oper ation and Configuration 67 Pr oduct Information Wa r r a n t y InfraStruXur e Standard W arranty APC warrants that all components of the InfraS truXure system will be fr.
Product Informati on: Warranty 68 150kW InfraStruXure PDU—Operation and Configuration CONNECTION WITH THE PRODUCTS. THE FOREGOING W ARRANTIES AND REMEDIES ARE EXCLUSIVE AND IN LIEU OF ALL OTHER W ARRANTIES AND REMEDIES.
150kW InfraStruXure PDU—Oper ation and Configuration 69 Life-Support Policy APC Thr ee-P hase Systems American Power Conversion Corporation (APC) and its af filiates and subsidiaries worldwide do no.
70 150kW InfraStruXure PDU—Operation and Configuration How to Obtain Ser vice How to contact APC Customer support for this or any other APC product is available at no charge in any of the following ways: • V isit the APC W eb site to access documents in the APC Knowledge Base and to submit any customer support requests.
Index 150kW InfraStruXure PDU—Oper ation and Configuration 71 A Agency approvals , 64 Alarm beeper , 23 Alarm LED , 13 Alarm relay map , 19 Alarm setup , 23 Alarm types , 24 Alarm/event log , 22 Ala.
72 150kW InfraStruXure PDU—Operation and Configuration K Keys, for navigation , 13 L LCD, on displa y interface , 13 LEDs, on display interface , 13 Leveling feet, location of , 6 Life-support polic.
.
.
.
*990-1984* APC W orldwide Customer Support Customer support for this or any other APC product is available at no char ge in any of the following ways: • V isit the APC W eb site to access documents in the APC Knowledge Base and to submit customer support requests.
Ein wichtiger Punkt beim Kauf des Geräts American Power Conversion PD150G6F (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie American Power Conversion PD150G6F noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für American Power Conversion PD150G6F - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von American Power Conversion PD150G6F reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über American Power Conversion PD150G6F erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon American Power Conversion PD150G6F besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von American Power Conversion PD150G6F verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit American Power Conversion PD150G6F. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei American Power Conversion PD150G6F gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.