Benutzeranleitung / Produktwartung GREEN LIGHT GLPX-HSW-FT des Produzenten Crestron
Zur Seite of 16
GREEN LIGHT ® EXPRESS Power Switching Cabinet GLPX-HSW-FT Introduction CRESTRON GREEN LIGHT EXPRESS power swi tching cabinets com e pre-configured with GLXP swit ching modules already i nstalled. The cabinets onl y require installat ion and wiring of feed and load circuit s.
Power Switching Cabinet GLPX- HSW-FT CRESTRON GREEN LIGHT ® EXPRESS Physical Description This section shows the dim ensions of the CRESTR ON GREEN LIGHT EXPRESS power switching cabi nets.
CRESTRON GREEN LIGHT ® EXPRESS Power Switching Cabinet GLPX-HSW-FT Dimensions of GLPX-HSW-FT-8 , -12, -16 Power Switc hing Cabine ts (Inte rnal View) 23 1/2" (597 mm) 18 15/16” (481 mm) (2X) .
Power Switching Cabinet GLPX- HSW-FT CRESTRON GREEN LIGHT ® EXPRESS Dimensions of GLPX-HSW-FT-20, -24, -28, -32 Powe r Switching Cabinets (Front, Side and Bottom View) 16 1/8” (409 mm) 39 5/8” (1.
CRESTRON GREEN LIGHT ® EXPRESS Power Switching Cabinet GLPX-HSW-FT Dimensions of GLPX-HSW-FT-20, -24, -28, -32 Powe r Switching Cabine ts (Inte rnal Vie w) 2 1/8” (55 m m) (2X) Ø 5/16” (Ø 8 mm).
Power Switching Cabinet GLPX- HSW-FT CRESTRON GREEN LIGHT ® EXPRESS Installation Observe the following wh en installing the cabinet: • The cabinet must be mounted by a licensed electrician in accordance w ith all national and local codes. Refer to the diagram below for specific requirem ents.
CRESTRON GREEN LIGHT ® EXPRESS Power Switching Cabinet GLPX-HSW-FT Wiring NOTE: All wiring must be installed in accordance w ith all local and national electrical codes. NOTE: Refer to the torque settings specifi ed on pages 8 and 9. CRE GLXP low profile switchi ng modules instal led.
Power Switching Cabinet GLPX- HSW-FT CRESTRON GREEN LIGHT ® EXPRESS Feed-Through and Load Wiring (Section A) ION: Bypass jumpers are provided on each output to allo w testing and to prot ect the m odules during CAUT installation. The ju mper shor ts the L and SW terminals so that the load circuit is energized when is on.
CRESTRON GREEN LIGHT ® EXPRESS Power Switching Cabinet GLPX-HSW-FT Control Wiring (Section B) The bottom of the cabinet contains Cresnet connections for interfacin g to the rest of the Crestron control system and a power port to provide an alternat e source of 24 volt power to the m odules.
Power Switching Cabinet GLPX- HSW-FT CRESTRON GREEN LIGHT ® EXPRESS NET Port Wiring When wiring the supplied NET connectors for connect ion to a Crestron control sy stem or other device on t he Cresnet network, use Crestron certifie d wire such as CRESNET-NP or CRESNET-P.
CRESTRON GREEN LIGHT ® EXPRESS Power Switching Cabinet GLPX-HSW-FT Testing Ma Ligh To t and t rele NO ram ma y change the settings if the Override m ode is not enabled . nual Control ting modul es can be manually controlled from the front panel. oggle the output between off and on, ta p the appropriate ON/OFF button.
Power Switching Cabinet GLPX- HSW-FT CRESTRON GREEN LIGHT ® EXPRESS Problem Solving Troubleshooting ituations. If further assistance i s required, please TROUBLE The following table provides correct ive action for possible t r ouble s contact a Crestron customer service representative.
CRESTRON GREEN LIGHT ® EXPRESS Power Switching Cabinet GLPX-HSW-FT Appendix A: Setting Module Net IDs The following pro cedure will normally be performed by an authorized Crestron representative as p.
Power Switching Cabinet GLPX- HSW-FT CRESTRON GREEN LIGHT ® EXPRESS Appendix B: Specifications Specifications for the GLXP m odules are listed i n the following table.
CRESTRON GREEN LIGHT ® EXPRESS Power Switching Cabinet GLPX-HSW-FT This page is intentionally left blank. Installation Guide – DOC. 6888B GREEN LIGHT ® EXPRESS Power Sw itching Cabinet GLPX-HSW-FT.
Power Switching Cabinet GLPX- HSW-FT CRESTRON GREEN LIGHT ® EXPRESS Return and Warranty Policies Merchandise Returns / Repair Service 1. No merchandi se may be returned for credi t, ex change or service without pri or authorization from CRESTRON. To obtain warranty service for CRESTRON product s, contact an authorized CRESTRON dealer.
Ein wichtiger Punkt beim Kauf des Geräts Crestron GREEN LIGHT GLPX-HSW-FT (oder sogar vor seinem Kauf) ist das durchlesen seiner Bedienungsanleitung. Dies sollten wir wegen ein paar einfacher Gründe machen:
Wenn Sie Crestron GREEN LIGHT GLPX-HSW-FT noch nicht gekauft haben, ist jetzt ein guter Moment, um sich mit den grundliegenden Daten des Produkts bekannt zu machen. Schauen Sie zuerst die ersten Seiten der Anleitung durch, die Sie oben finden. Dort finden Sie die wichtigsten technischen Daten für Crestron GREEN LIGHT GLPX-HSW-FT - auf diese Weise prüfen Sie, ob das Gerät Ihren Wünschen entspricht. Wenn Sie tiefer in die Benutzeranleitung von Crestron GREEN LIGHT GLPX-HSW-FT reinschauen, lernen Sie alle zugänglichen Produktfunktionen kennen, sowie erhalten Informationen über die Nutzung. Die Informationen, die Sie über Crestron GREEN LIGHT GLPX-HSW-FT erhalten, werden Ihnen bestimmt bei der Kaufentscheidung helfen.
Wenn Sie aber schon Crestron GREEN LIGHT GLPX-HSW-FT besitzen, und noch keine Gelegenheit dazu hatten, die Bedienungsanleitung zu lesen, sollten Sie es aufgrund der oben beschriebenen Gründe machen. Sie erfahren dann, ob Sie die zugänglichen Funktionen richtig genutzt haben, aber auch, ob Sie keine Fehler begangen haben, die den Nutzungszeitraum von Crestron GREEN LIGHT GLPX-HSW-FT verkürzen könnten.
Jedoch ist die eine der wichtigsten Rollen, die eine Bedienungsanleitung für den Nutzer spielt, die Hilfe bei der Lösung von Problemen mit Crestron GREEN LIGHT GLPX-HSW-FT. Sie finden dort fast immer Troubleshooting, also die am häufigsten auftauchenden Störungen und Mängel bei Crestron GREEN LIGHT GLPX-HSW-FT gemeinsam mit Hinweisen bezüglich der Arten ihrer Lösung. Sogar wenn es Ihnen nicht gelingen sollte das Problem alleine zu bewältigen, die Anleitung zeigt Ihnen die weitere Vorgehensweise – den Kontakt zur Kundenberatung oder dem naheliegenden Service.