M-2854-S Released 8/1/90 Overhaul Manual PVE V ariable Pump 12–21 USgpm capacity at 1800 rpm Vickers ® Piston Pumps.
2 T able of Contents Section Page I. Introduction 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A. Purpose of Manual 3 . . . . .
3 Section I – Introduction A. Purpose Of Manual This manual describes operational characteristics and overhaul information for the PVE12, 19(*) and the PVE21(*) – ** variable displacement piston pumps. The information contained herein pertains to the latest design series as listed in T able 1.
4 C-10 – CG-10 – CV -10 – CVP-12 – CVPC-12 – Pressure compensated (PVE19, 250-3000 psi) (PVE21, 250-2700 psi) Remote control pressure compensator adjustable from 350-3000 psi using and external relief valve.
5 Figure 1. Sectional Views of the PVE Pumps Drive Shaft PVE19 Section View PVE12 Section View Housing Rotating Group T apered Roller Bearing Y oke W afer Plate Compensator Y oke Housing Compensator V.
6 Section II – Description A. General Assembly of a typical pump package is shown in Figure 1. Six types of compensator subassemblies are used with the PVE series pumps. Refer to Section III for principles of operation. See Model Code for pressure settings.
7 Section III – Principles of Operation A. Piston Pump Rotation of the pump drive shaft causes the cylinder block, shoe plate and pistons to rotate. See Figure 2. The piston shoes are held against the yoke face by the shoe plate. The angle of the yoke face imparts a reciprocating motion to each piston within the cylinder block.
8 Figure 3. Flat Cut-Off Compensator Compensator Spring Drain Pump Load Cross Hole (Open to Spring Area) Compensator Spool Y oke Stroking Piston Rotating Group Y oke Spring Inlet Outlet D.
9 Figure 4. Load Sensing Compensator (CV). Compensator Spring Drain Compensator Spool Y oke Stroking Piston Rotating Group Y oke Spring Inlet Outlet Actuator Load External V alve Spool Orifice ( n P-Pressure Drop) Relief V alve Circuit Operation At Minimum Pressure Refer to Figure 4 during the following description.
10 External V alve Spool Orifice Size Increased If the external valve spool orifice size is increased, pump outlet pressure will decrease, lowering force against the compensator spool. (See Figure 4.) The compensator spring causes the spool to move, opening the yoke stroking piston to case drain.
11 Figure 5. Load Sensing Pressure Limiting Compensator (CVP , CVPC, CVPD) Compensator Spring Drain Compensator Spool Y oke Stroking Piston Rotating Group Y oke Spring Inlet Outlet Actuator Load Exter.
12 Section IV – Installation and Operating Instructions A. Installation Drawings The installation drawing listed in T able 2 will show installation dimensions and port locations. B. Mounting and Drive Connections CAUTION Pump shafts are designed to be installed in couplings with a slip fit.
13 Sound Level Noise is only indirectly affected by the fluid selection, but the condition of the fluid is of paramount importance in obtaining optimum reduction of system sound levels. Some of the major factors affecting the fluid conditions that cause the loudest noises in a hydraulic system are: 1.
14 Section V – Service and Maintenance A. Service T ools The following standard tools for overhauling the piston pump are shown in Figure 8. Standard T ools and Equipment: 1. T orque wrench with short extension and sockets 2. 1 ” micrometer 3. 1 ” depth micrometer 4.
15 Figure 8. Standard T ools. 1 2 3 4 5 6 Figure 9. Special Shaft Bearing Removal and Installation T ools. 1.232 1.500 “ A ” Use for “ A ” Intermediate shaft bearing installation Drive shaft bearing installation Drive shaft bearing removal 4 ” 6 ” 9 ” 1 1/2 ” heavy wall tubing .
16 Figure 1 1. Special Bearing Race Installation T ools. “ C ”“ B ” “ A ” .375 Nominal Pipe Size ABC 1 1/2 ” 4 ” 1.625 1.900 2 ” 4 ” 2.125 2.375 Schedule 80 (extra heavy) .005 Figure 12. Shaft Seal Driver . Aluminum ring Heavy wall tubing Press ring on end of tubing.
17 G. T roubleshooting T able 3 lists the common difficulties experienced with piston pumps and hydraulic systems. It also indicates probable causes and remedies for each of the troubles listed.
18 Section VI – Overhaul A. General CAUTION Before breaking a circuit connection, make certain that power is off and system pressure has been released. Lower all vertical cylinders, discharge accumulators, and block any load whose movement could generate pressure.
