Benutzeranleitung / Produktwartung CTSLP/G des Produzenten American Power Conversion
Zur Seite of 14
990-5518 A 10/2004 BroadBand CTSLP/G Uninterruptible Power Suppl y 60 VAC User Manual.
.
1 990-5518 0 3/02 Chapter 1 General Informati on The SLP/G Series St andby Power Su pply provi des an unint erruptible pow er source for bro adband cable operations. Batteries are housed inside the module. A battery vault may be used to provide additional battery backup.
2 990-5518 0 3/02 Spec ifications Environment al Specifi cations Oper ating T emp erature -40º F to + 140º F (-40º C to + 60º C) Humidity 5% to 95% no nconde nsi ng within encl osure Physical Spe cifications Char acteristi c Specifi cation Height Pole Mount Gro und Mo unt 18 ″ (4 5.
3 990-5518 0 3/02 Chapter 2 Installation and Maintenance Only trained service personnel should install and mainta in the Power Supply. Prior to installing the Po w er Supply AC line voltage must be routed to th e enclosure.
4 990-5518 0 3/02 SLG Enclosure Ins tallation Locate an installation site and setup the con crete pad accordin g to local building code requ irements. See the figure below for pad details. 1. Remove the rear panel of the ground mount skirt (four, #8 Phillips head screws).
5 990-5518 0 3/02 SLP Enclosure Insta llatio n Wall Mount Uni ts: Select fasteners that will accommodate the weight o f the unit including batteries. Wiring Unlock and open the enclos ure door. The open doo r is desig ned to eith er rest on the top ed ge of the enclosure or slide into th e enclosure.
6 990-5518 0 3/02 Installing Batteri es Ensure that the battery break er is in the OFF posit ion during ba ttery installa tion. The batteries fit into a batter y tray that is installed on the top shelf of the enclosure. The Thermal Switch provides temperature con trol during battery charg e.
7 990-5518 0 3/02 Installing Modules Fer ro reso na nt Mod ul e Inst all ati on 1. Switch the AC circuit bea ker to the OFF position. 2. Locate the pin conn ector on the enclosu re. Slid e the FLM into the enclosure. The guide pin on the FLM will snap into the connector on t he enclosure.
8 990-5518 0 3/02 Chapter 3 Operation Initia l Star tup 1. Switch the AC circuit breaker to the ON po sition. 2. Verify that the FLM and SLM circuit breakers are switched to the ON position. 3. Al low 15 seconds for th e SLM to run th rough the tim e delay cycle.
9 990-5518 0 3/02 FLM Index Ite m Description 1 Aux iliary AC I nput Pl ug Pro vides co nnec tion po int to oper ate P owe r Supply fr om a ge nerato r. 2 AC A uxiliary Receptacl e Prov ides access to utili ty po wer f or field to ols, l ights, etc. 3 Am meter ( optional ) Displ ays o utput c urrent w hile in nor mal mo de.
10 990-5518 0 3/02 SLP /G Enclo sure Bot tom Vi ew Index Ite m Description 1 A C input Entry point f or A C line condu it. 2 Nor mal/Main Indica tor L ED Gree n LE D, ill uminate s duri ng no rmal oper ation of FL M powe r suppl y. 3 Standb y/Main Red LED, i llumina tes durin g SLM backup op eration .
11 990-5518 0 3/02 Chapter 4 Service, Contact and Warrant y Information Service APC makes ev ery effort to ensure parts an d equipm ent arrive in working condition. Occasionally, it may be necessary to return parts or equipment that are not in working condition.
12 990-5518 0 3/02 Limited Warranty America n Power Conversi on (APC) warrant s its produ cts to be free from d efects i n materi als and workman ship for a peri od of two years from th e date of pu rchas e. Its obli gation und er thi s warranty is limited to repair ing or repla cing, at its own sole opti on, an y such defect ive p roduct s.
Ein wichtiger Punkt beim Kauf des Geräts American Power Conversion CTSLP/G (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie American Power Conversion CTSLP/G noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für American Power Conversion CTSLP/G - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von American Power Conversion CTSLP/G reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über American Power Conversion CTSLP/G erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon American Power Conversion CTSLP/G besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von American Power Conversion CTSLP/G verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit American Power Conversion CTSLP/G. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei American Power Conversion CTSLP/G gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.