19 55 54 53 52 51 50 49 27 30 60 59 58 57 34 35 36 45 55 54 53 52 51 50 49 27 33 72 23 71 70 44 42 40 34 37 35 31 29 26 25 43 41 39 38 36 28 32 64 65 66 69 74 68 67 Figure 13. PVE19/21 Exploded View Refer to Service Drawings for assembly instructions and torque values.
20 Figure & Index No. Units per Assembly Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 4 1 1 1 1 1 1 1 1.
21 4 5 6 7 8 9 10 1 24 3 2 72 56 57 58 59 60 61 62 30 25 55 54 53 52 51 50 49 46 47 48 44 45 27 55 54 53 52 51 50 49 Figure 13. PVE19/21 Exploded View.
22 63 9 10 8 7 5 12 1 18 17 16 15 14 13 4 11 19 23 24 3 2 21 20 22 69 68 67 71 70 73 26 29 31 66 43 42 41 40 39 34 38 37 36 35 33 28 32 65 64.
23 3. Inspect spring (8) and (16) for wear and parallelism. Spring ends must be parallel. Replace if spring is warped or wear is evident. 4. Inspect seat (9) for wear in the area of spool contact. 5. Inspect spool (10) for excessive wear , galling, scratches, etc.
24 Figure 14. Cylinder bloc k subassembly disassembly tool. (T ighten nut, remove snap ring, loosen nut to relieve spring tens ion). Figure 14a. Cylinder Block Subassembly parts. F . Inspection Repair and Replacement 1. Check bearing (32) for scoring or brinelling of the rollers (PVE 19/21).
25 NOTE If shims (51) were destroyed during disassembly , a yoke bearing preload adjustment must be made at assembly . c. Slide the yoke from side to side to loosen the yoke bearing races (54) within the housing. The races are a normal slip fit but may be tight.
26 Figure 16. Removal of Front Bearing Race. Figure 17. Front Bearing Removal. Shaft Seal 1 1/2 ” heavy wall tubing 6 ” long. See Figure 1 1. Arbor Press Here Retaining Ring Figure 18. Front Bearing Installation. Shoulder 1 1/2 ” heavy wall tubing 6 ” long.
27 a. Assemble pintle bearings (55) on each end of the yoke and insert bearing races (54). b. Install bearing spacer (53) at one pintle end. c. Install O-Ring (52) against spacer (53) into the groove, then install a 0.010 inch shim (51) under pintle cover (50).
28 H. Disassembly of V alve Block 1. Do not disassemble check valve parts (64) through (66), unless action of the valve indicates a problem. Check the valve action with a pencil or a screwdriver . Press the check valve in against the spring, it should return and hold firm against the seat.
29 2. Install pipe plug (69) into valve block (26) and secure. 3. Assemble a new O — Ring (68) on hex plug (67) and thread plug into place. K. Shaft Bearing Preload Adjustment (PVE 19/21 only) NOTE .
30 Section VII – T est Procedure A. T est Conditions FLUID MEDIUM: SAE 10W meeting API service classification MS or equivalent. FLUID TEMPERA TURE: 120 ° F ± 5 ° F at pump outlet. Fluid entering the pump must be maintained below a maximum contamination limit of class four according to NAS1638.
31 F . Performance T est of PVE 12/19/21 Piston Pump with “ CG ” Compensator Control 1. Operate pump at 1200 RPM. Set remote control valve to minimum pressure setting. 2. Refer to Figure 23 and adjust load valve (1) and globe valve (1) to 100 PSI system pressure at P1.
32 G. Performance T est of PVE 12/19/21 Piston Pump with “ CV ” , “ CVP ” , “ CVPC ” and “ CVPD ” Compensator Control NOTE Refer to Figure 24 for location of circuit components. 1. Open load valve one (1) and turn compensator adjust - ment plug clockw ise until seated.
33 Model Compensator Pressure Setting Psig T able 9. Load sensing compensator adjustment range. Lockwire Standby Pressure P2 P @ USgpm (P2-P1) P @ Compensator Cracking Pressure (P2-P1) PVE19*-*-**-CV .
Ein wichtiger Punkt beim Kauf des Geräts Eaton Electrical PVE12 (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie Eaton Electrical PVE12 noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für Eaton Electrical PVE12 - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von Eaton Electrical PVE12 reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über Eaton Electrical PVE12 erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon Eaton Electrical PVE12 besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von Eaton Electrical PVE12 verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit Eaton Electrical PVE12. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei Eaton Electrical PVE12 gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.